| Section | Objectives |
|---|---|
| Topic 1: Electrical Skid Mounted Equipment | - Cable Support Systems - Electrical Equipment for Hazardous Classified Locations - AC Control Wiring - Equipment Grounding - Materials of Construction - Purged and Pressurized Equipment in Classified Locations - Industry Codes and Standards |
| Topic 2: Liquid-Immersed Transformers | - Design and Construction - Industry Codes and Standards |
| Topic 3: Motor Control Centers Low to Medium Voltage | - Design and Construction Standards - Main Feeder Cable Entry Compartment - Amp Capacity - Main Isolating Switch - Enclosures Types - Materials of Construction - Circuit Breakers - Ground Bus |
| Topic 4: Examination Methods, Tools and Equipment | - Functional Testing - Visual Inspections - Dimensional Inspections - Surface Preparation and Coatings Inspections - Typical Electrical Testing Techniques |
| Topic 5: Equipment Risk Assessment | - Development of Inspection and Test Plans - Report Review - Development of a Source Inspection Project Plan |
| Topic 6: Source Inspection Performance | - Inspector Conduct and Safety - Report Writing Nonconformance and Deviations - Review of Project Documents |
| Topic 7: Terms and Definitions | |
| Topic 8: Electrical Induction Motors | - Design and Construction Standards - Motor Testing - Materials of Construction |
| Topic 9: Electrical Inspection Tools and Test Equipment | |
| Topic 10: Source Inspection Management Program | |
| Topic 11: Switchgear Low and Medium Voltage | - Design and Construction - Electric Tie Breakers - Switchgear Compartment Doors - Ratings Interlocks - Metering - Wiring - Switchgear Section Compartments - Housing Frames and Enclosure Compartment - LV AC Switchgear Grounding - Current Transformers - Control Power Transformers - LV Switchgear Grounding - Circuit Breakers - Voltage Transformers - Bus Compartment |
CertJukenのAPI-SIEE問題集は的中率が100%に達することができます。この問題集は利用したそれぞれの人を順調に試験に合格させます。もちろん、これはあなたが全然努力する必要がないという意味ではありません。あなたがする必要があるのは、問題集に出るすべての問題を真剣に勉強することです。この方法だけで、試験を受けるときに簡単に扱うことができます。いかがですか。CertJukenの問題集はあなたを試験の準備する時間を大量に節約させることができます。これはあなたがAPI-SIEE認定試験に合格できる保障です。この資料が欲しいですか。では、早くCertJukenのサイトをクリックして問題集を購入しましょう。それに、購入する前に、資料のサンプルを試すことができます。そうすれば、あなたは自分自身で問題集の品質が良いかどうかを確かめることができます。
質問 # 107
The insulation requirement referred to in NEMA ICS 1 defines clearance as the shortest distance:
正解:D
解説:
The correct answer isC. InNEMA ICS 1, the termclearancerefers to theshortest distance through air between two conductive parts. This is an important insulation concept used in industrial control and electrical equipment because adequate air spacing helps prevent dielectric breakdown, flashover, and unintended arcing when equipment operates at its rated voltage. During source inspection, this matters when verifying control panels, terminals, bus arrangements, relays, and other energized components where spacing must conform to design standards and applicable codes.
OptionBdescribes a different concept known ascreepage distance, which is the shortest pathalong the surface of an insulating materialbetween conductive parts. Clearance and creepage are related but not the same, and inspectors must understand that distinction when reviewing equipment construction. OptionAis not the NEMA definition of clearance, and optionDrefers more to personnel approach boundaries or electrical safety concepts, not insulation spacing requirements.
For API source inspection of control panels and similar assemblies, verifying properair clearancesis essential to confirming safe construction and compliance with specified electrical standards.
質問 # 108
What method is used to verify tightness of accessible bolted electrical connections?
正解:A
解説:
The correct answer isD. Calibrated torque wrench. In source inspection and quality surveillance of electrical equipment, the accepted method for verifying the tightness ofaccessible bolted electrical connectionsis to check them using aproperly calibrated torque wrenchagainst the manufacturer's specified torque values. This is the most reliable way to confirm that the connection has been tightened to the required mechanical and electrical standard. Proper torque is critical because under-tightening can produce high resistance, localized heating, arcing, and eventual failure, while over-tightening can damage threads, connectors, lugs, or bus material.
The other options do not provide a true verification method.Compression of the lock-nutis not a recognized measurement of electrical connection tightness.Visual inspection of torque markingsmay indicate that tightening was performed, but it does not independently verify the actual torque achieved.Verification of an assembly check sheetonly confirms that work was recorded, not that the joint currently meets the specified torque requirement. Therefore, for source inspectors evaluating electrical assemblies, the correct and defensible method is use of acalibrated torque wrenchto verify accessible bolted electrical connections.
質問 # 109
Who is responsible for verifying that Non-conformance report NCR disposition has been properly implemented?
正解:D
解説:
The correct answer isC. Source Inspector. In API source inspection practice, once a non-conformance report NCR has been issued and a disposition such as repair, rework, use-as-is, or reject has been approved, the responsibility forverifying that the approved disposition has actually been implemented on the productbelongs to theSource Inspector. This is consistent with the inspector's core role in source inspection: to witness, verify, document, and report whether manufacturing and quality activities comply with the approved specifications, drawings, procedures, and disposition requirements.
TheVendor's Quality Managermanages the supplier's internal quality system and coordinates corrective actions, but is not the independent verifier for the purchaser's inspection function. TheInspection Coordinatoradministers scheduling, communication, and inspection planning, yet does not normally perform the physical verification at the equipment level. TheManufacturing Engineermay define or support the technical correction, but implementation verification remains an inspection responsibility. Therefore, after NCR disposition is approved, theSource Inspectormust confirm through examination, records review, and where necessary witness of reinspection or retest that the disposition was properly carried out and closed.
質問 # 110
According to API 541, subsequent to completion of manufacture and testing, the vendor shall revise and resubmit the previously supplied purchase data including all the following except:
正解:B
解説:
The correct answer isA. UnderAPI 541, after manufacture and testing are complete, the vendor is required torevise and resubmit previously supplied purchase datato reflect the final delivered motor configuration and verified test results. This normally includes items such as theoperating manual, theas-built data sheet, and theshop test data, because these documents are part of the final turnover package needed by the purchaser for installation, operation, maintenance, and records of compliance.
Arotor-balance reportmay certainly exist as part of manufacturing quality records or internal test documentation, and it can be important for vibration and mechanical integrity. However, it isnot typically identified as part of the revised and resubmitted purchase data setin the same way as the operating manual, as- built data sheet, and shop test data. In source inspection practice, this distinction matters because not every internal manufacturing record becomes part of the formal purchaser data resubmittal package. Therefore, among the listed options, the item that is the exception is therotor-balance report, makingoption Athe verified answer.
質問 # 111
Which of the following is listed as a typical transformer inspection point in the guide?
正解:A
質問 # 112
......
API-SIEE「Source Inspector Electrical Equipment」はAPIの一つ認証試験として、もしAPI認証試験に合格してIT業界にとても人気があってので、ますます多くの人がAPI-SIEE試験に申し込んで、API-SIEE試験は簡単ではなくて、時間とエネルギーがかかって用意しなければなりません。