With so many online resources, knowing where to start when preparing for an HCSP-Field-Data Center Facility V1.0 (H20-923_V1.0) exam can be tough. But with HCSP-Field-Data Center Facility V1.0 (H20-923_V1.0) practice test, you can be confident you're getting the best possible H20-923_V1.0 exam dumps. TestPDF exam simulator mirrors the H20-923_V1.0 Exam-taking experience, so you know what to expect on H20-923_V1.0 exam day. Plus, with our wide range of Huawei H20-923_V1.0 exam questions types and difficulty levels, you can tailor your H20-923_V1.0 exam practice to your needs.
| Certification Vendor: | Huawei |
|---|---|
| Exam Name: | HCSP-Field Data Center Facility V1.0 Certification Exam |
| Exam Number: | H20-923_V1.0 |
| Passing Score: | N/A |
| Available Languages: | English, Chinese |
| Exam Price: | N/A |
| Exam Format: | Multiple Response, Multiple Choice |
| Exam Duration: | N/A |
| Real Exam Qty: | N/A |
| Certificate Validity Period: | 3 years |
| Related Certifications: | HCIE-Field HCSA-Field HCSP-Field |
| Recommended Training: | HCSP-Field Training Courses Data Center Facility Fundamentals Learning Path |
| Exam Registration: | Huawei Talent Online |
| Sample Questions: | Huawei H20-923_V1.0 Sample Questions |
| Exam Way: | Typically delivered via Pearson VUE authorized testing centers or online proctored exam depending on region. |
| Pre Condition: | Basic understanding of IT infrastructure and data center operations is recommended; no strict formal prerequisite publicly specified. |
| Official Syllabus URL: | https://e.huawei.com/en/talent/ |
>> Latest H20-923_V1.0 Test Notes <<
In order to meet the demand of all customers and protect your machines network security, our company can promise that our H20-923_V1.0 test training guide have adopted technological and other necessary measures to ensure the security of personal information they collect, and prevent information leaks, damage or loss. In addition, the H20-923_V1.0 exam dumps system from our company can help all customers ward off network intrusion and attacks prevent information leakage, protect user machines network security. If you choose our H20-923_V1.0 study questions as your study tool, we can promise that we will try our best to enhance the safety guarantees and keep your information from revealing, and your privacy will be protected well. You can rest assured to buy the H20-923_V1.0 exam dumps from our company.
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
| Topic 10 |
|
| Topic 11 |
|
| Topic 12 |
|
| Topic 13 |
|
| Topic 14 |
|
| Topic 15 |
|
| Topic 16 |
|
| Topic 17 |
|
NEW QUESTION # 88
The NetEco northbound interface does not support the SNMP protocol. Only WebService interfaces are supported.
Answer: B
Explanation:
In Huawei's data center facility management architecture, thenorthbound interfaceof NetEco is designed specifically to integrate with upper-layer systems such as enterprise NMS platforms, SOC/monitoring centers, and customer unified O&M systems. To meet common industry integration practices, NetEco northbound capabilities are not limited to only one interface type. In addition to WebService-style interfaces used for richer data exchange and structured integration, NetEco also supportsSNMP-based northbound integration, which is widely used for alarm forwarding, basic status monitoring, and interoperability with standard network management tools. SNMP is particularly common in mixed-vendor environments because it enables a lightweight and standardized method to deliver key alarms and events to a customer's central monitoring platform without requiring deep application coupling. Therefore, the statement that "only WebService interfaces are supported and SNMP is not supported" is incorrect: NetEco northbound integration supports SNMP along with other northbound interface methods depending on the integration scenario and customer requirements.
NEW QUESTION # 89
If a component runtime overdue alarm is generated for an air conditioner, you can clear the device running time on the "Maint > Performance Maintenance" screen.
Answer: A
Explanation:
Huawei smart cooling/precision air-conditioning controllers manage preventive maintenance by trackingaccumulated runtimefor wear components such as indoor fans, compressors (where applicable), humidifiers, and pumps. When a component reaches its configured maintenance interval, the controller generates aruntime overdue alarmto remind O&M staff to inspect, service, or replace the component. After the required maintenance action is completed (for example, fan replacement, bearing inspection, cleaning, or pump servicing), the accumulated runtime record must becleared/resetso the next maintenance cycle can be measured correctly from zero. The controller provides this function under the maintenance feature set because it is part of lifecycle management and performance tracking rather than an alarm acknowledgement. The navigation pathMaint > Performance Maintenanceis used to access runtime statistics and to clear the corresponding device/component running time after maintenance. This avoids repeated overdue alarms for a component that has already been serviced and ensures future alarms accurately reflect the operating hours of the newly serviced or replaced parts, improving reliability and maintenance planning accuracy.
NEW QUESTION # 90
Which of the following interfaces is used to connect the controller and the main control module of the unit?
Answer: A
Explanation:
In Huawei precision cooling units, the LCD controller (human-machine interface) must exchange real-time operating data and commands with the unit's main control module while also receiving a stable low-voltage power supply. This connection is typically implemented as a low-voltage communication bus plus DC power, which is why the interface is identified as I2C/12V. The I2C portion provides the data channel used for status display, parameter viewing/setting (within permission scope), alarm presentation, and command delivery (such as mute, reset, or control enable actions). The 12 V portion supplies power to the controller so it can operate independently of high-voltage power circuits and remain safe to access during routine O&M. Interfaces like DP and USB are not used as the internal control link between the HMI and the main control board in this type of unit, and "SW" is not the designated controller-to-main-board interface in the standard wiring definition. Therefore, I2C/12V is the correct selection.
NEW QUESTION # 91
The NetEco can be deployed on any virtualization platform.
Answer: B
Explanation:
NetEco is an enterprise management application with specific runtime dependencies, including supported operating system versions, database/middleware compatibility, CPU/memory/storage requirements, and network/security prerequisites. Because of these dependencies, Huawei does not treat NetEco as "hypervisor-agnostic for any virtualization platform." In practice, NetEco deployment in virtualized environments is supported only when the virtualization stack meets Huawei's compatibility requirements, such as validated hypervisors/virtualization solutions, proper virtual hardware settings, and resource reservation rules to ensure stable performance (especially for alarm processing, historical data storage, and northbound integration tasks). If deployed on an unverified virtualization platform, issues may occur such as clock drift, I/O latency, database performance bottlenecks, unstable NIC behavior, or unsupported VM device models, which can impact data collection, event correlation, and overall system stability. Therefore, the correct interpretation is that NetEco can be deployed on supported/verified virtualization platforms, not on any virtualization platform.
NEW QUESTION # 92
On the ECC800-Pro WebUI, the PUE configuration mode can be "Standard" or "User-defined".
Answer: A
Explanation:
Huawei's ECC800-Pro supports PUE (Power Usage Effectiveness) management as part of its energy efficiency and green data center features. In practical O&M, different sites calculate PUE differently depending on metering topology, what loads are included (IT load only vs. auxiliary loads), and whether the site uses integrated modules (UPS, cooling, lighting, etc.) or external systems. To handle these real-world differences, the ECC800-Pro provides two PUE configuration approaches on the WebUI."Standard"mode is used when the site's metering points and calculation logic align with a predefined Huawei template, enabling rapid commissioning and consistent reporting."User-defined"mode is used when the customer's metering structure or management requirements differ-allowing engineers to select specific measurement points, define inclusion/exclusion rules, and tailor the calculation path so that displayed PUE matches the site's accepted KPI definition. This dual-mode design ensures PUE is both standardized where possible and flexible where necessary, improving energy analysis accuracy and supporting optimization actions.