International Code Council 93-Tall-Mass-Timber-Buildings Exam Syllabus Topics:

SectionObjectives
Topic 1: Structural Inspection- Structural loads and related code requirements
- Connections and fastening systems
- Mass timber structural elements
Topic 2: Tall Mass Timber Building Code Provisions- Mass timber materials and construction requirements
- Types IV-A, IV-B and IV-C construction
- International Building Code requirements for tall mass timber construction
Topic 3: Code Compliance and Related Requirements- Documentation and verification of compliance
- Energy code requirements applicable to mass timber buildings
- Sound transmission requirements
Topic 4: Special Inspection Requirements- Special inspection procedures for tall mass timber buildings
- Inspection of connections and protective materials
- Inspector duties and responsibilities
Topic 5: Fire Protection and Fire-Resistance- Fire protection systems and related provisions
- Noncombustible protection and protection of mass timber elements
- Fire-resistance requirements
Topic 6: Construction Fire Safety- Construction-phase fire safety requirements
- International Fire Code requirements
- Protection of mass timber during construction

>> 93-Tall-Mass-Timber-Buildings認定試験 <<

実用的な93-Tall-Mass-Timber-Buildings認定試験試験-試験の準備方法-一番優秀な93-Tall-Mass-Timber-Buildings試験問題

93-Tall-Mass-Timber-Buildings実践資料は、これらの93-Tall-Mass-Timber-Buildings実践資料を説明責任を持って作成した当社のものです。 また、93-Tall-Mass-Timber-Buildingsトレーニング資料は効率的な製品です。 さらに、93-Tall-Mass-Timber-Buildings試験準備は適切で立派な練習資料です。 進捗状況を確認し、93-Tall-Mass-Timber-Buildingsトレーニング資料の証明書を取得することは、当然のことながら、最新かつ最も正確な知識を備えた最も専門的な専門家によるものです。 93-Tall-Mass-Timber-Buildings試験準備は市場の大部分を占めています。

International Code Council 93-Tall-Mass-Timber-Buildings 認定 93-Tall-Mass-Timber-Buildings 試験問題 (Q25-Q30):

質問 # 25
The building owner shall be responsible for each of the following for fire safety during construction except:

正解:B

解説:
The IFC does not require daily inspection documentation to be stored in a fire- and water-resistant safe.
Therefore, option C is the exception.
The owner or the owner's authorized agent must establish and maintain the required construction-site fire- prevention program and designate a site safety director. The site safety director is responsible for completing a daily fire-safety inspection covering the building and exterior project areas. The results must be documented, retained on-site until the certificate of occupancy is issued, and made immediately available to the fire code official upon request. Options A, B, and D accurately reflect these administrative requirements.
The purpose is not merely record retention. Daily inspections are intended to identify conditions such as obstructed fire apparatus access, blocked hydrants or fire department connections, exposed temporary wiring, improper hazardous-material storage, uncontrolled combustible debris, unavailable extinguishers, impaired standpipes, and deficient hot-work controls.
A special inspector is not automatically the site safety director. However, observations involving installed passive protection or unsafe construction conditions should be communicated through the approved reporting process. The owner remains accountable for implementing the site safety plan and maintaining the required documentation.
References/Topics: 2021 IFC Sections 3303.1 through 3303.3; site safety director and daily fire-safety inspection records.


質問 # 26
Each of the following is true for special inspection of mass timber construction except:

正解:C

解説:
Option A is the false statement. Under 2021 IBC Table 1705.5.3, bolted connections require periodic special inspection, not continuous special inspection.
The remaining three statements correspond directly to items contained in the table. Concealed connections are subject to periodic inspection. Erection of mass timber construction is also periodically inspected. For threaded fasteners, the inspector must periodically verify the use of pre-drilled holes where the approved design or manufacturer's installation requirements call for them.
The distinction between periodic and continuous inspection is fundamental. Periodic inspection means the special inspector observes the work at appropriate intervals sufficient to verify compliance. Continuous inspection requires the inspector to be present continuously during the performance of the regulated work.
Table 1705.5.3 reserves continuous inspection for the particularly installation-sensitive condition involving adhesive anchors installed horizontally or upwardly inclined to resist sustained tension loads.
For bolted connections, periodic inspection remains technically substantive. The inspector should verify bolt size and type, hole preparation, connection geometry, washers and nuts, required tightening, member condition, edge and end distances, and conformity with the approved structural drawings.
References/Topics: 2021 IBC Section 1705.5.3; Table 1705.5.3, Required Special Inspections of Mass Timber Construction.


