| Certification Vendor: | Guidewire |
|---|---|
| Exam Name: | Associate Certification - InsuranceSuite Analyst - Mammoth Proctored Exam |
| Exam Number: | InsuranceSuite-Analyst |
| Exam Price: | USD 250 |
| Exam Format: | Scenario-Based, Simulation-Style, Multiple Choice |
| Available Languages: | English |
| Exam Duration: | 90 minutes |
| Passing Score: | 70% |
| Related Certifications: | Guidewire Certified Associate |
| Sample Questions: | Guidewire InsuranceSuite-Analyst Sample Questions |
| Exam Way: | Proctored |
| Pre Condition: | This certification is necessary for Guidewire Cloud projects. |
| Official Syllabus URL: | https://education.guidewire.com |
>> Guidewire InsuranceSuite-Analyst認證指南 <<
選擇參加Guidewire InsuranceSuite-Analyst 認證考試是一個明智的選擇,因為有了Guidewire InsuranceSuite-Analyst認證證書後,你的工資和職位都會有所提升,生活水準就會相應的提供。但是通過Guidewire InsuranceSuite-Analyst 認證考試不是很容易的,需要花很多時間和精力掌握好相關專業知識。Fast2test是一個制訂Guidewire InsuranceSuite-Analyst 認證考試培訓方案的專業IT培訓網站。你可以先在我們的網站上免費下載部分部分關於Guidewire InsuranceSuite-Analyst 認證考試的練習題和答案作為免費嘗試,以便你可以檢驗我們的可靠性。一般,試用Fast2test的產品後,你會對我們的產品很有信心的。
| 主題 | 簡介 |
|---|---|
| 主題 1 |
|
| 主題 2 |
|
| 主題 3 |
|
| 主題 4 |
|
| 主題 5 |
|
問題 #52
Business case completed, Business resources trained, User stories mapped to the business case, and Project tools identified are all deliverable's of the __________ phase.
答案:B
解題說明:
The correct answer is D. Inception because the activities listed in the question are foundational planning and alignment deliverables that are typically completed at the beginning of a Guidewire InsuranceSuite implementation. The Inception phase is the stage where the project team establishes a shared understanding of scope, business objectives, project readiness, and delivery approach before moving into deeper requirements elaboration and development work.
A completed business case is a core early-phase deliverable because the project must confirm the value, goals, and justification for the implementation. Business resources trained also fits Inception, since key business participants need enough preparation to contribute effectively in workshops, story discussions, and decision-making activities. User stories mapped to the business case is another strong indicator of Inception because this is where high-level business goals are connected to implementation scope and prioritized requirements. Project tools identified also belongs here, as the team needs to define and set up collaboration, tracking, and delivery tools before execution becomes fully active.
The other options are less appropriate. Development focuses on building, configuring, and testing the solution rather than establishing business alignment and project setup. Stabilization happens later and is generally concerned with final validation, defect resolution, readiness, and deployment support. Pre-Inception may include preliminary planning or sales-oriented preparation, but the specific deliverables listed in the question reflect formal project startup and structured implementation readiness, which align best to Inception .
So, when Guidewire project deliverables include business case completion, trained business participants, mapped user stories, and identified project tools, they are most accurately associated with the Inception phase
.
問題 #53
Which of the following are deliverable's during the Inception Phase of a project?
Choose 2 options.
答案:A,B
解題說明:
The correct answers are A. Conceptual Sprint Plan and C. Estimated User Stories because both are standard planning and readiness deliverables associated with the Inception phase of a Guidewire InsuranceSuite project. Inception is the phase where the team establishes delivery structure, confirms scope, prepares for iterative execution, and develops enough requirement detail to support planning and estimation.
A Conceptual Sprint Plan belongs in Inception because the project team needs an initial view of how work will be organized across iterations or sprints. At this point, the plan is usually high-level rather than fully detailed, but it is essential for aligning priorities, sequencing major work items, and preparing the project for execution.
Estimated User Stories are also a key Inception deliverable. During this phase, business needs are translated into user stories and then sized or estimated so the team can understand effort, support sprint planning, and validate that the project scope is achievable within constraints. Estimation helps connect business priorities to delivery capacity and is one of the major outcomes of early planning.
The other options are less appropriate as primary Inception deliverables in this context. Process Maps may sometimes be used as analysis aids during requirements work, but they are not typically emphasized as the core phase deliverables being asked about here. Detail Design Document (DDD) is more closely associated with deeper solution design and implementation detail, which generally occurs after Inception as requirements become more refined and the team moves further into execution.
