P.S. PassTestがGoogle Driveで共有している無料かつ新しいEDGE-Expertダンプ:https://drive.google.com/open?id=1CYLJ-lD6KcXGC0r1ZTFYd0PqcajRUcSe
EDGE-Expert試験問題の99%の合格率を確保できます。 EDGE-Expert学習ガイドを使用すると、EDGE-Expert試験に合格できます。そして、EDGEはあなたが想像できる正しいことです。必ずEDGE-Expert認定を希望します。そこで、EDGE-Expert試験資料と同じくらい優れたツールを使用して、わずか20〜30時間勉強して練習してから試験に合格してみませんか。さまざまなバージョンのExcellence in Design for Greater Efficiencies (EDGE Expert) Exam試験ブレーンダンプを使用すると、いつでもどこでも勉強と練習ができます。
| Section | Weight | Objectives |
|---|---|---|
| EDGE Software & Application | 10% | - Project documentation
|
| Energy Efficiency | 25% | - Energy-saving strategies
|
| EDGE Fundamentals & Framework | 20% | - Certification levels and criteria
|
| Materials & Embodied Carbon | 15% | - Embodied energy baseline
|
| Water Efficiency | 20% | - Water baseline assessment
|
| Certification Process & Roles | 10% | - Role of EDGE Expert
|
EDGE-Expert学習ガイドの教材には、常に卓越性と同義でした。 EDGE-Expert実践ガイドは、さまざまな資格試験に合格するかどうかに関係なく、ユーザーが簡単に目標を達成するのに役立ちます。当社の製品は、必要な学習教材を提供します。もちろん、EDGE-Expertの実際の質問は、ユーザーに試験に関する貴重な経験だけでなく、試験に関する最新情報も提供します。 EDGE-Expertの実用的な教材は、他の教材よりも高い歩留まりをもたらす学習ツールです。決心したら、私たちを選んでください!
質問 # 13
Which of the following elements is considered in EDGE to estimate water use in homes?
正解:C
解説:
The EDGE software estimates water use in homes by considering elements that contribute to potable water demand, focusing on indoor and occupant-related usage. The EDGE User Guide details the elements included in water use calculations: "In EDGE, water use in homes is estimated based on occupant activities, including water for showers, faucets, toilets, laundry, and water heating, which accounts for hot water demand in these applications. These elements are modeled using standard usage assumptions for residential buildings" (EDGE User Guide, Section 5.2: Water Efficiency Measures). Option B, water heating, is explicitly included, as it represents the hot water demand for showers, faucets, and laundry, which is a significant component of residential water use. Option A (HVAC) is incorrect, as HVAC systems primarily consume energy, not water, except in specific cases like cooling towers, which are not typical in homes: "HVAC systems in homes, such as air conditioners, do not directly contribute to water use in EDGE calculations, unlike in commercial buildings with cooling towers" (EDGE Methodology Report Version 2.0, Section 4.2: Water Savings Calculations). Option C (exterior fountains) is also excluded, as EDGE focuses on indoor water use: "Exterior water use, such as for fountains or irrigation, is not typically included in EDGE's water use estimates for homes, unless specifically modeled as an optional measure, which fountains are not" (EDGE User Guide, Section 5.3: Additional Water Efficiency Measures). Option D (solar water heaters) is a measure to reduce energy use for water heating, not an element of water use itself: "Solar water heaters reduce the energy demand for water heating but do not change the volume of water used, which is what EDGE estimates for water use in homes" (EDGE User Guide, Section 4.2: Energy Efficiency Measures). The EDGE Methodology Report further specifies: "Water use in homes is calculated based on per-capita assumptions for activities like showering, flushing, and water heating, ensuring a standardized baseline for savings calculations" (EDGE Methodology Report Version 2.0, Section 4.2: Water Savings Calculations). Thus, water heating (Option B) is the element considered in EDGE to estimate water use in homes.
Reference:EDGE User Guide Version 2.1, Section 5.2: Water Efficiency Measures, Section 5.3: Additional Water Efficiency Measures, Section 4.2: Energy Efficiency Measures; EDGE Methodology Report Version
2.0, Section 4.2: Water Savings Calculations.
質問 # 14
How many measures need to be selected in order to meet the EDGE Energy Standard?
正解:B
解説:
In the EDGE system, compliance with the Energy Standard is not achieved by selecting a fixed number or a fixed percentage of measures. Instead, the project must demonstrate that the selected package of energy measures, when modeled in the EDGE software, achieves the minimum required energy savings compared to the local baseline. Because projects differ by climate, building type, geometry, and system choices, the number of measures needed can vary widely. One project might reach the target with a few high-impact measures, while another may need many smaller improvements.
At the same time, the curriculum explains that some measures are marked as required. These are mandatory prerequisites within the EDGE methodology and must be implemented where applicable. A project cannot claim compliance while omitting required measures. Therefore, while you may choose any combination of optional measures to reach the energy savings threshold, you must still implement all required measures as part of meeting EDGE requirements.
Options A, B, and C incorrectly imply a universal count-based rule. The only correct statement is that the project must implement at least all required measures, and then add any additional measures necessary to achieve the minimum energy savings target.
