| Section | Objectives |
|---|---|
| EDGE Software Application | - Interpreting performance results and compliance - Project modeling and inputs in EDGE software |
| EDGE Green Building Fundamentals | - Sustainable design principles - Overview of EDGE system and certification framework |
| Certification Process | - Verification and audit process - Project registration and documentation requirements |
| Resource Efficiency Metrics | - Energy efficiency concepts and savings calculation - Water efficiency strategies and benchmarks - Materials efficiency and embodied energy basics |
テストに関する最も有用で効率的なEDGE-Expertトレーニング資料を提供するために最善を尽くし、クライアントが効率的に学習できるように複数の機能と直感的な方法を提供します。 EDGE-Expertの有用なテストガイドを学習すれば、時間と労力はほとんどかかりません。合格率とヒット率はどちらも高いため、テストに合格するための障害はほとんどありません。 Webで紹介を読んだ後、EDGE-Expert学習実践ガイドをさらに理解できます。
質問 # 54
Which of the following measures require testing by the EDGE Auditor at the site audit?
正解:A
解説:
According to the CBCI EDGE certification procedures, certain measures require physical verification and performance testing during the site audit to confirm that installed systems match the design-stage commitments entered in the EDGE software. Low-flow faucets for bathrooms fall into this category because their compliance depends on measurable flow rates. During the audit, the EDGE Auditor may use flow- measuring devices to test fixture discharge rates and verify that they meet the specified liters per minute used in the improved case calculations. This ensures that projected water savings are genuinely achieved in practice.
In contrast, measures such as a green roof are typically verified visually and through documentation such as drawings and material specifications rather than performance testing. Condensate water recovery and wastewater treatment systems are usually confirmed through installed system inspection, capacity checks, and documentation review, but not necessarily through direct flow-rate testing at each fixture point like low-flow faucets. The curriculum emphasizes that fixtures with defined performance parameters, such as flow rates, are subject to on-site testing to maintain the integrity and credibility of EDGE water savings claims.
質問 # 55
A site audit must take place within how many months of the project's practical completion date?
正解:C
解説:
The timeline for conducting a site audit as part of the EDGE certification process is critical to ensure that the project's implementation aligns with the design-stage claims. The EDGE Certification Protocol specifies the timeframe for post-construction audits: "A site audit for EDGE certification must take place within 12 months of the project's practical completion date to verify that the green building measures have been implemented as claimed in the self-assessment. This ensures that the audit reflects the building's as-built condition while the project details are still current" (EDGE Certification Protocol, Section 3.4: Post-Construction Requirements).
Option A, 12 months, directly matches this requirement. Option B (18 months), Option C (24 months), and Option D (36 months) exceed the specified timeframe, which could lead to discrepancies due to changes in the building's condition or operation: "Conducting the site audit beyond 12 months may result in inaccuracies, as building systems or occupancy patterns may change, affecting the verification of measures" (EDGE Expert and Auditor Protocols, Section 4.4: Site Audit Procedures). The EDGE User Guide also supports this timeline: "To maintain the integrity of the certification process, the site audit should be scheduled within 12 months of practical completion, allowing the Auditor to assess the building in its initial operational state" (EDGE User Guide, Section 6.3: Post-Construction Certification). The 12-month limit ensures that the audit is timely and relevant, making Option A the correct answer. Additionally, the EDGE Certification Protocol notes: "Extensions beyond 12 months may be granted only in exceptional circumstances, subject toapproval by the Certification Provider, but this is not the standard requirement" (EDGE Certification Protocol, Section
3.4: Post-Construction Requirements). Since the question asks for the standard timeframe, 12 months (Option A) applies.
Reference:EDGE Certification Protocol, Section 3.4: Post-Construction Requirements; EDGE Expert and Auditor Protocols, Section 4.4: Site Audit Procedures; EDGE User Guide Version 2.1, Section 6.3: Post- Construction Certification.
