PassTIP의 연구팀에서는International Code Council 93-Tall-Mass-Timber-Buildings인증덤프만 위하여 지금까지 노력해왔고 PassTIP 학습가이드International Code Council 93-Tall-Mass-Timber-Buildings덤프로 시험이 어렵지 않아졌습니다. PassTIP는 100%한번에International Code Council 93-Tall-Mass-Timber-Buildings이장시험을 패스할 것을 보장하며 우리가 제공하는 문제와 답을 시험에서 백프로 나올 것입니다.여러분이International Code Council 93-Tall-Mass-Timber-Buildings시험에 응시하여 우리의 도움을 받는다면 PassTIP에서는 꼭 완벽한 자료를 드릴 것을 약속합니다. 또한 일년무료 업데이트서비스를 제공합니다.즉 문제와 답이 갱신이 되었을 경우 우리는 여러분들한테 최신버전의 문제와 답을 다시 보내드립니다.
| Section | Objectives |
|---|---|
| Topic 1: Tall Mass Timber Building Code Provisions | - Types IV-A, IV-B and IV-C construction - International Building Code requirements for tall mass timber construction - Mass timber materials and construction requirements |
| Topic 2: Construction Fire Safety | - Protection of mass timber during construction - Construction-phase fire safety requirements - International Fire Code requirements |
| Topic 3: Fire Protection and Fire-Resistance | - Fire protection systems and related provisions - Fire-resistance requirements - Noncombustible protection and protection of mass timber elements |
| Topic 4: Special Inspection Requirements | - Special inspection procedures for tall mass timber buildings - Inspection of connections and protective materials - Inspector duties and responsibilities |
| Topic 5: Structural Inspection | - Mass timber structural elements - Connections and fastening systems - Structural loads and related code requirements |
| Topic 6: Code Compliance and Related Requirements | - Sound transmission requirements - Energy code requirements applicable to mass timber buildings - Documentation and verification of compliance |
>> 93-Tall-Mass-Timber-Buildings최신 인증시험 <<
International Code Council 93-Tall-Mass-Timber-Buildings 덤프는 International Code Council 93-Tall-Mass-Timber-Buildings 시험의 모든 문제를 커버하고 있어 시험적중율이 아주 높습니다. PassTIP는 Paypal과 몇년간의 파트너 관계를 유지하여 왔으므로 신뢰가 가는 안전한 지불방법을 제공해드립니다. International Code Council 93-Tall-Mass-Timber-Buildings시험탈락시 제품비용 전액환불조치로 고객님의 이익을 보장해드립니다.
질문 # 75
The building owner shall be responsible for each of the following for fire safety during construction except:
정답:D
설명:
Option C is not an IFC requirement. The 2021 IFC requires inspection records to be maintained on-site, but it does not require those records to be secured in a fire- and water-resistant safe.
Section 3303.2 requires the owner to designate a site safety director. Section 3303.3 then makes that director responsible for completing a daily fire safety inspection of the project site. Every day, building and outdoor construction areas must be evaluated against the prescribed fire-safety inspection items.
The results of each inspection must be documented and retained on-site until a certificate of occupancy has been issued . The records must also be immediately available at the site for presentation to the fire code official upon request. Options A, B, and D therefore accurately reflect the code requirements.
The daily inspection program covers practical hazards such as hot work, temporary heating, combustible debris, temporary electrical wiring, hazardous-material storage, fire apparatus access, hydrants, fire department connections, standpipe availability, and portable extinguishers.
For tall mass timber projects, this documentation is particularly important because substantial combustible construction may be present before permanent fire protection systems are complete.
References/Topics: 2021 IFC Sections 3303.2 and 3303.3; site safety director; daily fire-safety inspection and documentation.
질문 # 76
A proprietary field-glued mass timber beam splice will require which of the following:
정답:B
설명:
A proprietary field-glued mass timber beam splice requires special inspection because the connection relies on a field-applied adhesive process that is not covered as a routine prescriptive mass timber connection in Table
1705.5.3. The controlling mechanism is IBC Section 1705.1.1, which authorizes the building official to require special inspection for unusual materials, systems, or installation procedures, particularly where compliance depends on additional manufacturer installation instructions.
The ICC code-development rationale for the tall mass timber provisions specifically identifies field-glued mass timber beam or panel splices as an example of work for which special inspection can be required.
Inspection must address the approved evaluation report and manufacturer's instructions, including substrate preparation, moisture and temperature limits, adhesive storage and expiration, mixing or proportioning, application quantity, open time, member alignment, clamping or pressure, and curing conditions.