For Guidewire project methodology, Inception focuses on building a delivery foundation. Therefore, when asked which items are deliverables of this phase, the best answers are Conceptual Sprint Plan and Estimated User Stories .
問題 #54
Which of the following describes what are User Story acceptance criteria?
Choose 2 options.
答案:C,D
解題說明:
The correct answers are A and D because acceptance criteria define the conditions that must be satisfied for a user story to be considered complete and acceptable. In Guidewire-style requirements work, user stories capture a business need at a high level, while acceptance criteria add the specific expectations that clarify how the team and stakeholders will know the story has been successfully delivered.
A). They are a checklist of key activities that must be completed in order to accept a story is correct because acceptance criteria function as a practical set of conditions or checkpoints. They guide development, testing, and business validation by making the expected results explicit. Although not always written as task steps, they serve as a measurable list of what must be true before the story is accepted.
D). They tell when a user story is 'done' is also correct because that is one of the main purposes of acceptance criteria. They define the boundaries of completion and help avoid ambiguity about whether the delivered functionality meets the intended requirement. This supports better collaboration among analysts, developers, testers, and business stakeholders.
B is incorrect because describing the value delivered to the end-user is part of the user story itself, not the acceptance criteria. C is also incorrect because describing the role, action, and reason follows the common user story format such as "As a [role], I want [action] , so that [benefit]." That structure defines the story statement, while acceptance criteria define the testable conditions for acceptance.
So, acceptance criteria are best understood as the conditions/checklist used to determine when a story is complete and acceptable .
問題 #55
A Business Analyst at PinnacleSure is preparing for an upcoming sprint. They are reviewing User Story Cards to ensure they accurately reflect the refined requirements.
User Story Cards are refined throughout a Guidewire project to capture changing business requirements and to specify what will be (or has been) __________________ for the project.
答案:C
解題說明:
The correct answer is C. configured in the application .
In a Guidewire InsuranceSuite project, User Story Cards are used as living requirement artifacts. They are refined over time as the team gains clarity about business needs, product fit, configuration choices, and implementation details. Their purpose is not just to capture business intent at a high level, but also to describe how that intent is translated into solution behavior within the InsuranceSuite application.
This is why the phrase that best completes the statement is "configured in the application." In the Guidewire analyst approach, story cards help track what the project team intends to deliver and what has already been addressed in the system configuration. Since Guidewire implementations emphasize configuration of base product capabilities wherever possible, story cards are closely tied to application behavior and business functionality.
The other options do not fit the role of User Story Cards as accurately. A is incorrect because external validation may occur during review or testing, but that is not the core thing story cards specify. B is less precise because the Guidewire approach focuses first on what is configured in the product, not simply what developers implement. D is incorrect because a testing strategy is a separate project artifact, not the main content of a story card. E and F are also unrelated to the primary purpose of story cards.
So, in Guidewire terminology and project practice, User Story Cards are refined to reflect changing requirements and to specify what will be, or has been, configured in the application for the project.
問題 #56
User story cards are filled out during elaboration and contain details about_________________________.
答案:C
解題說明:
Comprehensive and Detailed Explanation:
During Elaboration Workshops, the primary goal is to define the behavior of the system required to satisfy the business need. This is captured on the User Story Card primarily through Validation and Business Rules (Option C).
* Functional Logic:The core "detail" of a user story is theAcceptance Criteria. Acceptance Criteria are essentially a list of Business Rules (what the system must do) and Validations (what the system must check/prevent) to be considered "Done."
* Analyst Role:The Business Analyst's main responsibility is to document these rules to ensure the developer builds the correct logic.
Why other options are less correct:
* B. Design elements:While UI Mockups and Typelists are oftenattachedorreferenced, they represent the
"Solution Design." The User Story Card itself focuses on theRequirement(The Rules). In Guidewire SurePath methodology, specific "Design" documents (like detailed UI specs) are often secondary to the functional Acceptance Criteria (Rules) defined in the story.
* A & D:Guiding Principles are high-level project values, and Configuration Steps are developer tasks.
問題 #57
......
InsuranceSuite-Analyst題庫更新資訊: https://tw.fast2test.com/InsuranceSuite-Analyst-premium-file.html
P.S. Fast2test在Google Drive上分享了免費的、最新的InsuranceSuite-Analyst考試題庫:https://drive.google.com/open?id=1smvaiiNGrKNbePxWhxX4ZedAcKsncn8q