| Section | Objectives |
|---|---|
| Code Compliance and Related Requirements | - Documentation and verification of compliance - Sound transmission requirements - Energy code requirements applicable to mass timber buildings |
| Tall Mass Timber Building Code Provisions | - Types IV-A, IV-B and IV-C construction - Mass timber materials and construction requirements - International Building Code requirements for tall mass timber construction |
| Structural Inspection | - Structural loads and related code requirements - Mass timber structural elements - Connections and fastening systems |
| Fire Protection and Fire-Resistance | - Fire protection systems and related provisions - Fire-resistance requirements - Noncombustible protection and protection of mass timber elements |
| Construction Fire Safety | - Protection of mass timber during construction - Construction-phase fire safety requirements - International Fire Code requirements |
| Special Inspection Requirements | - Inspection of connections and protective materials - Special inspection procedures for tall mass timber buildings - Inspector duties and responsibilities |
>> International Code Council 93-Tall-Mass-Timber-Buildingsテスト内容 <<
93-Tall-Mass-Timber-Buildings認定資格を取得できれば、その地域で仕事をうまくこなせるので、簡単かつ迅速に昇進できます。最新の93-Tall-Mass-Timber-Buildingsクイズトレントは、International Code Councilあなたのキャリアの成功に直接導くことができます。当社の資料は、実際の運用試験の雰囲気をシミュレートし、試験をシミュレートできます。ダウンロードとインストールでは、コンピューターと93-Tall-Mass-Timber-Buildingsテスト準備を使用するユーザーの量に制限はありません。 93-Tall-Mass-Timber-Buildings試験トレントを習得するのに最適な学習方法を選択できるため、最高のサービスを提供します。私たちを信じて、93-Tall-Mass-Timber-Buildings試験問題を購入してください。
質問 # 63
Adhesives used to resist passage of air in construction Type IV-C, shall be in accordance with which of the following standards?
正解:D
解説:
Adhesives installed to resist air passage at qualifying mass timber interfaces must comply with ASTM D3498.
Therefore, option C is correct. IBC Section 703.7 applies this requirement to Types IV-A, IV-B, and IV-C at prescribed abutting edges and intersections of building elements that require fire-resistance ratings.
ASTM D3498 addresses adhesives used for field-gluing wood-based structural components. Compliance is significant because the adhesive must retain adequate bond performance under the environmental and service conditions associated with the approved application. The special inspector should verify product identification, compatibility with the timber substrate, manufacturer instructions, storage conditions, shelf life, surface preparation, application temperature, coverage, and curing.
UL 263 is a fire-resistance test standard for building assemblies and structural elements; it is not the product standard for the adhesive. ASTM A653 applies to metallic-coated steel sheet. ASTM F1575 concerns pressure-sensitive safety glazing films and is unrelated to sealing mass timber interfaces.
Where the adhesive is required by Section 703.7, its installation is subject to periodic special inspection under Section 1705.20 unless the applicable code exception removes the sealing requirement.
References/Topics: 2021 IBC Sections 703.7 and 1705.20; ASTM D3498; Type IV-C sealing requirements.
質問 # 64
The time, in minutes, contributed to the fire resistance rating by the noncombustible protection of mass timber building elements, components, or assemblies, shall be established through a comparison of assemblies tested using procedures set forth in ASTM Standard:
正解:D
解説:
The applicable standard is ASTM E119 , making option B correct. IBC Section 703.6 establishes a performance method for determining the number of minutes contributed by noncombustible protection applied to mass timber.
The methodology requires two otherwise identical assemblies to be evaluated using the procedures of ASTM E119 or UL 263 . Test Assembly 1 is tested without the protective covering. Test Assembly 2 incorporates the representative noncombustible protection, including its actual configuration, attachment details, joint treatment, accessories, and other relevant installation conditions. The protection contribution is then calculated by subtracting the fire-resistance time of the unprotected assembly from that of the protected assembly.
ASTM E119 is specifically designed to evaluate fire endurance of building construction and structural assemblies under standardized fire exposure. ASTM D3498, by contrast, is an adhesive specification referenced by the IBC for sealing certain mass timber interfaces. The other standards listed are not the prescribed comparative fire-resistance test for this determination.
