DumpTOP는International Code Council 93-Tall-Mass-Timber-Buildings시험을 패스할 수 있는 아주 좋은 사이트입니다. DumpTOP은 아주 알맞게 최고의International Code Council 93-Tall-Mass-Timber-Buildings시험문제와 답 내용을 만들어 냅니다. 덤프는 기존의 시험문제와 답과 시험문제분석 등입니다. DumpTOP에서 제공하는International Code Council 93-Tall-Mass-Timber-Buildings시험자료의 문제와 답은 실제시험의 문제와 답과 아주 비슷합니다.
| Section | Objectives |
|---|---|
| Topic 1: General & Construction Types | - Construction Classification — Type IV-A, IV-B, IV-C
|
| Topic 2: Fire-Resistance & Protection | - Concealed Spaces Protection - Fire-Resistance-Rated Assemblies - Noncombustible Protection & Encapsulation |
| Topic 3: Mass Timber Materials | - CLT, Glulam, NLT, SCL and Engineered Wood Products |
| Topic 4: Structural & Connection Inspection | - Framing and Structural Elements - Connection Design and Protection |
| Topic 5: Construction Fire Safety | |
| Topic 6: Inspection Duties & Documentation | - Inspection Reporting and Compliance Verification - Statement of Special Inspections |
>> 93-Tall-Mass-Timber-Buildings덤프샘플문제 다운 <<
DumpTOP을 선택함으로 100%인증시험을 패스하실 수 있습니다. 우리는International Code Council 93-Tall-Mass-Timber-Buildings시험의 갱신에 따라 최신의 덤프를 제공할 것입니다. DumpTOP에서는 무료로 24시간 온라인상담이 있으며, DumpTOP의 덤프로International Code Council 93-Tall-Mass-Timber-Buildings시험을 패스하지 못한다면 우리는 덤프전액환불을 약속 드립니다.
질문 # 28
Regarding water supply for the protection of buildings under construction, when combustible building materials of the building under construction are delivered to a site, the minimum fire flow provided shall be
_____ gpm.
정답:C
설명:
The required minimum fire flow is 500 gallons per minute , making option C correct.
2021 IFC Section 3313.1 requires an approved temporary or permanent water supply for fire protection to become available at specified stages of construction, including when combustible building materials arrive on the site. Section 3313.2 then establishes the specific requirement: when combustible building materials for the building under construction are delivered, a minimum fire flow of 500 gpm must be provided.
The hydrant supplying this flow must be located within 500 feet of the combustible building materials as measured along an approved fire apparatus access lane. If a single hydrant cannot provide the required coverage because of site configuration, additional hydrants are required.
The 500-gpm value in this question is the construction-stage minimum associated with combustible-material delivery. It should not be mistaken for the final required fire flow of the completed building. Depending on construction type, fire separation distance, building area, and subsequent phases of vertical construction, the required available water supply can be greater.
For mass timber projects, verifying this water supply before large timber packages arrive is a critical construction-phase fire-safety control.
References/Topics: 2021 IFC Sections 3313.1 and 3313.2; combustible building materials; minimum construction fire flow.
질문 # 29
In Type IV-C construction, a connection between two members of the primary structural frame supporting a floor is required to be protected to achieve a minimum fire-resistance rating of:
정답:A
설명:
The required minimum fire-resistance rating is two hours , making option C correct. Table 601 assigns a two- hour fire-resistance rating to the primary structural frame in Type IV-C construction. The structural connection between members of that rated frame cannot become a premature failure point in the load path.
IBC Section 2304.10.1 specifically addresses structural connections in Types IV-A, IV-B, and IV-C mass timber construction. Connection protection must provide the fire-resistance performance required for the connected building element. This can be accomplished through protected connection configurations, approved fire testing, or engineering analysis satisfying the applicable code criteria.
The connection includes more than the visible steel plate or bolt. Fasteners, connectors, concealed steel, bearing zones, and portions of the timber participating structurally in the connection must collectively maintain the required performance. A one-hour or 1½-hour connection would undermine a structural frame required to remain functional for two hours. Three hours is the primary-frame rating associated with Type IV- A, not the Type IV-C condition specified here.
The inspector should verify protection thickness, wood cover, gypsum layers, hardware embedment, edge conditions, and approved connection geometry before concealment.
References/Topics: 2021 IBC Table 601; Section 2304.10.1; fire-resistant structural connections in Types IV- A, IV-B, and IV-C.
질문 # 30
Refer to the figure by clicking on the EXHIBIT button above.

In Type IV-B construction, unprotected portions of mass timber as shown in the Figure is limited to an area equal to not more than what percentage of the base floor area?
정답:A
설명:
The figure depicts an unprotected portion of the mass timber ceiling . For Type IV-B construction, Section
602.4.2.2.2, Exception 1.1, limits unprotected ceiling areas-including attached mass timber beams-to 20 percent of the floor area of the applicable dwelling unit or fire area. Option B is therefore correct.
