P.S.CertJukenがGoogle Driveで共有している無料の2026 USGBC LEED-AP-O-Mダンプ:https://drive.google.com/open?id=1vMY4Wfx3oG1FPMA60tmQUNO69SWLlbGE
USGBCのLEED-AP-O-M準備トレントを学習する過程でCertJuken、プロセス全体を通してお客様にサービスを提供し、バックオフィススタッフが24時間無料のオンラインコンサルティングを提供します。 LEED-AP-O-M学習準備を購入した後、インストールと使用に問題がある場合は、リモートのオンラインガイダンスを提供する専任スタッフがいます。 また、LEED AP Operations + Maintenance Exam質問の内容についてご質問がある場合は、お気軽にメールでお問い合わせください。LEED AP Operations + Maintenance Exam最初にお答えできるように最善を尽くします。 すべての声について、スタッフは忍耐強く耳を傾けます。 使用中に、LEED-AP-O-Mテスト資料に提案を提案することもできます。フィードバックに最も注意を払います。
| Certification Vendor: | U.S. Green Building Council (USGBC) / Green Business Certification Inc. (GBCI) |
|---|---|
| Exam Name: | LEED AP Operations + Maintenance Specialty Exam |
| Exam Number: | LEED-AP-O-M |
| Exam Price: | $250 (USGBC Member), $350 (Non-Member); Combined: $400 / $550 |
| Exam Duration: | 120 minutes |
| Available Languages: | Brazilian Portuguese, Arabic, French, Chinese, Spanish, English |
| Certificate Validity Period: | 2 years (requires 30 CE hours for recertification) |
| Real Exam Qty: | 100 |
| Related Certifications: | LEED Green Associate LEED AP BD+C LEED AP Homes LEED AP ID+C LEED AP ND |
| Passing Score: | 170 (scaled 125–200) |
| Exam Format: | Multiple-choice, Computer-based, Scenario-based questions |
| Recommended Training: | LEED AP O+M Candidate Handbook LEED Reference Guide for O+M |
| Exam Registration: | USGBC Credentials Portal Prometric GBCI Scheduling |
| Sample Questions: | USGBC LEED-AP-O-M Sample Questions |
| Exam Way: | In-person at Prometric centers / Remotely proctored online |
| Pre Condition: | Active LEED Green Associate credential or pass both Green Associate + AP O+M in combined exam |
| Official Syllabus URL: | https://www.usgbc.org/credentials/leed-ap-operations-maintenance |
LEED-AP-O-M実践ガイドまたはシステムの内容が更新された場合、更新された情報を電子メールアドレスに送信します。もちろん、製品の更新状況については、当社の電子メールをご覧ください。 LEED-AP-O-M模擬試験を使用してLEED-AP-O-M試験に合格するように協力できることを願っています。コンテンツの更新に加えて、LEED-AP-O-Mトレーニング資料のシステムも更新されます。ご意見がありましたら、私たちの共通の目標は、ユーザーが満足する製品を作成することであると言えます。学習を開始した後、メールをチェックするための固定時間を設定できることを願っています。
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
質問 # 18
Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?
正解:A
質問 # 19
What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
正解:C
解説:
The LEED AP Operations + Maintenance (LEED AP O+M) V4.1 guide specifies that for the Energy and Atmosphere Prerequisite, Minimum Energy Performance, the allowed maximum tenant space exclusion is
10% of the gross floor area. This means that when calculating energy performance, up to 10% of the total floor area of the building can be excluded. This could be due to various reasons such as spaces being unoccupied or not in use.
References: = LEED v4: Building Operations + Maintenance Guide, LEED v4: Building Design + Construction Guide, Minimum Energy Performance Calculator - ASHRAE 90.1 - 2010, LEED v4 energy update - U.S. Green Building Council The Energy and Atmosphere Prerequisite, Minimum Energy Performance, allows for certain exclusions to accommodate diverse building types and uses. One such provision permits the exclusion of up to 10% of the gross floor area (GFA) from the energy performance calculations. This allowance is designed to provide flexibility for spaces that may not be fully occupied or operational during the performance period, such as tenant spaces undergoing renovation or spaces with atypical energy usage. By excluding a limited portion of the GFA, the prerequisite acknowledges the variability in building occupancy and use, ensuring that the energy performance assessment is both fair and representative of the building's typical operations.
References:
* The allowance for excluding up to 10% of the gross floor area from the energy performance calculations is detailed in the LEED for Building Operations and Maintenance reference guide, specifically under the Energy and Atmosphere Prerequisite, Minimum Energy Performance. This guideline is part of the LEED AP O+M trainingmaterials, which emphasize the importance of accommodating diverse building uses and occupancy levels in the pursuit of sustainable building operations.
質問 # 20
Which of the following people are required to be listed on the LEED project registration page?
正解:A
解説:
The owner is the only person who is required to be listed on the LEED project registration page. The owner is the entity that has the authority to implement the LEEDproject and sign the certification agreement. The owner's representative, who can be a LEED AP or another person authorized by the owner, can register the project on behalf of the owner, but must also upload a confirmation of agent authority form. The primary architect, the commissioning agent, and other project team members are not required to be listed on the registration page, but can be added later as team members in LEED Online.
References:
* Registering a project in LEED Online
* LEED AP O+M Candidate Handbook, page 7
質問 # 21
When tracking refrigerant leakage for EAc3: Enhanced Refrigerant Management Performance, what information should be recorded during the recharge process?
正解:A
解説:
Refrigerant recharge quantities must be tracked by refrigerant type and weight because LEED uses the amount of leaked refrigerant, together with its global warming potential, to evaluate refrigerant emissions performance. Under EAp4: Fundamental Refrigerant Management, projects must track the refrigerant recharge or total refrigerant procurement during the reporting period and report the total GWP associated with leaked refrigerants.
This information directly supports EAc3: Enhanced Refrigerant Management Performance. EAc3 ' s refrigerant leakage emissions ratio incorporates the quantity of leaked refrigerant and its GWP relative to the refrigerant charge present in project systems. Consequently, the weight of refrigerant added during recharge provides the fundamental quantitative evidence needed to characterize leakage.
System pressure may be diagnostically useful to an HVAC technician when identifying operating conditions or potential leaks, but it does not quantify the mass of refrigerant lost. Likewise, building temperature does not establish refrigerant leakage.
For accurate management, the project maintains an equipment inventory identifying refrigerant type, GWP, and system charge; performs leak inspections; documents recharge events; and tracks refrigerant quantities over the applicable reporting period. For initial certification, LEED also establishes minimum tracking requirements during the 12-month reporting period.
Reference Topic: LEED v5 O+M - EAp4 Fundamental Refrigerant Management; EAc3 Enhanced Refrigerant Management Performance; Refrigerant Leakage Tracking.
質問 # 22
How can a building owner promote both energy efficiency and thermal comfort in a building?
正解:C
解説:
To promote both energy efficiency and thermal comfort in a building, instituting a flexible dress code that permits seasonally appropriate clothing is an effective strategy. This approach allows occupants to adjust their clothing to suit the indoor temperature, which can lead to more relaxed thermostat settings and reduced energy use for heating or cooling.References:LEED AP Operations + Maintenance Reference Guide, Indoor Environmental Quality section.
質問 # 23
......
LEED-AP-O-M学習指導: https://www.certjuken.com/LEED-AP-O-M-exam.html
P.S. CertJukenがGoogle Driveで共有している無料かつ新しいLEED-AP-O-Mダンプ:https://drive.google.com/open?id=1vMY4Wfx3oG1FPMA60tmQUNO69SWLlbGE