| Section | Objectives |
|---|---|
| Topic 1: Materials and Resources | - Resource management
|
| Topic 2: Innovation | - Innovative sustainability practices
|
| Topic 3: Water Efficiency | - Water conservation strategies
|
| Topic 4: Indoor Environmental Quality | - Occupant health and comfort
|
| Topic 5: Sustainable Sites | - Site development
|
| Topic 6: Energy and Atmosphere | - Energy performance
|
| Topic 7: Regional Priority | - Regional environmental priorities
|
| Topic 8: Location and Transportation | - Site selection and connectivity
|
| Topic 9: Integrative Process | - Discovery and planning
|
我々JPTestKingはUSGBCのLEED-AP-BD-C試験問題集をリリースする以降、多くのお客様の好評を博したのは弊社にとって、大変な名誉なことです。また、我々はさらに認可を受けられるために、皆様の一切の要求を満足できて喜ぶ気持ちでずっと協力し、完備かつ精確のLEED-AP-BD-C試験問題集を開発するのに準備します。
質問 # 375
Which of the following is a source reduction strategy to eliminate waste produced by a project?
正解:B
解説:
Prefabrication is a source reduction strategy that can help eliminate waste produced by a project. It involves the production of components in a factory before being transported to the construction site for assembly. This method reduces waste as it allows for precise measurements and controlled conditions, minimizing the amount of excess material produced.
質問 # 376
An HVAC system consists of an air handler supplying conditioned air (mixture of return air and outdoor air) to an office, corridor, conference room and lobby. For Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance, the ventilation rate procedure calculations must be based upon what HVAC system configuration?
正解:A
解説:
A multiple-zone system is a system that has one or more air handlers supplying conditioned air to more than one zone. A zone is a space or group of spaces within a building with heating and cooling requirements that are sufficiently similar so that desired conditions (e.g., temperature) can be maintained throughout using a single controlling device. The ventilation rate procedure calculations must be based on the multiple-zone system configuration because the HVAC system in the question serves different zones with different ventilation requirements. Reference: LEED v4 Reference Guide for Building Design and Construction, p. 6881; ASHRAE Standard 62.1-2010, Section 6.2.52
質問 # 377
In a large industrial or commercial building, which energy end uses are classified as systems composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering?
正解:A
解説:
A condenser water system with a cooling tower and condenser water pumps is classified as a system composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering. This is because the condenser water system is a single energy end use that serves a specific function and can be isolated from other systems1. HVAC air system, electrical lighting system, and water flow system are not considered as single energy end uses, but rather as multiple energy end uses that serve different functions and cannot be easily isolated2.
Reference:
* LEED V5for Building Design and Construction, p. 415
* Advanced Energy Metering, p. 2
質問 # 378
A project has total waste of 20 tons (18.1 tonnes) that includes the following:
* 8 tons (7.3 tonnes) of recycled demolition steel and concrete
* 2 tons (1.8 tonnes) of trees cleared from the site
. 3 tons (2.7 tonnes) of commingled scrap with 40% diverted
. 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization
* 1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer What is the percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management?
正解:A
解説:
The percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management is calculated by dividing the total weight of diverted materials by the total weight of waste generated1. Diverted materials are those that are reused, recycled, salvaged, or donated2. In this case, the total weight of diverted materials is:
8 tons (7.3 tonnes) of recycled demolition steel and concrete
6 tons (5.4 tonnes) of used furniture donated to a non-profit organization
1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer
40% of 3 tons (2.7 tonnes) of commingled scrap, which is 1.2 tons (1.1 tonnes) The sum of these weights is 16.2 tons (14.7 tonnes). The total weight of waste generated is 20 tons (18.1 tonnes). Therefore, the percentage of diverted waste is:
(16.2 / 20) x 100 = 81%
However, the credit allows for a 10% adjustment for vegetative waste, which is not considered a building material3. Therefore, the percentage of diverted waste after adjustment is:
(81 - 10) = 71%
The closest answer option to this value is B. 75%.
Reference:
Construction and Demolition Waste Management
Construction Waste Management
Construction and Demolition Waste Management - Canada Green Building Council
質問 # 379
How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?
正解:C
解説:
The distance between the project site and the manufacturing location is determined by the straight line distance. This is because theLEED V5Reference Guide for Building Design and Construction states that the distance should be measured as the crow flies1. The straight line distance is the shortest distance between two points on a plane, regardless of the mode of transportation or the road conditions. The image that you sent shows the straight line distance between the project site and the manufacturing location as the line segment AB.
:
LEED V5Reference Guide for Building Design and Construction, Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, page 551
質問 # 380
......
弊社のJPTestKingはIT認定試験のソフトの一番信頼たるバンドになるという目標を達成するために、弊社はあなたに最新版のUSGBCのLEED-AP-BD-C試験問題集を提供いたします。弊社のソフトを使用して、ほとんどのお客様は難しいと思われているUSGBCのLEED-AP-BD-C試験に順調に剛角しました。これも弊社が自信的にあなたに商品を薦める原因です。もし弊社のソフトを使ってあなたは残念で試験に失敗したら、弊社は全額で返金することを保証いたします。すべてのことの目的はあなたに安心に試験に準備さされるということです。
LEED-AP-BD-C無料サンプル: https://www.jptestking.com/LEED-AP-BD-C-exam.html
P.S. JPTestKingがGoogle Driveで共有している無料かつ新しいLEED-AP-BD-Cダンプ:https://drive.google.com/open?id=1affJvRfrjxuNHNBZDMRosppX3N8RAK7S