Approval by the permit applicant has no regulatory significance. Verification by the registered design professional may supplement the inspection program but does not replace the approved special inspector. A building official may observe the work, but routine field verification by that official is not the prescribed quality-control procedure.
References/Topics: 2021 IBC Sections 1704.2, 1704.3 and 1705.1.1; special cases; proprietary field-glued mass timber splices.
질문 # 77
Proprietary nails can be used by referencing which ICC-ES Evaluation Report?
정답:D
설명:
ICC-ES ESR-1539 is the applicable evaluation report, making option C correct. ESR-1539 addresses nails and staples manufactured by participating companies and evaluates their use in engineered and nonengineered structural connections.
An ICC-ES Evaluation Report provides evidence that a proprietary product or system complies with specified building-code requirements where the product does not rely solely on the generic prescriptive provisions of the IBC. For proprietary nails, the report provides the technical basis needed to establish characteristics such as dimensions, materials, recognized structural applications, allowable design values, installation limitations, and conditions of use.
The current ICC-ES document is published as ESR-1539P, reflecting subsequent administrative updates to the report, but the identifying evaluation-report number remains 1539 , matching option C and the examination question.
For special inspection, merely recognizing the ESR number is not enough. The inspector should verify that the installed proprietary fastener is actually included in the report, that its diameter and length correspond to the approved construction documents, and that installation spacing, penetration, orientation, substrate, and other report conditions are satisfied.
References/Topics: ICC-ES ESR-1539, structural nails and staples; proprietary fastener evaluation and installation requirements. ICC-ES states that the nails and staples covered by ESR-1539 are used in engineered and prescriptive structural connections.
질문 # 78
In mass timber construction of Type IV-B, each of the following is suitable for use as fireblocking except:
정답:C
설명:
A 7/16-inch wood structural panel does not satisfy the prescribed minimum thickness for fireblocking.
Therefore, option C is the exception.
IBC Section 718.2.1 permits one thickness of 23/32-inch wood structural panel where the joints are properly backed. A 7/16-inch panel is substantially thinner and cannot be substituted without an approved alternative- material determination. The code also recognizes one-half-inch gypsum board and properly installed batts or blankets of mineral wool or other approved materials.
Mass timber complying with Section 2304.11 is also permitted as fireblocking. Its large cross section provides resistance to the movement of flame, hot gases, and smoke through a concealed space that is at least equivalent to the nominal lumber traditionally accepted for this purpose.
The inspector must distinguish fireblocking from a tested firestop system. Fireblocking divides or interrupts concealed combustible cavities; it does not automatically protect a penetration through a fire-resistance-rated wall or floor. Installation must completely fill or close the required space, remain securely supported, and comply with requirements for joints, edges, penetrations, and mineral-fiber compression.
References/Topics: 2021 IBC Section 718.2.1; Section 2304.11; approved fireblocking materials in mass timber construction.
질문 # 79
Given: Sealants or adhesives need not be provided where they are not a required component of a tested fire resistance rated assembly.
If a sealant is required, it must meet the requirement of ASTM:
정답:C
설명:
A sealant required to resist air passage between qualifying mass timber elements must comply with ASTM C920. Therefore, option C is correct. ASTM C920 is the recognized specification for elastomeric joint sealants and establishes requirements for properties such as movement capability, adhesion, cohesion, hardness, weathering, and durability.
IBC Section 703.7 differentiates between the two materials: sealants must meet ASTM C920, while adhesives must meet ASTM D3498. Option D therefore applies to an adhesive rather than a sealant. ASTM E119 is the standard fire test used to establish the fire-resistance rating of structural members and assemblies; it does not serve as the product specification for the sealant. ASTM E114 is not the applicable standard under this provision.
The stated exception is important. Section 703.7 does not require an additional sealant or adhesive where it is not a required component of the tested fire-resistance-rated assembly. Where the approved assembly or code provision does require it, however, the specified product, location, joint preparation, backing material, depth, width, and tooling must match the approved construction documents.
References/Topics: 2021 IBC Section 703.7; ASTM C920 sealants; ASTM D3498 adhesives; tested fire- resistance-rated assemblies.
질문 # 80
......
PassTIP는 International Code Council인증관련덤프를 제공하는 최고의 업체입니다, 덤프들은 PassTIP의 베터랑의 전문가들이 오랜 풍부한 경험과 93-Tall-Mass-Timber-Buildings지식으로 만들어낸 최고의 제품입니다. 그리고 우리는 온라인무료 서비스도 제공되어 제일 빠른 시간에 소통 상담이 가능합니다.
93-Tall-Mass-Timber-Buildings퍼펙트 덤프데모문제 보기: https://www.passtip.net/93-Tall-Mass-Timber-Buildings-pass-exam.html