P.S. CertShikenがGoogle Driveで共有している無料かつ新しいCivil-Engineering-Technologyダンプ:https://drive.google.com/open?id=1tnUhj9vA672fuwPry5yIQcBiZkuoxFo3
この情報の時代には、CTTAM業界にとても注目され、この強い情報技術業界にCTTAM人材が得難いです。こうしてCivil-Engineering-Technology認定試験がとても重要になります。でも、この試験がとても難しくてCTTAM通になりたい方が障害になっています。
| Section | Objectives |
|---|---|
| Professional Practice and Ethics | - Engineering Ethics - Legal and Regulatory Responsibilities |
| Geotechnical Engineering | - Soil Mechanics - Foundation Design Principles |
| Civil Engineering Materials and Construction | - Concrete, Steel, and Asphalt Properties - Construction Methods and Techniques |
| Hydraulics and Hydrology | - Fluid Mechanics Fundamentals - Drainage and Water Management Systems |
| Structural Engineering Basics | - Structural Analysis Fundamentals - Design Principles and Load Considerations |
| Transportation Engineering | - Roadway Design Basics - Traffic and Pavement Considerations |
| Surveying and CAD Applications | - Computer-Aided Design (CAD) Usage - Land Surveying Principles |
| Engineering Fundamentals | - Engineering Principles - Mathematics and Applied Calculations |
>> Civil-Engineering-Technology認定テキスト <<
あなたは無料でCivil-Engineering-Technology復習教材をダウンロードしたいですか?もちろん、回答ははいです。だから、あなたはコンピューターでCTTAMのウエブサイトを訪問してください。そうすれば、あなたは簡単にCivil-Engineering-Technology復習教材のデモを無料でダウンロードできます。そして、あなたはCivil-Engineering-Technology復習教材の三種類のデモをダウンロードできます。
質問 # 106
A project manager is aware of a faulty fall protection railing. The safety issue is reported but not remedied or documented. In the event of an incident, what is the maximum penalty for the first offence under the Occupational Health and Safety Act?
正解:B
解説:
Under Alberta's Occupational Health and Safety (OHS) legislation, enforcement includes significant penalties for contraventions, especially where hazards like fall protection are involved and an incident occurs. Alberta's official guidance on convictions under OHS legislation states that for afirst offenceunder the OHS Act, fines can beup to $500,000and/orup to 6 months in prisonper violation (with additional daily fines possible if the offence continues). This directly matches the option describing a$500,000 fine and/or six months' imprisonment. The other options (loss of business licence, mandatory five-year imprisonment, etc.) are not the stated maximum first-offence penalty in the cited OHS information. Therefore, the correct maximum penalty for the first offence isOption C.
質問 # 107
What is the most important information a civil engineering technologist should be familiar with before stepping onsite during site inspection?
正解:A
解説:
Before entering any active work site, the highest priority is controlling exposure to hazards. Construction safety standards require that personnel (including inspectors) understand and comply with the site'ssafety rules, hazard controls, and procedures(e.g., access control, PPE requirements, traffic control, emergency response, and restricted areas). The USACE Safety and Health Requirements Manual (EM 385-1-1) emphasizes pre-task planning, hazard identification, and compliance with site safety requirements, and it explicitly addresses required PPE and safety practices for personnel working in construction environments (including survey/inspection activities). Knowing the owner's name or the completion date is not a prerequisite to safe entry, and knowing headcounts/equipment lists is less critical than understanding thesite's safety proceduresthat prevent injury. Since inspectors must enter and move through hazard zones, the most important information to know beforehand is thesite safety rules and proceduresto ensm
質問 # 108
A civil engineering technologist is performing a concrete test on a site. What minimum number of cylinders should the technologist make?
正解:B
解説:
Concrete compressive strength is verified using standardized specimens that represent the delivered concrete.
A typical field/lab testing program preparesa set of cylindersso strength can be checked at standard ages and so at least one specimen remains available if a test is invalid or confirmation is required. InExperiment Design for Civil Engineering, the compressive strength procedure explicitly states thatsets of four cylindersshould be prepared and thenone cylinder from each setis tested at7, 14, 21, and 28 days. This "four-cylinder set" directly supports the minimum needed to obtain a time-history of strength development through the common curing ages used in practice and referenced by ASTM C39 age tolerances. While many projects may require additional cylinders (for 7-day early breaks, hold cylinders, or additional acceptance tests), the question asks theminimumnumber, and the documented testing set described isfour.
質問 # 109
What personal protective equipment is most important when surveying near active traffic?
正解:B
解説:
Surveying near live traffic exposes workers to struck-by hazards from vehicles and mobile equipment. Safety requirements for such environments prioritize making personnel conspicuous to drivers and equipment operators. The USACE Safety and Health Requirements Manual (EM 385-1-1) explicitly requireshigh- visibility apparel(minimum ANSI/ISEA Class 2) for workers such assurvey crews and inspectorswhen exposed to vehicular or equipment traffic, limited visibility, reduced visibility conditions, or when working close to traffic without protective barriers. This directly matches the scenario (surveying near active traffic) and identifies high-visibility apparel as the key PPE to reduce struck-by risk by improving detection and recognition of workers. While eye, hand, and hearing protection may be needed depending on hazards, the most critical single PPE item for traffic-adjacent surveying is thehigh-visibility vest/apparelrequired for worker visibility and traffic safety controls.
質問 # 110
The road cross sections shown have chainage (CH) 1+100 and 1+200. What is the volume of sub-grade material if an averaging method is applied?
正解:B
解説:
The averaging method for earthworks between two stations is theAverage End Areamethod:
whereandare the end areas at the two cross sections andis the station spacing. Here, CH 1+100 to 1+200 givesm. From the cross-section labels in the figure, the two sub-grade areas sum to4.26 m²(e.g., approximately 1.31 m² and 2.95 m²), so the average area ism². Multiply by length:m³. This is the standard approach used for roadway cut/fill and subgrade volume computations between surveyed sections.
質問 # 111
......
オンライン版はあらゆる電子機器に公開されています。同時に、Civil-Engineering-Technology学習資料のオンライン版はオフライン状態でも使用できます。オンライン状態にあるときに初めてオンラインバージョンを使用する必要があります。 Civil-Engineering-Technology学習教材のバージョンをオフラインで使用する権利があります。また、Civil-Engineering-Technologyの学習教材をさらに検討する場合は、短時間でCivil-Engineering-Technology試験に簡単に合格する必要があります。
Civil-Engineering-Technology試験対応: https://www.certshiken.com/Civil-Engineering-Technology-shiken.html
無料でクラウドストレージから最新のCertShiken Civil-Engineering-Technology PDFダンプをダウンロードする:https://drive.google.com/open?id=1tnUhj9vA672fuwPry5yIQcBiZkuoxFo3