그 외, PassTIP EDGE-Expert 시험 문제집 일부가 지금은 무료입니다: https://drive.google.com/open?id=1eHCzBexW9rkmYcvl1j_0WME3EJwXJgnE
PassTIP에는EDGE EDGE-Expert인증시험의 특별한 합습가이드가 있습니다. 여러분은 많은 시간과 돈을 들이지 않으셔도 많은 IT관련지식을 배우실수 있습니다.그리고 빠른 시일 내에 여러분의 IT지식을 인증 받으실 있습니다. PassTIP인증자료들은 우리의 전문가들이 자기만의 지식과 몇 년간의 경험으로 준비중인 분들을 위하여 만들었습니다.
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: EDGE Software & Application | 10% | - Using EDGE calculation tool
|
| Topic 2: Certification Process & Roles | 10% | - Role of EDGE Expert
|
| Topic 3: Materials & Embodied Carbon | 15% | - Embodied energy baseline
|
| Topic 4: Energy Efficiency | 25% | - Energy-saving strategies
|
| Topic 5: EDGE Fundamentals & Framework | 20% | - Core principles of EDGE
|
| Topic 6: Water Efficiency | 20% | - Water baseline assessment
|
>> EDGE-Expert최신 업데이트 시험공부자료 <<
관심있는 인증시험과목EDGE EDGE-Expert덤프의 무료샘플을 원하신다면 덤프구매사이트의 PDF Version Demo 버튼을 클릭하고 메일주소를 입력하시면 바로 다운받아EDGE EDGE-Expert덤프의 일부분 문제를 체험해 보실수 있습니다. PDF버전외에 온라인버전과 테스트엔버전 Demo도 다운받아 보실수 있습니다.
질문 # 52
Which of the following is an EDGE measure to reduce the embodied energy in materials?
정답:A
설명:
Embodied energy in materials is one of the three core pillars of the EDGE standard, focusing on reducing the environmental impact of construction materials. The EDGE User Guide lists measures that specifically target embodied energy: "To reduce embodied energy in materials, EDGE includes measures such as the use of fly ash concrete, which substitutes a portion of cement with fly ash, a byproduct of coal combustion, thereby lowering the embodied energy and carbon footprint of concrete production" (EDGE User Guide, Section 7.2:
Materials Efficiency Measures). Option B, fly ash concrete, directly aligns with this measure, as it reduces the need for high-energy cement production. Option A (external shading) impacts energy by reducing cooling loads but does not directly address embodied energy: "External shading reduces operational energy use but does not contribute to embodied energy savings unless the shading materials themselves are low-impact, which is not specified in EDGE" (EDGE User Guide, Section 3.5: Passive Design Strategies). Option C (occupancy sensors) is an energy efficiency measure for lighting, not materials: "Occupancy sensors reduce lighting energy use but have no direct impact on embodied energy in materials" (EDGE User Guide, Section
4.4: Lighting Efficiency Measures). Option D (low-flow shower heads) targets water efficiency, not materials:
"Low-flow shower heads reduce water consumption, but their embodied energy impact is minimal and not a focus of EDGE materials measures" (EDGE User Guide, Section 5.2: Water Efficiency Measures). The EDGE MethodologyReport further elaborates: "Fly ash concrete can reduce embodied energy by up to 20% compared to traditional concrete, making it a key measure in EDGE for materials efficiency, especially in high-volume applications like hospitals or hotels" (EDGE Methodology Report Version 2.0, Section 6.1:
Embodied Energy in Materials). Other materials measures in EDGE, such as using recycled steel or bamboo, are not listed among the options, making fly ash concrete (Option B) the correct choice for reducing embodied energy.
Reference:EDGE User Guide Version 2.1, Section 7.2: Materials Efficiency Measures, Section 3.5: Passive Design Strategies, Section 4.4: Lighting Efficiency Measures, Section 5.2: Water Efficiency Measures; EDGE Methodology Report Version 2.0, Section 6.1: Embodied Energy in Materials.
질문 # 53
What are the benefits of using a pool cover that are recognized in EDGE?
정답:A
설명:
Pool covers are a water and energy efficiency measure in EDGE, particularly relevant for hotels with swimming pools. The EDGE User Guide outlines their benefits: "Pool covers reduce water demand by minimizing evaporation and energy demand by reducing the need for heating, as they retain heat in the pool.
In EDGE, the use of pool covers is recognized for its dual impact on reducing both water and energy consumption" (EDGE User Guide, Section 5.3: Additional Water Efficiency Measures). Option B, reduce both water and energy demand, directly aligns with this description. Option A (increase solar control and comfort) is incorrect, as pool covers are not recognized in EDGE for solar control or occupant comfort but for resource savings. Option C (require less maintenance and work from employees) and Option D (reduce chemical consumption and that of cleaning products) are potential secondary benefits but are not quantified or recognized in EDGE calculations, as confirmed by: "EDGE focuses on measurable water and energy savings from pool covers, not on maintenance or chemical use reductions" (EDGE Methodology Report Version 2.0, Section 4.3: Water Efficiency Calculations). Thus, Option B is the correct answer.
Reference: EDGE User Guide Version 2.1, Section 5.3: Additional Water Efficiency Measures; EDGE Methodology Report Version 2.0, Section 4.3: Water Efficiency Calculations.
질문 # 54
Which of the following does NOT contribute to an EDGE Auditor maintaining their Auditor status?
