CTTAM Civil-Engineering-Technology Exam Syllabus Topics:

SectionWeightObjectives
Structural Design Fundamentals20%- Structural analysis
  • 1. Analysis of beams, columns, and frames
  • 2. Load determination and load paths
- Design of structural elements
  • 1. Steel and timber design basics
  • 2. Reinforced concrete design
Municipal Engineering20%- Wastewater and stormwater management
  • 1. Sanitary and storm sewer design
  • 2. Drainage and flood control
- Water supply and distribution
  • 1. Water system design and hydraulics
  • 2. Water quality and treatment basics
Surveying20%- Surveying equipment and methods
  • 1. GPS and modern surveying technologies
  • 2. Total station and leveling instrument operation
- Measurement and calculation techniques
  • 1. Computation and adjustment of survey data
  • 2. Field measurement procedures
Transportation Engineering20%- Traffic engineering
  • 1. Signal design and traffic control
  • 2. Traffic flow and capacity analysis
- Highway and road design
  • 1. Geometric design principles
  • 2. Pavement design and materials
Materials Testing20%- Soil mechanics and testing
  • 1. Soil classification and properties
  • 2. Compaction and bearing capacity tests
- Concrete and asphalt testing
  • 1. Field and laboratory testing procedures
  • 2. Mix design and quality control

>> Civil-Engineering-Technology인증덤프 샘플체험 <<

최신 Civil-Engineering-Technology인증덤프 샘플체험 인증 시험덤프

CTTAM Civil-Engineering-Technology 덤프는 CTTAM Civil-Engineering-Technology 시험의 모든 문제를 커버하고 있어 시험적중율이 아주 높습니다. ExamPassdump는 Paypal과 몇년간의 파트너 관계를 유지하여 왔으므로 신뢰가 가는 안전한 지불방법을 제공해드립니다. CTTAM Civil-Engineering-Technology시험탈락시 제품비용 전액환불조치로 고객님의 이익을 보장해드립니다.

최신 CTTAM C-E-T Civil-Engineering-Technology 무료샘플문제 (Q101-Q106):

질문 # 101
Which of the following is employee's responsibility in regard to PPE?

정답:A

설명:
Employee responsibilities for PPE typically includeusing PPE as required and checking it is serviceable before use, then reporting defects. Employer responsibilities generally include hazard assessment, selecting
/providing appropriate PPE, ensuring training, and maintaining a program. EM 385-1-1 reflects this division of duties: it requires PPE to be used to control exposures and establishes training requirements covering key aspects of PPE, includinginspection/testingand proper care. Practical safety guidance for workers also states that employees shouldcheck PPE for faults before useand report issues. Among the optionsuployee duty that is broadly applicable across PPE types and aligns with standard safety systems: workers verify their equipment is not damaged, fits correctly, and is suitable for the task before entering the hazard area.
Therefore, the correct answer isA.


질문 # 102
A gas fireplace has been installed by the general contractor's sub-trade. After numerous repair attempts, it is still not operating properly. How should the owner correct the problem?

정답:C

설명:
Under standard construction contracting practice, thegeneral contractor (prime contractor)is responsible for the overall delivery of the work, including coordination and quality of subcontractors' work and correction of deficiencies that fall under the contract's quality obligations and warranty requirements. Warranties are specifically described as requiring the contractor to repair or replace deficient work within a specified period at the contractor's expense. Since the subcontractor is contractually accountable to the general contractor (not directly to the owner in a typical arrangement), the owner's most effective and proper route is to require the general contractorto address the deficiency, manage the subcontractor, and ensure the system performs as required. Escalating directly to a new contractor and back-charging can be possible, but it is typically a later remedy after formal notice and contract procedures. Contacting the manufacturer may help diagnose, but it does not replace contractual responsibility for correction. Therefore, the correct action is toask the general contractor to review and correct the installation.


질문 # 103
The graph below is used for tracking progress and costs of a project for a client. What can be concluded about the project at week 10?

정답:D

설명:
This type of chart is anEarned Value Management (EVM)progress/cost graph, typically showingPlanned Value (PV),Earned Value (EV), andActual Cost (AC)over time. Schedule performance at a given date (week 10) is determined by comparingEVtoPV. IfEV < PV, the amount of work actually accomplished (earned) is less than what was planned by that date, meaning the project isbehind schedule(Schedule Performance Index). In the provided graph, atweek 10theEV curve is below the PV curve, so the project has completed less work than planned by week 10, indicating schedule slippage. Budget performance is assessed separately by comparingEVtoAC(Cost Performance Index), but the question asks what can be concluded at week 10: the clear conclusion supported by the curves isbehind schedulebecause EV is lower than PV at week 10.


질문 # 104
Why is it important to keep daily site diaries and inspection data, such as sketches, notes, and photos?

정답:B

설명:
Daily site diaries and inspection records (notes, sketches, and photos) are maintained to create a contemporaneous, objective recordof what occurred on site each day-work activities, progress, site conditions, instructions, and issues encountered. These records are central to effective construction administration because projects routinely face differing site conditions, changes, and coordination issues that can lead to disputes if not documented. Construction-phase legal and contractual issues frequently arise from variability in site conditions and from variations/change orders that modify scope, schedule, and compensation; accurate daily documentation supports verification of events, quantities, delays, and corrective actions. Maintaining reliable daily records also supports tracking deficiencies and follow-up, confirming compliance observations, and providing traceability for decisions and communications. In civil systems construction, change orders are treated as formal contract modifications and disputes can be minimized by strong site investigation andthorough documentationof field realities and decisions.


질문 # 105
What test should be used to determine the compressive strength of concrete?

정답:A

설명:
Concrete compressive strength is determined by loading astandard molded specimento failure in a compression testing machine and calculating strength from the peak load divided by the specimen's cross- sectional area. The common acceptance specimen for cast-in-place concrete is acylinder, produced and cured using standardized procedures to ensure that test results reliably represent the delivered concrete. Civil engineering materials references describe compressive strength testing as the principal measure used to verify compliance with specified strength (f'c), and that cylinder specimens are tested in compression to determine the maximum stress sustained.
A slump test measures workability/consistency, an air test measures entrained air content, and sieve testing measures aggregate gradation-none of these directly measure compressive strength. Therefore, the required test for compressive strength is thecylinder test (Option B).


질문 # 106
......