試験を受けることでInternational Code Council認定を取得することを期待する人が増えています。ただし、多くの人にとって試験は非常に困難です。特に正しい学習教材を選択せず​​に適切な方法を見つけた場合、93-Tall-Mass-Timber-Buildings試験に合格して関連する認定を取得することはより困難になります。関連する認定を効率的な方法で取得したい場合は、当社の93-Tall-Mass-Timber-Buildings学習教材を選択してください。弊社の93-Tall-Mass-Timber-Buildings学習教材が試験に合格し、簡単に認定を取得するのに役立ちます。

International Code Council 93-Tall-Mass-Timber-Buildings Exam Syllabus Topics:

SectionObjectives
Topic 1: Tall Mass Timber Building Code Provisions- Special Inspection Requirements
  • 1. Special inspection of mass timber construction
    • 2. Inspection of connections and protective measures
      - Mass Timber Products and Definitions
      - Structural and Connection Requirements
      • 1. Mass timber structural systems
        • 2. Connections and connection protection
          - Applicable Codes and References
          • 1. Mass Timber Buildings and the IBC
            • 2. International Building Code
              • 3. International Fire Code
                - Fire Safety and Fire Resistance
                • 1. Fire-resistance ratings and noncombustible protection
                  • 2. Fire protection systems and construction fire safety
                    - Type IV Construction
                    • 1. Construction Types IV-A, IV-B and IV-C
                      • 2. Heights, Stories and Allowable Areas

                        >> 93-Tall-Mass-Timber-Buildings資格取得 <<

                        93-Tall-Mass-Timber-Buildingsテスト内容 & 93-Tall-Mass-Timber-Buildings勉強ガイド

                        現在、試験がシミュレーションテストを提供するような統合システムを持っていることはほとんどありません。 93-Tall-Mass-Timber-Buildings学習ツールについて学習した後、実際の試験を刺激することの重要性が徐々に認識されます。この機能により、93-Tall-Mass-Timber-Buildings練習システムがどのように動作するかを簡単に把握でき、93-Tall-Mass-Timber-Buildings試験に関する中核的な知識を得ることができます。さらに、実際の試験環境にいるときは、質問への回答の速度と品質を制御し、エクササイズの良い習慣を身に付けることができるため、93-Tall-Mass-Timber-Buildings試験に合格することができます。

                        International Code Council 93-Tall-Mass-Timber-Buildings 認定 93-Tall-Mass-Timber-Buildings 試験問題 (Q74-Q79):

                        質問 # 74
                        The maximum allowable height for a Group E building of Type IV-A construction with an automatic sprinkler system in accordance with Section 903.3.1.1 is _____ stories.

                        正解:B

                        解説:
                        The controlling provision is 2021 IBC Section 504.4 and Table 504.4, which establish the allowable number of stories above grade plane according to occupancy classification, construction type, and sprinkler protection.
                        The question identifies three controlling variables: Group E occupancy, Type IV-A construction, and an NFPA 13 automatic sprinkler system installed in accordance with Section 903.3.1.1.
                        In the Group E row, the sprinklered "S" value for Type IV-A construction is nine stories above grade plane.
                        Therefore, option D is correct. The three-story value applies to the nonsprinklered Type IV-A condition and must not be used because the question expressly states that the building is sprinklered. The six-story value corresponds to Type IV-B construction under the same sprinklered Group E condition, while the four-story value-although not listed as an answer-would apply to Type IV-C.
                        The special inspector should distinguish the story limitation in Table 504.4 from the separate building-height- in-feet limitation in Table 504.3. Both requirements apply concurrently; compliance with one does not permit the other to be exceeded.
                        References/Topics: 2021 IBC Section 504.4; Table 504.4, Group E, sprinklered Type IV-A construction; Section 903.3.1.1.


                        質問 # 75
                        When Type X gypsum board is used as noncombustible protection over mass timber on the building ' s exterior walls, which of the following fasteners are permitted?

                        正解:C

                        解説:
                        Option A reproduces one of the two permitted exterior gypsum-board fastening methods in 2021 IBC Section
                        722.7.2.2. Type X gypsum board used as noncombustible protection on the exterior side of mass timber walls may be attached using galvanized nails of minimum 12 gage with a 7/16-inch head and sufficient length to penetrate the mass timber at least 1 inch .
                        The code also permits ASTM C1002 Type S, W, or G screws, but those screws must likewise penetrate the mass timber a minimum of 1 inch . Options C and D are therefore incorrect because they specify only 3/4- inch and 7/8-inch penetration, respectively. Option B is incorrect because it substitutes 16-gage nails for the minimum 12-gage requirement.
                        Section 722.7.2.2 additionally requires exterior Type X gypsum-board layers to be fastened 12 inches on center each way and 6 inches on center at joints or ends. Panel-edge fasteners must be located at least 1 inch and not more than 2 inches from the edge.
                        These fastening details are part of the conditions necessary to claim the protection contribution in Table
                        722.7.1(2).
                        References/Topics: 2021 IBC Sections 722.7.1 and 722.7.2.2; exterior Type X gypsum-board protection.