質問 # 56
Which of the following statements is correct about distinct user roles for an EDGE project team?
正解:C
解説:
The CBCI EDGE curriculum explains that the EDGE software uses distinct user roles to control who can view, edit, and administer a project. A Project Editor is commonly a member of the design or sustainability team because this role is intended for day-to-day project development. Editors can enter and update project inputs, adjust improved case measures, and upload or manage supporting documentation required for certification. This aligns directly with option B.
Option A is incorrect because the Project Owner is not limited to viewing progress. The Owner role is the highest permission level within the project and typically includes the ability to edit project information as well as manage access. Option C is incorrect because a Project Viewer is a read-only role used for stakeholders who need visibility but should not change anything; viewers do not manage users or create, delete, or administer projects. Option D is also incorrect because the EDGE Auditor is an independent third-party verifier working under a certification body; the auditor does not serve as the project administrator inside the client's EDGE project workspace. The correct statement is therefore that a Project Editor is typically from the design team and can edit project details and documentation.
質問 # 57
Which of the following wall solar reflectivity indexes would be the most energy efficient in a hot climate?
正解:D
解説:
In hot climates, reducing heat gain through building envelopes is a key strategy for energy efficiency, as emphasized in EDGE's green building design principles. The EDGE User Guide discusses solar reflectivity (measured by the Solar Reflectance Index, SRI) for walls and roofs, stating: "Higher SRI values indicate greater reflectivity, which reduces heat absorption and lowers cooling energy demand in hot climates. For walls in hot climates, an SRI of 0.7 or higher is recommended to maximize energy savings" (EDGE User Guide, Section 3.5: Passive Design Strategies). The options provided are 0.2, 0.3, 0.4, and 0.7. Since 0.7 is the highest SRI value among the choices, it reflects the most solar radiation, thereby reducing the cooling load andimproving energy efficiency in a hot climate, as per EDGE's guidance. Options A, B, and C have lower SRI values and would result in greater heat absorption, increasing energy use for cooling.
Reference:EDGE User Guide Version 2.1, Section 3.5: Passive Design Strategies.
質問 # 58
Which of the following properties of glass are used in EDGE?
正解:A
解説:
In the CBCI EDGE curriculum, glazing performance is characterized using properties that directly influence solar heat gains through windows, because this is a major driver of cooling energy demand in many climates.
The EDGE software uses Solar Heat Gain Coefficient, which represents the fraction of incident solar radiation that enters the building as heat through the glazing system. A lower SHGC reduces solar heat entering the indoor space, lowering cooling loads and improving the project's energy savings in the improved case.
Shading Coefficient is an older metric that is sometimes referenced in market literature, but EDGE standardizes the glazing solar performance input using SHGC for consistency across regions and products.
Solar Heat Loss Coefficient is not a standard glazing metric used in EDGE; heat loss through glazing is addressed using thermal transmittance measures such as U-value rather than an SHLC parameter. Solar Reflectivity may be relevant for certain roof or surface materials, but it is not the primary glazing property used in EDGE to quantify solar heat admitted indoors. Therefore, the correct glass property used in EDGE among the options provided is SHGC.
質問 # 59
......
私たち全員が知っているように、試験の準備プロセスは非常に面倒で時間がかかります。 EDGE-Expert試験の準備のために他のことをするために時間を割く必要があり、多くの重要なことが遅れました。この問題に直面した場合は、EDGE-Expertの実際の試験を選択してください。教材を使用すると、試験に参加できるのは準備に約20〜30時間かかる場合のみです。残りの時間は、やりたいことを何でもできます。これにより、レビューのプレッシャーを完全に軽減できます。
EDGE-Expert試験問題解説集: https://www.jptestking.com/EDGE-Expert-exam.html
BONUS!!! JPTestKing EDGE-Expertダンプの一部を無料でダウンロード:https://drive.google.com/open?id=1722xeS2odl2YGHrHQkG2ce1gp_UI2Bgm