| Certification Vendor: | Huawei |
|---|---|
| Exam Name: | HCSP-Field Data Center Facility V1.0 Certification Exam |
| Exam Number: | H20-923_V1.0 |
| Available Languages: | English, Chinese |
| Exam Duration: | N/A |
| Real Exam Qty: | N/A |
| Exam Price: | N/A |
| Passing Score: | N/A |
| Certificate Validity Period: | 3 years |
| Related Certifications: | HCSP-Field HCSA-Field HCIE-Field |
| Exam Format: | Multiple Choice, Multiple Response |
| Recommended Training: | HCSP-Field Training Courses Data Center Facility Fundamentals Learning Path |
| Exam Registration: | Huawei Talent Online |
| Sample Questions: | Huawei H20-923_V1.0 Sample Questions |
| Exam Way: | Typically delivered via Pearson VUE authorized testing centers or online proctored exam depending on region. |
| Pre Condition: | Basic understanding of IT infrastructure and data center operations is recommended; no strict formal prerequisite publicly specified. |
| Official Syllabus URL: | https://e.huawei.com/en/talent/ |
Huaweiの認定試験は現在とても人気がある試験ですね。この重要な認証資格をもうすでに手に入れましたか。例えば、もう既にH20-923_V1.0認定試験を受験したのですか。もしまだ受験していないなら、はやく行動する必要がありますよ。こんなに大切な資格を取らなくてはいけないです。ここで言いたいのは、どのようにすれば効率的にH20-923_V1.0認定試験の準備をして一回で試験に合格できるのかということです。
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
| トピック 7 |
|
| トピック 8 |
|
| トピック 9 |
|
| トピック 10 |
|
| トピック 11 |
|
| トピック 12 |
|
| トピック 13 |
|
質問 # 87
Which of the following is NOT typically a subsystem integrated within a Huawei smart modular data center (e.g., FusionModule series)?
正解:D
解説:
FusionModule solutions integrate power, cooling, monitoring, and often fire protection as facility subsystems. WAN edge routing is an IT/network function, not part of the facility module's scope.
質問 # 88
The UPS5000-H-1200 kVA and UPS5000-H-1600 kVA have two power cabinets and one bypass cabinet, and are equipped with the MDU, ECU, and surge protection box.
正解:B
解説:
This statement is incorrect because it combines two different frame configurations into one description. In the UPS5000-H family, cabinet composition depends on capacity. For the UPS5000-H-1200 kVA, the user manual's exterior description shows a single power cabinet plus a bypass cabinet, together with the MDU. In other words, 1200 kVA is not described as "two power cabinets + one bypass cabinet" in its standard cabinet topology. By contrast, the UPS5000-H-1600 kVA is a wider frame and its maintenance/structure description explicitly shows Power cabinet 1, Power cabinet 2, and a bypass cabinet, and the product documentation also includes component sections for items like the surge protection box and MDU. Because the 1200 kVA model does not match the "two power cabinets" description, the combined statement (covering both 1200 kVA and 1600 kVA) is false, even though the "two power cabinets + one bypass cabinet" part is valid for 1600 kVA.
質問 # 89
The maintenance bypass switch cannot be turned on when the UPS5000-H works in normal mode.
正解:A
解説:
In UPS5000-H operation, normal mode means the load is supplied by the inverter, and the rectifier/charger maintains the DC link and batteries. The maintenance bypass switch (maintenance bypass breaker) is a mechanical isolation path intended to keep the load powered while the UPS is taken out of service for inspection or repair. Because it changes the power path and can create unsafe or unintended parallel paths if operated incorrectly, it is not permitted to simply close the maintenance bypass switch while the UPS is in normal mode. The correct O&M logic is to perform a controlled transfer first (typically transferring the load to static bypass with proper synchronization and confirmation that bypass power is healthy), and only then close the maintenance bypass switch so the UPS can be safely isolated. This prevents disturbance to the load, avoids synchronization/transfer hazards, and protects personnel from incorrect switching operations. Therefore, the statement is true in the sense of standard UPS5000-H operating procedure and safety interlock intent.
質問 # 90
Which of the following are the user roles of Power Partner?
正解:A、B、C、D、E、F
解説:
Power Partner is Huawei Digital Power's partner service platform used to support delivery, commissioning, maintenance, and service operations across the full lifecycle of a project. To match real project workflows, the platform defines multiple user roles that align with different responsibilities and permission scopes. AStartup engineerfocuses on commissioning activities such as obtaining startup authorization, performing initial configuration, and completing functional verification. AService engineerhandles routine maintenance, inspections, troubleshooting, part replacement guidance, and closure of service cases. AProject managercoordinates delivery milestones, resource planning, and overall service execution to ensure acceptance criteria are met. AnInventory operations managermanages materials/parts flow, tracking, and availability to support timely repair and maintenance. TheDOC (Delivery/Dispatch Operations Center)role supports centralized operations such as work order dispatching, progress supervision, and process compliance.
Aservice manager of a representative officetypically oversees regional service quality, governance, and authorization control, ensuring the right people have the right access and that services are delivered according to Huawei process requirements.
質問 # 91
During routine maintenance of the lithium battery cabinet, which of the following procedure is true about replacing a faulty battery module?
正解:B
解説:
The correct sequence prioritizeselectrical safety first, then mechanical disassembly. You mustconfirm the batteries are not discharging(Step 1) to avoid working under load. Next, the cabinet must be placed into a safe powered-down state byswitching off the battery circuit breaker and long-pressing the POWER ON/OFF button to power off the cabinet(Step 6). Only after the cabinet is safely powered down should you open up the working area byremoving the front covers of the faulty module and adjacent modules(Step 3). Then youturn off the ready switchon the battery management module (Step 2) to prevent the system from re-enabling the module unexpectedly during maintenance. After that, youloosen the securing bolts and pull out the battery management module about 10 cm(Step 5) to create operating space and ensure isolation for subsequent operations. With the cabinet safely stopped, you canremove the cables and copper barsconnected to the faulty module (Step 7), and finallyremove the baffle plate and pull out the faulty battery module(Step 4).
質問 # 92
......