If you take a little snack, you will find that young people are now different. They made higher demands on themselves. This is a change in one's own mentality and it is also a requirement of the times! Whether you want it or not, you must start working hard! And our LEED-AP-O-M exam materials may slightly reduce your stress. With our LEED-AP-O-M study braidumps for 20 to 30 hours, we can proudly claim that you can pass the exam easily just as a piece of cake. And as long as you try our LEED-AP-O-M practice questions, you will love it!
| Certification Vendor: | U.S. Green Building Council (USGBC) / Green Business Certification Inc. (GBCI) |
|---|---|
| Exam Name: | LEED AP Operations + Maintenance Specialty Exam |
| Exam Number: | LEED-AP-O-M |
| Exam Duration: | 120 minutes |
| Certificate Validity Period: | 2 years (requires 30 CE hours for recertification) |
| Available Languages: | English, Brazilian Portuguese, Arabic, Spanish, French, Chinese |
| Related Certifications: | LEED Green Associate LEED AP ND LEED AP ID+C LEED AP BD+C LEED AP Homes |
| Passing Score: | 170 (scaled 125โ200) |
| Real Exam Qty: | 100 |
| Exam Price: | $250 (USGBC Member), $350 (Non-Member); Combined: $400 / $550 |
| Exam Format: | Scenario-based questions, Multiple-choice, Computer-based |
| Recommended Training: | LEED AP O+M Candidate Handbook LEED Reference Guide for O+M |
| Exam Registration: | Prometric GBCI Scheduling USGBC Credentials Portal |
| Sample Questions: | USGBC LEED-AP-O-M Sample Questions |
| Exam Way: | In-person at Prometric centers / Remotely proctored online |
| Pre Condition: | Active LEED Green Associate credential or pass both Green Associate + AP O+M in combined exam |
| Official Syllabus URL: | https://www.usgbc.org/credentials/leed-ap-operations-maintenance |
"There is no royal road to learning." Learning in the eyes of most people is a difficult thing. People are often not motivated and but have a fear of learning. However, the arrival of LEED-AP-O-M study materials will make you no longer afraid of learning. LEED-AP-O-M study material provides you with a brand-new learning method that lets you get rid of heavy schoolbags, lose boring textbooks, and let you master all the important knowledge in the process of making a question. Please believe that with LEED-AP-O-M Study Materials, you will fall in love with learning.
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
NEW QUESTION # 23
A LEED AP Operations and Maintenance project is at the end of the second month of the performance period when the team notices that the water meter readings for one of the two submeters is not being recorded. What advice should the LEED AP give the project team in order to comply with Water Efficiency Credit, Water Metering?
Answer: C
Explanation:
Short Explanation: The LEED AP O+M Reference Guide states that "If a meter fails during the performance period, the project team must extend the performance period to obtain the required three months of data." Therefore, the best advice is to extend the performance period to gain the full three months of weekly water meter readings.
References:
* LEED AP O+M Reference Guide, Water Efficiency Credit, Water Metering, page 114
* LEED QUALIFICATION GUIDE - v4 - Sloan, page 2
* Building-Level Water Metering and Water Metering | LEEDuser
NEW QUESTION # 24
A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project ' s gross floor will be completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most appropriate one to use?
Answer: A
Explanation:
Before selecting a LEED rating system, a project must satisfy the applicable Minimum Program Requirements, including the requirement that the project be located in a permanent location on existing land.
USGBC specifically identifies a mobile home as an example of a "mobile structure" that is not eligible for LEED certification when it is not anchored to a particular site with a permanent-type foundation and is designed to be moved.
Therefore, based on the question ' s characterization of the project as a mobile home and the absence of any information establishing a permanent foundation, No rating system is the appropriate answer.
The fact that 90% of the gross floor area will be complete does not override this fundamental eligibility condition. Rating-system selection criteria such as percentage of completed floor area are considered only after the project ' s basic LEED eligibility has been established.