質問 # 27
A proprietary field-glued mass timber beam splice will require which of the following:

正解:D

解説:
A proprietary field-glued mass timber beam splice requires special inspection because the connection relies on a field-applied adhesive process that is not covered as a routine prescriptive mass timber connection in Table
1705.5.3. The controlling mechanism is IBC Section 1705.1.1, which authorizes the building official to require special inspection for unusual materials, systems, or installation procedures, particularly where compliance depends on additional manufacturer installation instructions.
The ICC code-development rationale for the tall mass timber provisions specifically identifies field-glued mass timber beam or panel splices as an example of work for which special inspection can be required.
Inspection must address the approved evaluation report and manufacturer's instructions, including substrate preparation, moisture and temperature limits, adhesive storage and expiration, mixing or proportioning, application quantity, open time, member alignment, clamping or pressure, and curing conditions.
Approval by the permit applicant has no regulatory significance. Verification by the registered design professional may supplement the inspection program but does not replace the approved special inspector. A building official may observe the work, but routine field verification by that official is not the prescribed quality-control procedure.
References/Topics: 2021 IBC Sections 1704.2, 1704.3 and 1705.1.1; special cases; proprietary field-glued mass timber splices.


質問 # 28
Refer to the exhibit by clicking on the EXHIBIT button above.


In the detail shown, which fasteners require fire protection according to AWC Technical Report 10?

正解:C

解説:
The 1/2-inch lag screws attaching the structural steel ledger require fire protection, making option D correct. These fasteners are structural components of the ledger-to-CLT connection and therefore form part of the connection whose fire performance must be maintained for the required duration.
AWC Technical Report 10 states that wood structural connections-including their connectors, fasteners, and participating members-must be protected from fire exposure for the required fire-resistance time
. Protection may be provided by wood cover, fire-rated gypsum board, other approved materials, or a combination.
TR10 distinguishes structural connection fasteners from small fasteners used merely to hold sacrificial protection in place. The report specifically explains that fasteners attaching protective wood strips need not themselves be protected, provided they are sufficiently long to keep the protection in position throughout the required exposure.
In the illustrated ledger connection, the 1/2-inch lag screws transfer structural load between the steel ledger and CLT wall. Their thermal protection is therefore integral to maintaining connection capacity.
References/Topics: AWC Technical Report No. 10 Sections 4.5 and connection examples; thermal protection of structural connectors and fasteners.


質問 # 29
Refer to the exhibit by clicking on the EXHIBIT button above.

In the detail shown, if the connections at the glulam beam and the steel plate required a fire-resistance rating of one (1) hour and the wood cover is designed per AWC Technical Report 10 to provide the entire one (1) hour of protection, the minimum required thickness for the wood block member providing protection for the bolt connections is _____ inches.

正解:D

解説:
The required minimum wood protection thickness is 1.75 inches , making option B correct. AWC Technical Report No. 10 establishes a thermal-separation methodology for protecting steel connectors and fasteners with sacrificial wood cover. Because the question specifies that the wood cover itself must provide the entire 60- minute fire-protection period, the protection thickness must be calculated using the thermal-separation provisions rather than relying on residual fire resistance from the connector or steel plate.
TR10 applies a reduction to the protection contribution of the base wood layer. Its connection examples use the relationship in Section 4.4.1.3, with the required thermal protection time divided by 0.85. For a 60-minute requirement, back-calculating the prescribed nonlinear wood charring equation gives approximately 1.71 inches of required wood thickness. The practical minimum corresponding to the available choices is therefore
1.75 inches.
The principle is critical for special inspection: steel connection components have high thermal conductivity and must remain below the temperature limits assumed by the connection fire design. The inspector must verify actual wood-cover thickness, fastening, continuity, and any gaps before concealment.
References/Topics: AWC Technical Report No. 10, Sections 4.4.1.3 and 4.5; connection thermal separation; wood protection of steel connectors. TR10 demonstrates the same calculation methodology for wood-covered steel connections.


質問 # 30
......

International Code Council認定を取得したい場合は、93-Tall-Mass-Timber-Buildings学習教材で時間と労力を大幅に節約できます。他にもやることがたくさんあることを知っており、当社の製品は何らかの形であなたの懸念を和らげます。まず、93-Tall-Mass-Timber-Buildings試験の資料は、断片化された時間を組み合わせて効果を高め、次に、最短時間で試験に合格して希望の認定を取得できます。 93-Tall-Mass-Timber-Buildings学習教材を使用すると、競争力を向上させることができます。 93-Tall-Mass-Timber-Buildings学習ガイドの助けを借りて、あなたは他の人よりも最高の星になります