Pass Guaranteed Quiz Perfect CCM - New Certified Case Manager Certification Exam (CCM) Exam Simulator

What's more, part of that PassSureExam CCM dumps now are free: https://drive.google.com/open?id=1gSSm-LYddDqbcIorf_wMul664V8gmHW8

The contents of CCM study materials are all compiled by industry experts based on the examination outlines and industry development trends over the years. And our CCM exam guide has its own system and levels of hierarchy, which can make users improve effectively. Our CCM learning dumps can simulate the real test environment. After the exam is over, the system also gives the total score and correct answer rate.

Medical Professional CCM Exam Syllabus Topics:

SectionObjectives
Quality and Outcomes Evaluation- Outcome measurement and evaluation
- Quality improvement methods
Ethics, Legal, and Regulatory Aspects- Professional ethics in case management
- Legal and regulatory compliance
Rehabilitation and Disability Management- Rehabilitation principles
- Return-to-work planning
Care Delivery and Reimbursement Methods- Insurance and reimbursement structures
- Healthcare delivery systems
Psychosocial and Support Systems- Psychosocial assessment
- Community resources and support systems

>> New CCM Exam Simulator <<

CCM New Study Questions | New CCM Test Sims

To help people pass exam easily, we bring you the latest CCM exam prep for the actual test which enable you get high passing score easily in test. Our study materials are the up-to-dated and all CCM Test Answers you practiced are tested by our professional experts. Once you have well prepared with our CCM dumps collection, you will go through the formal test without any difficulty.

Medical Professional Certified Case Manager Certification Exam (CCM) Sample Questions (Q22-Q27):

NEW QUESTION # 22
Towards the end of implementing a varied work (initiated originally by the Contractor as a "Value Engineering Proposal", relevant designs provided by the Contractor) it turned out, that there is some part of it not complying with the otherwise prevailing standards. Which statements are correct in this situation? [FIDIC Red Book, 2017 Edition] Choose all of the correct answers (multiple possibilities).

Answer: A,C

Explanation:
Option C is correct: The Contractor is obligated to rectify any non-compliance with prevailing standards promptly.
Option D is correct: The Contractor carries responsibility for design fitness and correctness, even if the Engineer has approved or not objected to the design.
Option A is incorrect; Engineer approval does not absolve the Contractor from responsibility for defective design or works.
Option B is not necessarily required; only non-compliant parts need correction, not entire varied works.
References:
FIDIC Red Book 2017 Edition, Sub-Clause 4.1 and Clause 13 - Contractor's Obligations and Variations FIDIC Contract Manager Study Guide, Module on Variations and Design Responsibilities


NEW QUESTION # 23
If the Engineer is required to obtain the Employer's prior approval to issue determinations (including such requirement in the Particular Conditions) and such approval was not given by the Employer, what possible options are at stake for the Engineer to proceed? [1999 Edition] (2 correct answers apply) Choose all of the correct answers (multiple possibilities).

Answer: B,C

Explanation:
Under the FIDIC Red Book 1999 Edition, the Engineer is generally responsible for issuing determinations on claims and contract matters. However, if the Particular Conditions require the Engineer to obtain the Employer's prior approval before issuing such determinations, the Engineer's options become limited if that approval is not granted.
* Option C (Issuing the determination to the Contractor in the form and with the content agreeable to the Employer, with a remark that it is the Employer's determination and not the Engineer's determination)is a practical approach often taken. The Engineer may issue the determination as directed or approved by the Employer but must clarify that it reflects the Employer's decision rather than the Engineer's independent determination.
* Option D (Informing the Contractor of their inability to issue the determination, due to lack of Employer's approval)aligns with transparency and procedural correctness. The Engineer should notify the Contractor if they cannot proceed with the determination, explaining the reason to avoid misunderstanding or delay.
* Option A (Remain silent and do nothing)isnot appropriate, as it may cause project delays and disputes.
* Option B (Referring the matter directly to the Dispute Adjudication Board)without a determination from the Engineer is not standard procedure under the 1999 edition. The Engineer's determination or failure to determine generally triggers the dispute resolution process, but referral is normally after due process, including issuing or attempting to issue a determination.
Hence,Options C and Dare the appropriate courses of action.
References:
FIDIC Red Book 1999 Edition, Sub-Clause 3.5 - Determinations
FIDIC Red Book 1999 Edition, Particular Conditions (typical clauses on Engineer's authority) FIDIC Contract Manager Study Guide, Module on Claims and Dispute Resolution


NEW QUESTION # 24
Under the FIDIC Red Book (edition 1999), if the Contractor as per Sub-Clause 14.2 has to ensure the Employer receives an Advance Payment Guarantee as per the standard model, what type of instrument should this be?

