PRINCE2 PRINCE2Practitioner Exam Syllabus Topics:

SectionObjectives
Topic 1: PRINCE2 Principles
Topic 2: PRINCE2 Processes- Initiating a Project
- Closing a Project
- Controlling a Stage
- Managing Product Delivery
- Directing a Project
- Managing Stage Boundaries
- Starting Up a Project
Topic 3: PRINCE2 Themes- Progress
- Plans
- Risk
- Quality
- Change
- Business Case
- Organization

>> PRINCE2Practitioner認定資格試験問題集 <<

PRINCE2Practitioner合格対策 & PRINCE2Practitioner資格トレーリング

PRINCE2Practitionerスタディガイドでは、無料の試用サービスを提供しているため、購入前にいくつかのトピックやソフトウェアを開く方法について学ぶことができます。 PRINCE2Practitioner学習教材の試用期間中、サンプルの質問のPDFバージョンは無料でダウンロードできます。また、PCバージョンとオンラインバージョンの両方を明確に示すことができます。 購入または試用プロセスでPRINCE2Practitioner試験の質問に問題がある場合は、いつでもご連絡いただけます。PRINCE2 PRINCE2Practitionerトレーニングガイドで専門家をリモートで支援します。

PRINCE2 Practitioner Exam 認定 PRINCE2Practitioner 試験問題 (Q127-Q132):

質問 # 127
Who is responsible for confirming stage and project progress against agreed tolerances?

正解:C

解説:
Explanation/Reference:
Starting up and Initiating a Project
Testlet 1
Scenario
Additional Information
Extract from the Communication Management Strategy.
The project information in the table below is true, but it may not be recorded under the correct heading or be in the correct document.

Using the Project Scenario, select the appropriate response to each of the following 5 questions which have been raised by the Project Board.
The project is now at the end of the initiation stage. Having decided that the Calendar project is a relatively simple project, the Project Manager combined the Starting Up a Project process and the Initiating a Project process. No Project Brief has been produced. Instead the Project Manager used the project mandate to produce a simple Project Initiation Documentation (PlO). The PlO includes the Business Case, a product checklist and several Product Descriptions, Including the Project Product Description. Short sections are also included for each of the strategies and the controls to be applied. The Project Manager has elected to use the Daily Log to record all risks, issues. lessons and quality - results.
After the initiation stage there will be two further stages during which a small number of Work Packages will be authorized. While these are being managed, the Project Manager will hold regular checkpoints, which will support the production of weekly Highlight Reports to the Project Board.


質問 # 128
PRINCE2 proposes 3 levels of Plan, which are they?

正解:C


質問 # 129
Scenario
A central government department, the Ministry of Food Hygiene (MFH), faces increasing pressure to cut costs, better manage suppliers' performance and reduce the confusion caused by inadequate internal controls, outdated standards and outdated technology. External consultants were employed to conduct a feasibility study to identify options to address the problems, and the likely costs and benefits. The following options were considered:
● Do nothing.
● Re-engineer selected business functions.
● Outsource selected business functions.
The feasibility study concluded that there was a case for outsourcing the MFH Information Technology Division and the Facilities Division (maintenance of buildings and grounds). The recommendations were:
● One service provider should be contracted to provide the services currently provided by the Information Technology Division and the Facilities Division.
● A 10-year service contract should be agreed with the selected service provider.
The feasibility study developed high-level designs of the current organization, processes, systems and operating models, plus an outline Business Case for the required project. The external consultants also made the following recommendations for the management of the project:
● Use PRINCE2.
● Set up the project with 4 management stages:
Stage 1. Standard PRINCE2 initiation activities.
Stage 2. Create detailed designs (future organization, processes, systems and operating models) and the service level agreement between MFH and the future service provider.
Stage 3. Request and evaluate proposals, select service provider and agree contract.
Stage 4. Transfer equipment and staff, transfer responsibility for service provision and run trial period.
Initial estimates indicated that the project would cost £2.5m and take two years to complete.
MFH senior management agreed that there was a case for outsourcing, and accepted the recommendations as a basis for the project. There is an expected saving of £20m over 10 years.
The Outsourcing project has completed the Starting up a Project process and is now in the initiation stage.
Because of the strategic importance of the project, the MFH Chief Executive Officer has taken the role of Executive. A PRINCE2-experienced Project Manager has been appointed from within MFH. Staff within the business functions being outsourced will work with the external consultants who conducted the feasibility study to define the detailed designs.
Which 2 statements should be recorded under the Reasons heading?

正解:C、D

解説:
Explanation/Reference:
http://www.whatisprince2.net/prince2-theme-business-case.php


質問 # 130
Scenario
Product Summary
A list of customers will be collated. This will use existing information from the Accounts department about current customers, and existing information from the Marketing department about prospective customers.
Using the tariff of mailing costs available from the Post Office, a production cost forecast will be produced to allow the CEO and the Marketing Director to decide whether to continue with the project. If they decide to continue, they will give the approval to launch the internal label design competition. Competition rules will be required to communicate details of the competition to the staff. The chosen label design will then be selected from the competition entries.
The photos for the calendar must be based on existing photo design ideas available from the Marketing department. The selected photos will be chosen from these. Monthly calendar displays will be created to show the required layout of each page.
Product Breakdown Structure (contains errors)

Extract from Stage Plan for stage 3.
(All entries are true statements but may not be shown under the correct heading or in the correct document).

Using the Project Scenario and the Extract from Stage Plan for stage 3 provided as additional intonation for this question in the Scenario Booklet, answer the following 5 questions.
The Stage Plan for stage 3 has been produced.
The Engineering Manager insists that there are to be no interruptions to operations whilst photographs are being taken of the engineering staff performing their everyday duties and operating machinery. Two weeks ago the professional photographer produced the photo session schedule based on the operational staff schedule. The operational staff schedule is produced weekly and maintained by the Engineering Manager.
None of the £500 change budget has been used to date and this is available for the stage.
Which 2 statements apply to the Planning assumptions section?

正解:A、B


質問 # 131
Which of the following statements is NOT correct?
The Learn from Experience principle suggests that lessons should be actively sought...

正解:B


質問 # 132
......

PRINCE2のPRINCE2Practitioner認定試験は今IT業界の人気試験で多くのIT業界の専門の人士がITの関連の認証試験を取りたいです。PRINCE2の認証試験の合格書を取ってから更にあなたのIT業界での仕事にとても助けがあると思います。

PRINCE2Practitioner合格対策: https://www.certshiken.com/PRINCE2Practitioner-shiken.html