참고: Itcertkr에서 Google Drive로 공유하는 무료, 최신 L4M7 시험 문제집이 있습니다: https://drive.google.com/open?id=1JHt7QKTKAVfwmZQlWKqipU0MAJ8vkfC5
IT인증시험문제는 수시로 변경됩니다. 이 점을 해결하기 위해Itcertkr의CIPS인증 L4M7덤프도 시험변경에 따라 업데이트하도록 최선을 다하고 있습니다.시험문제 변경에 초점을 맞추어 업데이트를 진행한후 업데이트된CIPS인증 L4M7덤프를 1년간 무료로 업데이트서비스를 드립니다.
| Section | Objectives |
|---|---|
| Topic 1: Understand the role of technology in asset management | - Asset tracking and monitoring systems - Emerging technologies in asset management - Data management and analytics |
| Topic 2: Understand the financial aspects of whole-life asset management | - Financial justification and business case development - Total cost of ownership calculations - Budgeting and forecasting for assets |
| Topic 3: Understand the concept of whole-life asset management | - Identify key stakeholders in asset management - Define asset management and its role in procurement - Explain the whole-life cost approach |
| Topic 4: Understand inventory control and management | - Inventory classification and control methods - Demand forecasting and planning - Storage and warehousing principles |
| Topic 5: Understand the key elements of whole-life asset management | - Disposal and end-of-life considerations - Acquisition and procurement strategies - Operation and maintenance planning |
| Topic 6: Understand the legal and regulatory requirements | - Health and safety regulations - Contractual and warranty obligations - Environmental and sustainability considerations |
우리Itcertkr 사이트에CIPS L4M7관련자료의 일부 문제와 답 등 문제들을 제공함으로 여러분은 무료로 다운받아 체험해보실 수 있습니다. 여러분은 이것이야 말로 알맞춤이고, 전면적인 여러분이 지금까지 갖고 싶었던 문제집이라는 것을 느끼게 됩니다.
질문 # 81
Which of the following are the key elements of total productive maintenance?
1. Reactive maintenance
2. Quality maintenance
3. Deferred maintenance
4. Autonomous maintenance
정답:C
설명:
Total productive maintenance (TPM) is an innovative concept in the manufacturing industry that evolved from the idea of preventive maintenance to adopt practices of productive maintenance, maintenance prevention, and reliability Engineering. What we now refer to as TPM, has become an ingenious approach to achieve overall equipment effectiveness by involving the workforce behind the machines (i.e. the operators).
8 pillars of TPM
1) 5S - Sort, straighten, shine, standardize, and sustain
Just like a physical structure starts with a grounded framework, building a strong TPM process requires a strong foundation in the form of the principles of 5S. This is a workplace organization method that is simplified into 5 basic steps:
Sort tools, equipment, and materials to identify which of these can be discarded Straighten and set things in proper order to reduce unnecessary motion and efficiently travel be-tween working groups and locations Shine refers to performing necessary housekeeping to clean up the work area Standardize and schedule activities to systematically form the habits to keep the workplace orga-nized Sustain the process and principles for long-term applications The 5S approach provides a systematic approach to cleaning the workplace, thereby uncovering underlying problems and challenges.
2) Autonomous maintenance
Maintenance tasks and caring for equipment should start with the people using the equipment. The empowerment of operators to work on small maintenance tasks effectively allows the maintenance teams to focus on more specialized assignments.
3) Continuous improvement
Also known as the Japanese term Kaizen, Continuous Improvement promotes the attitude of pro-gressing towards zero losses and zero defects. Through small but continual tweaks to processes, the overall effectiveness and efficiency of the organization is developed.
4) Planned maintenance
Planned maintenance activities are essential to the prevention of equipment breakdown. Planned maintenance is performed by periodically evaluating the condition of equipment to proactively prevent deterioration and mechanical failures.
5) Quality maintenance
To ensure the satisfaction of the customer, manufacturing processes aim for zero-defect production. Standards for superior quality, and checks on whether the standards are being met, should be in place. The goal of quality maintenance is to identify any possible causes of deviations from zero-defect production.
6) Training
The idea of TPM is that everyone does their part to contribute to the overall productivity of the production process. In order to achieve optimum performance, and to build each member's competence, proper training is required to equip each one with the theoretical and practical know-how of working with machines and equipment.
