Compared with the paper version, we have the advantage of instant access to download, and you will receive your download link and password for CPIM-8.0 training materials within ten minutes, so that you can start learning as early as possible. In addition, we have free demo for you to have a try for CPIM-8.0 Exam barindumps, so that you can know what the complete version is like. Online and offline service are available, and if you have any questions for CPIM-8.0 exam materials, you can contact us, and we will give you reply as quickly as we can.
| Certification Vendor: | ASCM (APICS) |
|---|---|
| Exam Name: | APICS Certified in Planning and Inventory Management (CPIM 8.0) |
| Exam Number: | CPIM-8.0 |
| Exam Format: | Scored + pretest questions, Multiple-choice questions, Scenario-based questions |
| Passing Score: | 300 (scaled score, range 200–350) |
| Real Exam Qty: | 150 |
| Certificate Validity Period: | 5 years (requires maintenance points for renewal) |
| Related Certifications: | CLTD - Certified Logistics, Transportation and Distribution CSCP - Certified Supply Chain Professional |
| Exam Price: | $1,265 (ASCM member) / $1,755 (non-member) |
| Exam Duration: | 210 minutes |
| Available Languages: | Spanish, Japanese, German, French, Chinese (Simplified), English |
| Recommended Training: | APICS CPIM Learning System |
| Exam Registration: | ASCM Official Registration |
| Sample Questions: | APICS CPIM-8.0 Sample Questions |
| Exam Way: | Computer-based testing; available at authorized test centers or via online remote proctoring |
| Pre Condition: | No formal prerequisites; no degree, work experience or references required |
| Official Syllabus URL: | https://www.ascm.org/certification/cpim/ |
>> Exam Dumps CPIM-8.0 Collection <<
If you are worried that it is not easy to obtain the certification of CPIM-8.0. Our CPIM-8.0 study questions can meet your needs. Once you use our CPIM-8.0 exam materials, you don't have to worry about consuming too much time, because high efficiency is our great advantage. You only need to spend 20 to 30 hours on practicing and consolidating of our CPIM-8.0 learning material, you will have a good result. After years of development practice, our CPIM-8.0 test torrent is absolutely the best. You will embrace a better future if you choose our CPIM-8.0 exam materials.
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
NEW QUESTION # 76
What document MOST likely states an organization's values?
Answer: C
NEW QUESTION # 77
The primary reason for tracing a component with scheduling problems to Its master production schedule (MPS) item is to:
Answer: B
Explanation:
The primary reason for tracing a component with scheduling problems to its master production schedule (MPS) item is to determine if a customer order will be impacted. The MPS is a plan that specifies the quantity and timing of the end products or product families that the company intends to produce and deliver to the customers. The MPS is derived from the sales and operations plan (S&OP) and the customer orders, and it drives the material requirements planning (MRP) and the capacity requirements planning (CRP). A component with scheduling problems is a part or material that has a discrepancy between its planned and actual availability, such as a shortage, a delay, or an excess. Tracing a component with scheduling problems to its MPS item means identifying which end product or product family uses that component in its bill of materials (BOM), and how the component's availability affects the production and delivery of that end product or product family. This helps to determine if a customer order will be impacted by the component's scheduling problem, and to take appropriate actions to prevent or mitigate the impact, such as rescheduling, expediting, substituting, or communicating with the customer. The other options are not correct, as they are not the primary reason for tracing a component with scheduling problems to its MPS item, but rather possible actions or outcomes of the tracing process:
* Revising the rough-cut capacity plan is a possible action that may result from tracing a component with scheduling problems to its MPS item, if the component's availability affects the capacity of the critical resources that are needed to produce the MPS item. Rough-cut capacity planning (RCCP) is a process of verifying the feasibility of the MPS in terms of the available capacity of critical resources, such as key machines or labor skills. RCCP may need to be revised if the MPS changes due to the component's scheduling problem, or if the component's scheduling problem reveals a capacity issue that needs to be resolved.
* Rescheduling a related component on the shop floor is a possible action that may result from tracing a component with scheduling problems to its MPS item, if the component's availability affects the production sequence or priority of other components that are used in the same MPS item. Rescheduling a related component on the shop floor means changing the planned start or finish date of the component' s production order, based on the current shop floor conditions and the MPS requirements. Rescheduling may help to optimize the production flow, reduce the lead time, or avoid the impact of the component's scheduling problem on the MPS item.
* Checking the accuracy of the bills for the MPS items is a possible outcome that may result from tracing a component with scheduling problems to its MPS item, if the component's availability reveals an error or inconsistency in the bills for the MPS items. Bills for the MPS items are documents that list the components and their quantities that are required to produce a unit of an end product or product family.
Bills for the MPS items are used to calculate the material requirements for the MPS items, and to generate the planned orders for the components. Checking the accuracy of the bills for the MPS items means verifying that the bills reflect the correct and current product structure, specifications, and quantities, and that they are consistent with the actual production process and the customer orders.
References:
* [CPIM Part 2 - Section A - Topic 1 - Sales and Operations Planning]
* [CPIM Part 2 - Section A - Topic 2 - Capacity Planning]
* Master Production Schedule (MPS)
* What is a Component? | Definition, Types, & Examples
* Tracing a Component to Its MPS Item
* Rough Cut Capacity Planning (RCCP)
* [Rescheduling]
* [Bill of Materials (BOM)]
NEW QUESTION # 78
Which of the following tools shows process changes and random variation over time?
Answer: A
Explanation:
A control chart is a tool that shows process changes and random variation over time. It is a type of statistical process control (SPC) that monitors the performance of a process and detects whether it is in or out of control.
A control chart consists of a center line, an upper control limit, and a lower control limit. The center line represents the average or target value of the process. The control limits represent the acceptable range of variation within the process. If the data points fall within the control limits, the process is considered stable and in control. If the data points fall outside the control limits, or show a non-random pattern, the process is considered unstable and out of control, indicating the presence of special causes of variation that need to be investigated and eliminated. References:
* Managing Supply Chain Operations, Chapter 9: Quality Management, Section 9.2: Statistical Process Control
* CPIM Exam Content Manual, Module 8: Quality, Technology and Continuous Improvement, Section
8.1: Quality Management, Subsection 8.1.2: Statistical Process Control
NEW QUESTION # 79
A company assembles kits of hand tools after receipt of the order from distributors and uses two-level master scheduling. The appropriate levels of detail for the forecasts that are input to master scheduling would be total number of kits and:
Answer: B
Explanation:
A company that uses two-level master scheduling has a master production schedule (MPS) for the end items (kits) and a final assembly schedule (FAS) for the components (tools). The forecasts that are input to master scheduling should reflect the total number of kits and the specific kit configurations, as these determine the demand for the components. The other options are not relevant for master scheduling, as they do not reflect the end item demand or the bill of materials structure. References: EXAM CONTENT MANUAL PREVIEW, page 10, section 4.1.2. Manufacturing Planning and Control for Supply Chain Management: The CPIM Reference, Second Edition, page 163, section 6.2.
NEW QUESTION # 80
Which of the following terms below BEST describes the measure of confidence that the security features, practices, procedures, and architecture of an information system accurately mediates and enforces security policy?
Answer: D