| Section | Weight | Objectives |
|---|---|---|
| Heating, Cooling & Water Heaters | 18% | - Water heaters and storage tanks - HVAC equipment installation and clearance - Heat pumps and cooling equipment - Solar thermal systems - Boilers and hydronic systems |
| Duct Systems | 12% | - Duct installation and supports - Duct construction and materials - Dampers and access doors - Insulation and sealing |
| Exhaust & Ventilation Systems | 20% | - Commercial kitchen exhaust systems - Makeup air systems - Hazardous and special exhaust systems - Ventilation rates and outdoor air requirements |
| Chimneys & Vents | 14% | - Chimney construction and materials - Clearances and termination requirements - Factory-built chimneys and vents - Vent systems and connections |
| Fuel Supply Systems | 10% | - Gas appliances and connections - Pressure regulation and overpressure protection - Piping testing and inspection - Fuel gas piping materials and installation |
| Combustion Air | 8% | - Combustion air requirements - Air supply and venting - Confined spaces and equipment rooms |
| General Administration | 18% | - Code authority and enforcement - Manufacturer's instructions and listings - Permits and inspections - Plan review and documentation |
>> International Code Council M2テスト内容 <<
International Code Councilは、短時間でM2認定を取得するために最善を尽くす必要があります。 認定資格を取得することが決まっている場合、M2質問トレントは喜んであなたに手を差し伸べます。 弊社のM2学習教材は、認定を取得するための最適な学習ツールになるためです。 ここで、M2試験問題を詳細に紹介します。紹介を注意深くお読みください。多くのメリットを得ることができます。 M2試験の資料に興味がある場合は、今すぐ購入できます。
質問 # 50
Given: An industrial water heater boiler has a manufacturer's listing of 18 inches wall clearance. It is installed with a protective wall assembly of 24-gauge sheet metal spaced out 1 inch from the wall.
The reduced installation clearance from the wall for this appliance is _____ inches.
正解:C
解説:
ICC clearance-reduction tables allow a listed clearance of 18 inches to be reduced to 9 inches where 24- gauge sheet metal is installed with a 1-inch ventilated airspace from the combustible wall. Therefore the correct answer is the option corresponding to 9 inches , which is B in your set.
質問 # 51
Where the cooking surface has exposed flame and burners, the minimum distance between the lowest edge of a grease filter and the cooking or heating surface shall be _____ inches.
正解:B
解説:
For cooking equipment with exposed flame and burners , the IMC table for grease-filter mounting position requires a minimum vertical separation of 24 inches between the lowest edge of the grease filter and the cooking surface. That makes B correct.
質問 # 52
When a permit is issued, the code requires that one set of approved plans and specifications be returned to the applicant.
This set of plans and specifications shall be:
正解:C
解説:
Under the ICC administrative provisions used with the mechanical code, one approved set is retained by the code official, and one approved set is returned to the applicant. The returned set must be kept on the site of the building or job while the authorized work is in progress. That directly matches Option A . It does not require return to the architect, filing with the county clerk, or retention for one year after completion.
質問 # 53
Given: a six-story, sprinklered, multifamily building with a continuously ventilated shaft extending vertically from the first floor to the roof and used for exhaust.
Which of the following requirements must also be met?
正解:B
解説:
For this type of continuously ventilated exhaust shaft serving a multifamily building, the code requires the kitchen exhaust connection to penetrate the shaft and extend vertically not less than 22 inches without a fire damper. That matches Option D .
質問 # 54
Indoor combustion air shall be provided within:
正解:B
解説:
For indoor combustion air openings, one opening must commence within 12 inches of the top of the enclosure and one within 12 inches of the bottom . That corresponds to 1 foot of the ceiling and 1 foot of the floor , so Option A is correct.
質問 # 55
......
あなたはM2問題集を利用したら、いろいろ勉強できます。そうすれば、大会社に入って、高い給料を獲得できます。M2問題集の合格率が高いので、M2試験に落ちることを心配する必要がないです。数えられない程の受験者はM2試験をパスしました。あなたはM2問題集に興味を持たれば、International Code Council会社のウエブサイトを訪問してください。