弊社のAutodeskのBIM_MGT_101勉強資料を利用したら、きっと試験を受けるための時間とお金を節約できます。CertShikenのAutodeskのBIM_MGT_101問題集を買う前に、一部の問題と解答を無料にダウンロードすることができます。PDFのバージョンとソフトウェアのバージョンがありますから、ソフトウェアのバージョンを必要としたら、弊社のカスタマーサービススタッフから取得してください。
| Section | Weight | Objectives |
|---|---|---|
| Data Management | 20% | - Manage project data
|
| Project Needs Assessment | 28% | - Establish project workflows
|
| Collaboration Process | 36% | - Coordinate multidisciplinary models
|
| Corporate Standards and Documentation | 16% | - Create project and content templates
|
我々CertShikenが数年以来商品の開発をしている目的はIT業界でよく発展したい人にAutodeskのBIM_MGT_101試験に合格させることです。AutodeskのBIM_MGT_101試験のための資料がたくさんありますが、CertShikenの提供するのは一番信頼できます。我々の提供するソフトを利用する人のほとんどは順調にAutodeskのBIM_MGT_101試験に合格しました。その中の一部は暇な時間だけでAutodeskのBIM_MGT_101試験を準備します。
質問 # 14
The project manager would like to verify Autodesk Forma folder permissions assigned to team members but is not familiar with cloud-sharing platforms to access this information.
How can the BIM manager generate the required information?
正解:C
解説:
The BIM manager should generate an access or permissions report directly from the Autodesk cloud platform. The platform is the authoritative source for project members, folder access levels, assigned roles, and permission configurations. Exporting the report preserves the relationship between the reported information and the actual project configuration while providing the project manager with a format that can be reviewed without navigating the cloud administration interface.
A manually created Word document or spreadsheet would only be a secondary transcription of the permissions. Such records can become inaccurate when users are added, removed, or reassigned, and they provide weaker traceability than a system-generated report. A Revit Show History report records model synchronization activity and user interactions with a workshared model; it does not report cloud-folder permissions.
The exported report should be reviewed for unnecessary access, inconsistent folder inheritance, external-user permissions, and whether each team member has only the level of access required by their role. The BIM manager should also retain the report as part of the project's information-governance and audit records.
Reference topics: Common Data Environment permissions; cloud-user administration; access reporting; information security; role-based access; project audits.
質問 # 15
The BIM manager is launching a civic center project with strict sustainability and lifecycle data goals. During early planning, each discipline proposes different modelling approaches, and there is concern that downstream data handoff may be inconsistent.
To establish BIM goals and uses that ensure alignment from design through operations, what should the BIM manager do first?
Note: In the context of this exam, the term Level of Development (LOD) is used interchangeably with level of information need.
正解:D
解説:
The BIM manager must first establish the project's actual information requirements before prescribing models, templates, LOD criteria, or delivery procedures. A structured stakeholder session should identify the owner's sustainability objectives, operational data needs, required BIM uses, asset-management interfaces, exchange milestones, and responsibility boundaries. This provides the basis for determining what information must be authored, by whom, at what stage, and for which downstream purpose.
Consolidating standard BEPs from different firms would reproduce organization-specific practices rather than create a coherent project strategy. Similarly, adopting an LOD matrix from previous projects risks imposing assumptions that do not match the civic center's lifecycle and sustainability requirements. Developing templates before requirements are confirmed can embed incorrect parameters, classifications, units, or workflows into the project environment.
The stakeholder session should result in documented BIM objectives, approved use cases, information requirements, mobilization actions, and preliminary modelling responsibilities. Those decisions can then inform the project BEP, Model Element Table, LOD or information-need matrix, delivery plans, training requirements, and Common Data Environment configuration.
Reference topics: Project needs assessment; stakeholder engagement; BIM-use definition; lifecycle information requirements; sustainability goals; BIM mobilization; level of information need.
質問 # 16
A client's project schedule requires a rigorous milestone/gateway review process, defined in the BIM Execution Plan. The design firm has its own internal checklist.
What should a BIM manager do to ensure the team is complying with the client's requirements?
正解:C
解説:
The BIM manager should perform a gap analysis between the client's BEP-defined gateway requirements and the firm's standard quality-control checklist. The internal checklist may address common model-health and documentation criteria, but it cannot be assumed to cover every project-specific submission, approval, information, or coordination requirement.
Any client requirement not represented in the standard checklist should be incorporated into the project review process. Creating trackable issues or review actions in the Common Data Environment provides assigned responsibility, due dates, supporting evidence, status visibility, and an auditable closure record before each gateway.
Granting the client model access does not demonstrate that the design team has completed the required review. Placing a PDF on the Revit opening view may improve awareness but does not establish compliance, accountability, or verification. Model phases also represent temporal construction conditions and should not be manipulated merely to correspond with project-management milestones such as Design Development.
The milestone process should culminate in documented evidence that each requirement was reviewed, passed, conditionally accepted, or formally resolved before the project advances to the next stage.
Reference topics: BEP compliance; milestone and gateway reviews; quality-control checklists; gap analysis; issue tracking; project-specific standards.
質問 # 17
What setting should be defined in the Family Template for Mechanical Equipment families intended for use in projects in specific countries?
正解:B
解説:
A country-specific Mechanical Equipment family template should use the measurement system and unit formatting expected in the target market. This includes the appropriate conventions for dimensions, flow, pressure, power, temperature, electrical values, and other discipline-specific quantities. Establishing units in the template ensures that family authors enter, interpret, test, and document parameter values consistently from the beginning of content development.
Object Styles govern the graphical representation of family categories and subcategories; they do not translate the family into a country's official language. Parameter classification as Type or Instance must be determined according to the intended behavior of each value. For example, manufacturer and nominal-capacity information may be type-based, while asset identifiers or installation-specific values may be instance-based. Setting every parameter to Instance would therefore produce poorly structured content.
Project Location concerns geographical and environmental project settings and is not the principal country-standard setting for a reusable equipment family. A family template is intended to be loaded into many projects, so its numerical conventions must align with the regional standards under which the content will be authored and used.
Reference topics: Revit family-template standards; regional content development; project and family units; mechanical equipment parameters; corporate content libraries.
質問 # 18
A BIM manager is preparing to onboard a group of subcontractors into Autodesk Forma for a large healthcare project. These subcontractors need access to a limited set of model files related only to interior partitions, but should not be able to view or modify structural, MEP, or scheduling content.
What two actions should the BIM manager take to manage data security in this scenario? (Select two.)
正解:D、E
解説:
The BIM manager should first create a controlled package containing only the models, documents, and supporting information required for the interior-partition scope. A package establishes a defined information exchange and prevents subcontractors from relying on unrelated or uncontrolled project content.
Role-based permissions and folder-level access must then be configured according to the principle of least privilege. The subcontractors should receive only the minimum viewing, downloading, uploading, or editing rights necessary to perform their contractual tasks. Structural, MEP, scheduling, commercial, and other restricted folders should remain inaccessible rather than merely hidden within a broader model set.
Watermarking does not prevent unauthorized viewing or access. Granting full project access and relying on verbal instructions provides no enforceable technical control and creates an unacceptable information-security risk. Hiding coordination issues is unrelated to controlling access to model files and may obstruct legitimate issue resolution within the subcontractors' assigned scope.
The BIM manager should test the permissions using an equivalent user role, confirm that inherited folder permissions do not expose restricted information, and document the approved access configuration as part of the onboarding record.
Reference topics: Common Data Environment security; role-based access; folder permissions; information packages; least-privilege access; subcontractor onboarding.