問題 #41
Waratah Hospital, based in Australia, is planning to move many data center services to new facility. (The remaining legacy data center will not be part of this project.) Waratah Hospital hired an external consultant to assist with the new data center network design.
Based on the requirements for the data center network infrastructure, the external consultant has created a high-level design. The below summarizes the content of the design document.
Requirements and information:
- Six racks in the data center room (single row).
- Redundant Top of Rack leaf switches with back-to-front cooling in each rack, providing 10/25 Gbps connectivity to servers, storage, and other devices.
- Four 100 GbE uplinks per leaf switch.
- The customer requested to install all switch ports facing the back of the rack racks (hot aisle.)
- OOB management for servers, storage, and network has to be provided through an external switch with back-to-front cooling. This switch has to be included in the solution. One OOB switch provides connectivity for two racks.
- Core equipment for the OOBM network is being reused.
- Middle-of-row spine switches.
-The data center should connect to the hospital building with links that provide 400 Gbps.
- Internet access is provided through an existing firewall cluster with two firewalls, each firewall in one data room. The second firewall is operating in standby mode, VRRP is utilized on the firewalls for failover. The data center network should connect to these firewalls with links that total
100 Gbps.
- The external link is a dark fiber direct link based on single-mode fiber (OS2). The distance to the main hospital 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
- 99.999% uptime for this life-critical environment.
- Planned and unplanned downtime has to be minimized.
- Software upgrades are only allowed once per year with close to zero downtime.
- All life-critical resources are accessed locally, and all resources exist within the hospital campus.
- Waratah Hospital requires a highly secure environment for the data center. Encrypted wire speed connectivity between the data room and the hospital is a must-have because the link between the buildings crosses a public road.
- Waratah Hospital has a mix of virtualized (vSphere) servers. Nutanix storage, bare metal servers, backup servers and other devices.
In the past, the hospital has had a security breach that resulted in data loss, network downtime, and identity theft.
Given the scenario, which environmental requirements are provided in this scenario? (Choose two.)
答案:A,E
解題說明:
The scenario provides switch placement requirements and airflow direction, including back-to- front cooling and ports facing the hot aisle.
問題 #42
Which two factors should be part of a data center network's high availability (HA) design?
(Choose two.)
答案:C,E
解題說明:
Redundant power feeds and diverse uplink paths eliminate single points of failure between tiers, while VSX provides active-active redundancy at the access/aggregation layer without the drawbacks of traditional MLAG designs. A single ToR switch, single power zone, and disabling LACP all reduce resiliency.
問題 #43
Waratah Hospital, based in Australia, is planning to move many data center services to new facility. (The remaining legacy data center will not be part of this project.) Waratah Hospital hired an external consultant to assist with the new data center network design.
Based on the requirements for the data center network infrastructure, the external consultant has created a high-level design. The below summarizes the content of the design document.
Requirements and information:
- Six racks in the data center room (single row).
- Redundant Top of Rack leaf switches with back-to-front cooling in each rack, providing 10/25 Gbps connectivity to servers, storage, and other devices.
- Four 100 GbE uplinks per leaf switch.
- The customer requested to install all switch ports facing the back of the rack racks (hot aisle.)
- OOB management for servers, storage, and network has to be provided through an external switch with back-to-front cooling. This switch has to be included in the solution. One OOB switch provides connectivity for two racks.
- Core equipment for the OOBM network is being reused.
- Middle-of-row spine switches.
-The data center should connect to the hospital building with links that provide 400 Gbps.
- Internet access is provided through an existing firewall cluster with two firewalls, each firewall in one data room. The second firewall is operating in standby mode, VRRP is utilized on the firewalls for failover. The data center network should connect to these firewalls with links that total
100 Gbps.
- The external link is a dark fiber direct link based on single-mode fiber (OS2). The distance to the main hospital 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
- 99.999% uptime for this life-critical environment.
- Planned and unplanned downtime has to be minimized.
- Software upgrades are only allowed once per year with close to zero downtime.
- All life-critical resources are accessed locally, and all resources exist within the hospital campus.
- Waratah Hospital requires a highly secure environment for the data center. Encrypted wire speed connectivity between the data room and the hospital is a must-have because the link between the buildings crosses a public road.
- Waratah Hospital has a mix of virtualized (vSphere) servers. Nutanix storage, bare metal servers, backup servers and other devices.
In the past, the hospital has had a security breach that resulted in data loss, network downtime, and identity theft.
Given the scenario, what environmental information should be gathered to complement the design? (Choose two.)
答案:A,B
解題說明:
Heat dissipation and power requirements are environmental details that still need to be validated for the physical deployment.
問題 #44
You have designed a two-tier L2 data center network for a customer. When you are presenting the solution, the customer indicates that they have a mission-critical multicast application with sources and receivers in the data center. Which CX feature, beyond features provided by the PIM-SM standard, should you explain to emphasize the value of your solution?
答案:D
解題說明:
Aruba CX with VSX supports enhanced multicast resiliency beyond standard PIM-SM by allowing active-active multicast forwarding and fast recovery if a VSX/core switch fails.
問題 #45
Which two items are typically part of a "gap analysis" performed after the current state assessment? (Choose two.)
答案:C,D
解題說明:
A gap analysis compares current-state capabilities against future requirements and highlights existing limitations/risks that the new design needs to address. Travel, marketing, and label colors are unrelated to gap analysis.