References/Topics: 2021 IBC Sections 703.6 and 722.7.1; ASTM E119; UL 263; determination of noncombustible protection time contribution.
質問 # 65
In mass timber construction of Type IV-B, each of the following is suitable for use as fireblocking except:
正解:D
解説:
A 7/16-inch wood structural panel is not one of the prescriptively acceptable fireblocking materials listed by IBC Section 718.2.1. Therefore, option C is correct.
Section 718.2.1 permits fireblocking to consist of several specified materials. These include one-half-inch gypsum board; properly secured batts or blankets of mineral wool, mineral fiber, or other approved materials; and mass timber complying with Section 2304.11. Options A, B, and D are consequently valid.
For wood structural panels, however, the IBC requires a substantially greater thickness: a single thickness of approximately 0.719 inch , conventionally represented as 23/32 inch, with joints backed by material of the same required thickness. A 7/16-inch panel is only approximately 0.438 inch thick and therefore does not satisfy that prescriptive fireblocking provision.
Fireblocking is intended to interrupt concealed draft openings and restrict the movement of flame and hot gases through concealed combustible spaces. It should not be confused with a tested firestop system used at penetrations through fire-resistance-rated assemblies.
Special inspection should confirm that the installed material, thickness, joint backing, retention, and location conform to the approved construction documents and the applicable code provision.
References/Topics: 2021 IBC Sections 718.2 and 718.2.1; Section 2304.11; permitted fireblocking materials.
質問 # 66
Refer to the figure by clicking on the EXHIBIT button above.

The exterior wall section shown in the Figure provides the prescribed noncombustible protection required by which Construction Type?
正解:C
解説:
The illustrated configuration represents Type IV-C construction , so option C is correct. The distinguishing feature is the combination of noncombustible protection on the exterior face with an exposed CLT surface toward the interior.
IBC Section 602.4.3.1 requires the exterior side of combustible exterior walls in Type IV-C construction to have noncombustible protection providing a minimum assigned time of 40 minutes . Table 722.7.1(2) assigns exactly 40 minutes to one layer of 5/8-inch Type X gypsum board, matching the protection illustrated in Figure 66.
The decisive distinction is Section 602.4.3.2: mass timber elements in Type IV-C are permitted to be unprotected on the interior . This is fundamentally different from Type IV-A, where essentially all interior mass timber faces must be protected, and Type IV-B, where interior protection is generally required but limited areas may remain exposed under specific area and separation restrictions.
Type IV-HT does not use the Type IV-C protected-exterior/exposed-interior regulatory scheme.
References/Topics: 2021 IBC Sections 602.4.3, 602.4.3.1 and 602.4.3.2; Table 722.7.1(2), 5/8-inch Type X gypsum board = 40 minutes.
質問 # 67
Each of the following is true for special inspection of mass timber construction except:
正解:A
解説:
Option A is the false statement. Under 2021 IBC Table 1705.5.3, bolted connections require periodic special inspection, not continuous special inspection.
The remaining three statements correspond directly to items contained in the table. Concealed connections are subject to periodic inspection. Erection of mass timber construction is also periodically inspected. For threaded fasteners, the inspector must periodically verify the use of pre-drilled holes where the approved design or manufacturer's installation requirements call for them.
The distinction between periodic and continuous inspection is fundamental. Periodic inspection means the special inspector observes the work at appropriate intervals sufficient to verify compliance. Continuous inspection requires the inspector to be present continuously during the performance of the regulated work.
Table 1705.5.3 reserves continuous inspection for the particularly installation-sensitive condition involving adhesive anchors installed horizontally or upwardly inclined to resist sustained tension loads.
For bolted connections, periodic inspection remains technically substantive. The inspector should verify bolt size and type, hole preparation, connection geometry, washers and nuts, required tightening, member condition, edge and end distances, and conformity with the approved structural drawings.
References/Topics: 2021 IBC Section 1705.5.3; Table 1705.5.3, Required Special Inspections of Mass Timber Construction.