The percentage is based on floor area rather than total ceiling surface area. For example, where the associated fire area contains 1,000 square feet of floor area, the maximum ceiling exposure permitted under this particular exception would be 200 square feet, subject to the additional separation and mixed-exposure provisions.
The 40-percent value in option D applies to mass timber walls, including attached columns , rather than ceilings. The 15-percent and 30-percent values are not the prescribed Type IV-B ceiling exposure limitations in the 2021 IBC.
The inspector must additionally determine whether another exposed wall or ceiling region exists nearby.
Section 602.4.2.2.4 imposes a 15-foot separation requirement, and Section 602.4.2.2.3 controls situations where both wall and ceiling surfaces are intentionally exposed.
References/Topics: 2021 IBC Sections 602.4.2.2.2 through 602.4.2.2.4; Type IV-B ceiling exposure limitations.
질문 # 31
Which of the following provisions for mass timber used for interior exit and elevator hoistway enclosures is true?
정답:C
설명:
Option A correctly reflects the required noncombustible protection for protected Type IV-A mass timber.
Under IBC Section 602.4.1.2.1, the noncombustible protection applied to interior faces of Type IV-A mass timber must contribute the protection time determined by the applicable provisions of Section 722.7, but not less than 80 minutes .
The broader Type IV provisions are particularly important for interior exit and elevator hoistway enclosures.
In qualifying tall mass timber buildings with an occupied floor more than 75 feet above the lowest level of fire department access, mass timber interior exit and elevator hoistway enclosures are permitted up to the specified height limits only where protected in accordance with Section 602.4.1.2. For a two-hour, 120- minute-rated enclosure, at least 80 minutes must therefore come from the prescribed noncombustible protection.
Type IV-B likewise uses an 80-minute minimum for protected interior mass timber, so option B ' s 40-minute value is incorrect. Type IV-C has different exposure allowances and shaft-protection provisions, but option C does not state the controlling tall-building enclosure requirement tested here. Type IV-HT is not governed by the Type IV-A tall mass timber enclosure protection rule.
References/Topics: 2021 IBC Sections 602.4 and 602.4.1.2 through 602.4.1.2.1; Section 722.7.
질문 # 32
What fire-resistance rating is required for floors in Type IV-A, IV-B and IV-C construction?
정답:A
설명:
IBC Table 601 requires floor construction and associated secondary structural members in Types IV-A, IV-B, and IV-C construction to have a two-hour fire-resistance rating. Therefore, option B is correct.
This requirement applies to the complete floor assembly, not only the timber panel. The required two-hour performance may be established through the calculated fire resistance of the mass timber, the contribution of approved noncombustible protection, or a permitted combination of both. Any topping, protective membrane, connection protection, and edge condition that forms part of the approved rated design must be installed accordingly.
The ratings for other building elements should not be transferred to the floor. A three-hour rating applies to the primary structural frame and bearing walls of Type IV-A, but its floor construction remains two hours.
Type IV-B and Type IV-C floors also require two hours, even though those construction types permit different degrees of exposed mass timber.
The special inspector must verify panel dimensions, approved layup, protection layers, joints, penetrations, connections, topping thickness, and other details that influence the floor's rated performance.
References/Topics: 2021 IBC Sections 601 and 602.4; Table 601, floor construction and associated secondary structural members.
질문 # 33
......
우리DumpTOP 에서 여러분은 아주 간단히International Code Council 93-Tall-Mass-Timber-Buildings시험을 패스할 수 있습니다. 만약 처음International Code Council 93-Tall-Mass-Timber-Buildings시험에 도전한다면 우리의International Code Council 93-Tall-Mass-Timber-Buildings시험자료를 선택하여 다운받고 고부를 한다면 생가보다는 아주 쉽게International Code Council 93-Tall-Mass-Timber-Buildings시험을 통과할 수 있으며 무엇보다도 시험시의 자신감 충만에 많은 도움이 됩니다. 다른 자료판매사이트도 많겠지만 저희는 저희 자료에 자신이 있습니다. 우리의 시험자료는 모두 하이퀼러티한 문제와 답으로 구성되었습니다, 그리고 우리는 업데트를 아주 중요시 생각하기에 어느 사이트보다 더 최신버전을 보실 수 잇을것입니다. 우리의International Code Council 93-Tall-Mass-Timber-Buildings자료로 자신만만한 시험 준비하시기를 바랍니다. 우리를 선택함으로 자신의 시간을 아끼는 셈이라고 생각하시면 됩니다.International Code Council 93-Tall-Mass-Timber-Buildings로 빠른시일내에 자격증 취득하시고International Code CouncilIT업계중에 엘리트한 전문가되시기를 바랍니다.