정답:D
설명:
Maintaining EDGE Auditor status involves specific requirements to ensure ongoing competence. The EDGE Expert and Auditor Protocols outline these requirements: "To maintain their status, EDGE Auditors must perform at least one project site audit every two years, attend refresher training as required by IFC, and stay updated by studying the EDGE user guides and protocols as they are revised" (EDGE Expert and Auditor Protocols, Section 5.1: Maintaining Auditor Status). Option A (performing at least one project site audit every two years) is explicitly required to demonstrate active engagement. Option B (studying the EDGE user guides as updated) is also necessary to stay current with program changes. Option D (attending refresher training) is mandated to ensure continued education. However, Option C (retaking the auditor exam) is not a requirement for maintaining status: "Once certified, EDGE Auditors are not required to retake the exam to maintain their status, though they may need to retake it if their certification lapses or if significant program changes occur" (EDGE Expert and Auditor Protocols, Section 5.2: Recertification Conditions). Since the question focuses on maintaining status, not recertification after lapse, retaking the exam is not a standard requirement. Thus, retaking the auditor exam (Option C) does not contribute to maintaining Auditor status.
Reference:EDGE Expert and Auditor Protocols, Section 5.1: Maintaining Auditor Status, Section 5.2:
Recertification Conditions.
질문 # 55
Which are the certification levels within the EDGE certification system?
정답:A
설명:
The CBCI EDGE curriculum explains that the EDGE system uses a tiered structure that starts with resource- efficiency certification and can progress to a net-carbon outcome. The foundational level is EDGE Certified, which is achieved when a project demonstrates at least 20 percent savings in energy, water, and embodied energy in materials compared with the baseline. Above this is EDGE Advanced, which retains the same minimum 20 percent requirements for water and materials while requiring a higher performance threshold for energy, meaning at least 40 percent energy savings.
Beyond these two efficiency tiers, the system includes EDGE Zero Carbon, which builds on EDGE Certified or EDGE Advanced by addressing the project's carbon footprint through a combination of high energy efficiency, on-site or off-site renewable energy to reduce operational emissions, and carbon offsets for remaining operational emissions to reach net zero operational carbon.
The options that mention Silver, Gold, and Platinum reflect other rating systems, not EDGE. EDGE also does not use "EDGE Zero Energy" as the certification level name in the core tier list presented in the curriculum.
Therefore, the correct set of certification levels is EDGE Certified, EDGE Advanced, and EDGE Zero Carbon.
질문 # 56
Which type of evidence is required at the post-construction stage for the efficiency measure window glazing?
정답:B
설명:
The post-construction stage in EDGE certification requires evidence to confirm that the efficiency measures claimed in the design stage have been implemented as specified. For window glazing, which affects energy efficiency through its U-value (thermal transmittance) and SHGC (Solar Heat Gain Coefficient), the EDGE Certification Protocol provides clear requirements: "At the post-construction stage, the Client must provide manufacturer's data sheets for the window glazing measure, showing the make and model, U-value, and SHGC of the installed glass, to confirm that the glazing matches the specifications claimed in the self- assessment and meets the energy efficiency requirements" (EDGE Certification Protocol, Section 3.4: Post- Construction Requirements). Option C, manufacturer's data sheets showing the make and model, U-value, and SHGC of the installed glass, directly matches this requirement, as it provides the specific technical data needed to verify compliance. Option A (design building elevations marking the window glass specifications) is relevant at the design stage, not post-construction: "Design elevations are required at the preliminary stage to show intended glazing specifications, not after construction" (EDGE Certification Protocol, Section 3.2:
Audit Requirements). Option B (bill of quantities with specifications highlighted) is insufficient on its own, as it may not provide detailed technical data: "Bills of quantities may support purchase verification, but manufacturer's data sheets are required for technical specifications like U-value and SHGC" (EDGE Certification Protocol, Section 3.4: Post-Construction Requirements). Option D (window schedule showing major glass types) is helpful but not sufficient, as it lacks the detailed technical data: "Window schedules may indicate glass types, but they do not replace the need for manufacturer's data sheets with U-value and SHGC at post-construction" (EDGE User Guide, Section 6.2: Documentation Requirements). The EDGE User Guide further clarifies: "For glazing measures, post-construction evidence must confirm the installed product's performance through manufacturer's data sheets, ensuring alignment with the design-stage claims" (EDGE User Guide, Section 4.1: Insulation Measures). Thus, manufacturer's data sheets (Option C) are required at the post-construction stage.
Reference:EDGE Certification Protocol, Section 3.4: Post-Construction Requirements, Section 3.2: Audit Requirements; EDGE User Guide Version 2.1, Section 6.2: Documentation Requirements, Section 4.1:
Insulation Measures.
질문 # 57
......
여러분이 우리EDGE EDGE-Expert문제와 답을 체험하는 동시에 우리PassTIP를 선택여부에 대하여 답이 나올 것입니다. 우리는 백프로 여러분들한테 편리함과 통과 율은 보장 드립니다. 여러분이 안전하게EDGE EDGE-Expert시험을 패스할 수 있는 곳은 바로 PassTIP입니다.
EDGE-Expert시험패스 가능한 공부하기: https://www.passtip.net/EDGE-Expert-pass-exam.html
참고: PassTIP에서 Google Drive로 공유하는 무료, 최신 EDGE-Expert 시험 문제집이 있습니다: https://drive.google.com/open?id=1eHCzBexW9rkmYcvl1j_0WME3EJwXJgnE