質問 # 15
The Base Case for utility costs:
正解:C
解説:
In EDGE, the Base Case is a standardized benchmark used to calculate utility cost savings, reflecting typical resource consumption for a building in its location and typology. The term "virtual energy" in EDGE refers to the energy required for heating, cooling, lighting, and other systems, modeled as if the building operates under typical conditions without efficiency measures. The EDGE User Guide explains how utility costs are calculated: "The Base Case for utility costs includes the cost of virtual energy, which represents the modeled energy consumption for the building type in the absence of efficiency measures, alongside water consumption, using localtariffs to estimate financial impacts" (EDGE User Guide, Section 2.3: Using the EDGE App). Option B, includes the cost of virtual energy, aligns with this approach, as the Base Case accounts for all modeled energy use to establish a baseline for savings. Option A (excludes the cost of virtual energy) is incorrect, as virtual energy is a core component of the Base Case: "Virtual energy in EDGE is the theoretical energy use calculated for the Base Case, including heating, cooling, and lighting, and its cost is always included in utility cost calculations" (EDGE Methodology Report Version 2.0, Section 4.4: Cost Savings Calculations). Option C (excludes the cost of virtual energy only in homes) and Option D (includes the cost of virtual energy only in homes) are also incorrect, as the treatment of virtual energy is consistent across all typologies: "The Base Case methodology, including the inclusion of virtual energy costs, applies uniformly to all building types in EDGE, whether homes, hotels, or offices, to ensure a fair comparison of savings" (EDGE User Guide, Section 2.3: Using the EDGE App). The EDGE Methodology Report further clarifies: "Utility costs in the Base Case are derived from virtual energy and water consumption, reflecting typical usage patterns for the building type and location, ensuring that savings calculations are comprehensive and include all relevant energy demands" (EDGE Methodology Report Version 2.0, Section 4.4: Cost Savings Calculations). This consistent inclusion of virtual energy costs across all typologies makes Option B the correct answer.
Reference:EDGE User Guide Version 2.1, Section 2.3: Using the EDGE App; EDGE Methodology Report Version 2.0, Section 4.4: Cost Savings Calculations.
質問 # 16
Which statement is correct about a "required" measure?
正解:B
解説:
In the CBCI EDGE curriculum, a "required" measure refers to a measure that must be implemented in the project as part of meeting the EDGE certification criteria. Required measures are mandatory and cannot be excluded if the project is to achieve certification. Their implementation is verified during the design audit and confirmed during the site audit stage.
Option A is incorrect because simply assessing a measure is not sufficient; a required measure must be physically incorporated into the building design and construction. Option C is incorrect because a Special Ruling Request is used in exceptional cases to seek clarification or alternative compliance pathways, but required measures do not depend on SRR approval to be implemented. Option D is also incorrect because the concept of meeting or exceeding the baseline relates to performance calculations for savings, not specifically to the definition of a required measure.
Therefore, under the EDGE framework, a required measure is one that must be implemented in the project to comply with certification requirements, making option B the correct answer.
質問 # 17
Which of the following is NOT a characteristic of the EDGE standard?
正解:D
解説:
The EDGE standard is designed to be a practical, focused tool for green building certification, emphasizing specific resource efficiency metrics. The EDGE User Guide describes its characteristics: "EDGE is a simple, fast, and smart tool for green building certification. It provides an intuitive interface with a powerful engine that accounts for local climate and building use (simple), identifies measures with the best return on investment (fast), and displays capital costs and payback periods (smart)" (EDGE User Guide, Section 1.1:
Introduction to EDGE). Options A, C, and D align with these descriptions. However, Option B (holistic approach that takes into account wider sustainability issues) is not a characteristic of EDGE, as the standard focuses narrowly on energy, water, and embodied energy in materials, not broader sustainability issues like biodiversity or social equity. This is clarified in the EDGE Certification Protocol: "EDGE is not a holistic sustainability standard; it specifically targets resource efficiency in energy, water, and materials, excluding wider sustainability metrics such as indoor air quality or ecological impact" (EDGE Certification Protocol, Section 1.2: Scope of EDGE Standard). Thus, Option B is not a characteristic of the EDGE standard.
Reference: EDGE User Guide Version 2.1, Section 1.1: Introduction to EDGE; EDGE Certification Protocol, Section 1.2: Scope of EDGE Standard.
質問 # 18
......
どのようにすればもっと楽にEDGEのEDGE-Expert認定試験に合格することができるかについて考えたことがありますか。試験に合格する秘密を見つけましたか。それを行う方法がわからない場合、私は教えてあげましょう。実際には、認定試験に合格できる方法が多くあります。試験に関連する知識を一生懸命習得することがただ一つの方法です。今はそのようにしていますか。しかし、これが一番時間を無駄にして、望ましい効果を得られない方法です。それに、毎日仕事で忙しいあなたは、恐らく試験に準備する充分な時間がないでしょう。では、PassTestのEDGE-Expert問題集を試しましょう。この試験参考書はきっとあなたに思えぬ良い結果を与えられます。
EDGE-Expert資格認定: https://www.passtest.jp/EDGE/EDGE-Expert-shiken.html
P.S. PassTestがGoogle Driveで共有している無料かつ新しいEDGE-Expertダンプ:https://drive.google.com/open?id=1CYLJ-lD6KcXGC0r1ZTFYd0PqcajRUcSe