                        質問 # 76
                        In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are permitted to be reduced by _____ where supporting a roof only.

                        正解:D

                        解説:
                        The permitted reduction is one hour. Table 601 assigns a two-hour base fire-resistance rating to exterior and interior bearing walls in Type IV-C construction. Footnote "a" to the table permits the ratings of the primary structural frame and bearing walls to be reduced by one hour where those elements support a roof only.
                        Accordingly, a Type IV-C bearing wall that supports only roof construction may be assigned a one-hour rating after application of the permitted reduction. The allowance recognizes that the element is not carrying occupied floor levels above and therefore presents a lower consequence of progressive structural failure than a wall supporting one or more floors.
                        The reduction is not automatic merely because a bearing wall is located at the upper story. The approved structural documents must establish that the wall supports only the roof and does not carry floor loads, transfer loads, elevated mechanical platforms, occupied rooftop structures, or other construction that invalidates the condition.
                        Options A and B are not reductions specified by Table 601. Option D would eliminate the entire two-hour rating and is not permitted. The inspector should verify the applicable rating and the precise load path before accepting reduced fire protection at the top story.
                        References/Topics: 2021 IBC Table 601, Footnote "a"; Type IV-C bearing walls and roof-support rating reduction.


                        質問 # 77
                        Refer to the figure by clicking on the EXHIBIT button above.


                        In Type IV-B construction, unprotected portions of mass timber as shown in the Figure are required to be separated by _____ feet.

                        正解:A

                        解説:
                        The required separation is 15 feet , making option B correct. Section 602.4.2.2.4 of the 2021 IBC specifically regulates the separation distance between unprotected mass timber elements in Type IV-B construction.
                        Within each dwelling unit or fire area, unprotected portions of mass timber walls and ceilings must be separated from other unprotected wall and ceiling portions by not less than 15 feet . For ceiling-related surfaces, the separation is measured horizontally along the ceiling. For wall-to-wall exposure, the applicable separation is measured horizontally along the floor.
                        This requirement operates in addition to the maximum exposed-area restrictions. A designer therefore cannot merely demonstrate that the exposed ceiling is below 20 percent or that exposed walls are below 40 percent of floor area; the exposed regions must also satisfy the required spatial separation.
                        The purpose is to prevent multiple exposed mass timber regions from acting as closely spaced fuel packages during a compartment fire. During inspection, dimensions should be checked against the approved documents before required gypsum or other noncombustible protection is completed.
                        References/Topics: 2021 IBC Section 602.4.2.2.4; separation distance between unprotected Type IV-B mass timber elements.


                        質問 # 78
                        Regarding water supply for the protection of buildings under construction, when combustible building materials of the building under construction are delivered to a site, the minimum fire flow provided shall be
                        _____ gpm.

                        正解:D

                        解説:
                        The minimum required fire flow is 500 gallons per minute. Therefore, option C is correct.
                        Under 2021 IFC Section 3313.2, an approved water supply must be available when combustible building materials for the building under construction are delivered to the project site. The hydrant supplying the required flow must be located within the prescribed distance of the combustible materials as measured along an approved fire apparatus access route. Where one hydrant cannot provide coverage to all combustible material locations, additional hydrants are required.
                        The 500-gpm requirement is the initial minimum associated with the delivery of combustible building materials. It should not be confused with the potentially greater fire-flow requirements applicable after vertical construction of a Type III, IV, or V building begins. Depending on fire separation distance and the building's calculated final fire-flow demand, a larger supply may be required under subsequent provisions.
                        Options A and B provide inadequate suppression capacity. Option D is not the baseline amount prescribed for the condition stated in the question. Inspectors and site safety personnel should verify that the water source is operational and accessible before substantial quantities of mass timber arrive on-site.
                        References/Topics: 2021 IFC Sections 3313.1 and 3313.2; construction-site water supply and combustible building materials.


                        質問 # 79
                        ......

                        CertJukenのウェブサイトをクリックしたら、CertJukenに登録した人々が非常にたくさんいることに驚いたでしょう。実はこれは普通なことです。CertJukenは毎日異なる受験生に様々なトレーニング資料を提供します。彼らは当社の資料を利用してから試験に受かりました。これは当社が提供したInternational Code Councilの93-Tall-Mass-Timber-Buildingsトレーニング資料が本当に効果的なものということを証明しました。もしあなたも試験に合格したいのなら、CertJukenをミスしないでください。CertJukenはきっとあなたのニーズを満たせますから。