Answer: B

Explanation:
According to FIDIC Red Book 1999, Sub-Clause 14.2, the Advance Payment Guarantee must be a bank guarantee issued by a reputable bank acceptable to the Employer. This bank guarantee serves as security to ensure that the advance payment made by the Employer will be repaid if the Contractor fails to fulfill contractual obligations. The bank guarantee is a commonly used, reliable instrument providing direct financial assurance to the Employer.
Other instruments like surety bonds or parent company guarantees may be acceptable only if explicitly agreed, but the standard requirement is a bank guarantee.
Declaration of joint and several liability is not a typical form of guarantee for advance payments.
References:
FIDIC Red Book 1999 Edition, Sub-Clause 14.2 - Advance Payment Guarantee FIDIC Contract Manager Study Guide, Module on Payment Procedures and Guarantees


NEW QUESTION # 25
Which FIDIC Book (edition 2017) should be considered first by an Employer that is an experienced employer who knows exactly what they want from a design & engineering perspective?

Answer: B

Explanation:
The FIDIC Red Book (2017 edition) is traditionally used for construction contracts where the Employer provides the design, and the Contractor primarily executes the construction works. This form is suitable for Employers who have detailed and well-defined design and engineering requirements and want to retain control over the design.
* TheRed Bookis ideal for experienced Employers who have a clear and fixed design and require the Contractor to build accordingly.
* TheYellow Bookis typically used where the Contractor is responsible for both design and construction (design & build). It suits Employers who want to delegate design responsibility to the Contractor.
* TheSilver Bookis used for turnkey or EPC contracts where the Contractor takes full responsibility for design, procurement, construction, and commissioning, suitable for Employers seeking minimal involvement in design and execution details.
* Hence, for an Employer whoknows exactly what they wantfrom a design and engineering perspective and wants to maintain control, theRed Bookis the first and most appropriate choice.
References:
FIDIC Red Book 2017 Edition - Conditions of Contract for Construction
FIDIC Yellow Book 2017 Edition - Conditions of Contract for Plant and Design-Build FIDIC Silver Book 2017 Edition - Conditions of Contract for EPC/Turnkey Projects FIDIC Contract Manager Study Guide, Module on Contract Selection


NEW QUESTION # 26
Which of the following cases will allow the Employer to claim under the Performance Security? [2017 Edition] (2 correct answers apply) Choose all of the correct answers (multiple possibilities).

Answer: B,D

Explanation:
Under FIDIC 2017 editions, the Performance Security protects the Employer against failure by the Contractor to fulfill contractual obligations. The Employer may claim under the Performance Security in the following cases:
Option A: Failure to renew the Tender Security as required during the tendering or contract formation phase can allow Employer to make a claim, since the security guarantees the Contractor's commitments at this stage.
Option E: Failure to extend the validity of the Performance Security when requested or required breaches contractual obligations and enables the Employer to claim under the security.
Option B is incorrect because abandonment without termination notice does not immediately entitle the Employer to claim under Performance Security; formal termination is usually required first.
Option C is incorrect because submitting a claim under Sub-Clause 20.2 (Employer's claims) does not directly correlate with claiming under Performance Security.
Option D is irrelevant; instructions to replace works do not relate to Performance Security claims.
References:
FIDIC Red, Yellow, and Silver Books 2017 Edition, Sub-Clause 4.2 - Performance Security FIDIC Contract Manager Study Guide, Module on Risk Management and Securities


NEW QUESTION # 27
......

As a brand in the field, our CCM exam questions are famous for their different and effective advantages. Our professional experts have developed our CCM study materials to the best. So if you buy them, you will find that our CCM learning braindumps are simply unmatched in their utility and perfection. Our huge clientele is immensely satisfied with our product and the excellent passing rate of our CCM simulating exam is the best evidence on it.

CCM New Study Questions: https://www.passsureexam.com/CCM-pass4sure-exam-dumps.html

BTW, DOWNLOAD part of PassSureExam CCM dumps from Cloud Storage: https://drive.google.com/open?id=1gSSm-LYddDqbcIorf_wMul664V8gmHW8