A critical qualification is that a structure commonly described as a mobile home could potentially become eligible if it is permanently anchored to a site and constructed in accordance with codes applicable to permanent buildings. In that circumstance, an appropriate residential rating system would then be evaluated.
USGBC currently directs low-rise residential projects toward the applicable residential LEED systems rather than automatically toward commercial LEED v5 BD+C.
Reference Topic: LEED Process - Minimum Program Requirements; Permanent Location on Existing Land; Rating System Selection.
NEW QUESTION # 25
Which of the following is required to report fuel data for a project site where propane is delivered but no installed meters are present, as outlined in the EAp2: Energy Monitoring and Reporting?
Answer: A
Explanation:
EAp2: Energy Monitoring and Reporting requires whole-building energy consumption to be tracked by energy source. Permanent meters or submeters are normally required for electricity, natural gas, district thermal energy, and other applicable sources. However, LEED recognizes that delivered fuels such as propane, oil, diesel, and wood may not be connected to permanent meters.
When such delivered fuel is not metered or submetered, LEED requires the project to track and report the delivery date and amount delivered. Therefore, Option B directly reproduces the required reporting method.
Weekly tank-level measurements are not specified as the compliance method. They may be useful for internal facility management, but they do not replace the documented delivery records required by the prerequisite.
Similarly, historical estimates should not be substituted for actual delivery data when reliable purchase and delivery information exists.
These delivery records are then incorporated into the project ' s monthly energy-use reporting over the consecutive 12-month performance period. Accurate fuel accounting is important because propane combustion contributes both to total site-energy consumption and to direct greenhouse-gas emissions.
The underlying requirement is therefore traceability: fuel use must be supported by quantifiable records rather than assumed or retrospectively estimated.
Reference Topic: LEED v5 O+M - EAp2 Energy Monitoring and Reporting; Delivered Fuels; Propane Delivery Date and Quantity.
NEW QUESTION # 26
An office building pursuing LEED O+M certification is evaluating the building compliance to IPp4: Current Facilities Requirements and O+M Plan. The facility manager is tasked with revisiting the preventive maintenance plan to identify discrepancies.
Which of the following details should the manager carefully check and properly update in the plan?
Answer: A
Explanation:
Option C describes the information that belongs specifically to the preventive maintenance plan. The plan must establish the preventive-maintenance activities required for building systems and equipment and provide sufficient detail regarding the tasks associated with each activity and their required frequency. USGBC guidance identifies daily, weekly, monthly, quarterly, and annual maintenance activities, depending on manufacturer requirements, vendor requirements, industry practice, and automated work-order systems.
The facility manager should also examine commonly overlooked systems-such as domestic hot-water equipment, tenant lighting, and building automation systems-and identify systems maintained by third parties together with the current status of those maintenance contracts. Responsibility for maintenance activities is also relevant to effective implementation.
Options A and B contain information that is indeed required within the broader Current Facilities Requirements and O+M documentation, but they describe different elements. Mechanical and electrical system descriptions belong principally to the systems narrative, while occupancy schedules, equipment run times, HVAC set points, lighting levels, and seasonal adjustments form part of operating requirements and sequences.
Because the question specifically asks what should be reviewed within the preventive maintenance plan, Option C is the precise answer.
Reference Topic: LEED v5 O+M - IPp4 Current Facilities Requirements and O+M Plan; Preventive Maintenance Plan, Tasks, Frequencies, Responsibility and Contract Status.
NEW QUESTION # 27
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
Answer: D
Explanation:
The Water Efficiency Prerequisite, Indoor Water Use Reduction, under LEED AP O+M V4.1, includes the reduction of water use in various indoor appliances. The appliances included in this prerequisite are those that contribute significantly to indoor water use. Among the options provided, residential clothes washers and dishwashers are included. These appliances use a significant amount of water and are therefore important targets for water use reduction1.
References:
* LEED v4 Indoor Water Use Reduction Calculator
* Indoor water use reduction | U.S. Green Building Council
* LEED v4 water efficiency credits: Do you know the new standards?
* LEED QUALIFICATION GUIDE - v4 - Sloan
NEW QUESTION # 28
......