7) Office TPM
A key role that is often overlooked is the administrative department that works behind the scenes. Like the rest of the production teams and processes, the management and administrative functions are also subject to productivity improvement. Tins includes identifying and eliminating losses, and contributing to the overall performance of the plant.
8) Safety, health, and environment
The last of the eight pillars focuses on creating a safe workplace. The essence of this pillar is real-ized when actively applied to each of the other pillars. The successful implementation of this pillar will contribute to a secure and hazard-free workplace.
질문 # 82
TCD Manufacturing has taken over the operations of a fabric processor in another country. TCD has planned to eliminate some traditional fabric processing that has high risks because of the chemicals used in the dying process. TCD is now preparing for new dying processes to be Installed and needs to remove the current tanks and its associated equipment. Which of the following is appropriate to TCD's situation?
정답:A
질문 # 83
Manufacturing resources planning (MRP II) was developed from material requirement planning (MRP).
Which of the following is the additional input that is available in MRP II but does not ap-pear in MRP?
정답:B
설명:
MRP I was some of the first business software to be widely adopted during the 1970s. Manufacturers sought these systems in order to improve efficiency and accuracy when it came to basic processes such as production scheduling and inventory management.
By the 1980s, manufacturers realized they needed software that could also tie into their accounting systems and forecast inventory requirements. Enter MRP II, which included these integrations in addition to all the capabilities offered by MRP I. Enterprise resource planning (ERP) software features-which we'll cover later on-are included in the following table for comparison.
Graphical user interface Description automatically generated
Reference:
- MRP vs. MRP II: What's the Difference?
- CIPS study guide page 118-119
LO 2, AC 2.3
질문 # 84
Toll Group has thousands of end-of-life IT assets that need to be disposed of. The senior manage-ment of Toll Group is largely concerned about sustainability in waste management, especially electronic waste. Before selecting a supplier to manage the process, the procurement team is required to assess the environmental risks regarding disposal of the assets. Risk assessment is basically based on the measurement of which factors?
1. Impact
2. Reward
3. Surveillance
4. Likelihood
정답:A
설명:
All risk management processes follow the same basic steps, although sometimes different jargon is used to describe these steps. Together these 5 risk management process steps combine to deliver a simple and effective risk management process.
Step 1: Identify the Risk. You and your team uncover, recognize and describe risks that might affect your project or its outcomes. There are a number of techniques you can use to find project risks. During this step you start to prepare your Project Risk Register.
Step 2: Analyze the risk. Once risks are identified you determine the likelihood and consequence of each risk. You develop an understanding of the nature of the risk and its potential to affect pro-ject goals and objectives. This information is also input to your Project Risk Register.
Step 3: Evaluate or Rank the Risk. You evaluate or rank the risk by determining the risk magni-tude, which is the combination of likelihood and consequence. You make decisions about whether the risk is acceptable or whether it is serious enough to warrant treatment. These risk rankings are also added to your Project Risk Register.
Step 4: Treat the Risk. This is also referred to as Risk Response Planning. During this step you assess your highest ranked risks and set out a plan to treat or modify these risks to achieve acceptable risk levels. How can you minimize the probability of the negative risks as well as enhancing the opportunities? You create risk mitigation strategies, preventive plans and contingency plans in this step. And you add the risk treatment measures for the highest ranking or most serious risks to your Project Risk Register.
Step 5: Monitor and Review the risk. This is the step where you take your Project Risk Register and use it to monitor, track and review risks.
Reference:
- What are the 5 Risk Management Steps in a Sound Risk Management Process?
- CIPS study guide page 192-193
LO 3, AC 3.3
질문 # 85
"Open stock plus purchases minus closing stock" is the formula of which of the following?
정답:A
설명:
The amount of closing stock (properly valued) is used to arrive at the cost of goods sold in a periodic inventory system with the following calculation:
Opening stock + Purchases - Closing stock = Cost of goods sold
질문 # 86
......
경쟁율이 치열한 IT업계에서 아무런 목표없이 아무런 희망없이 무미건조한 생활을 하고 계시나요? 다른 사람들이 모두 취득하고 있는 자격증에 관심도 없는 분은 치열한 경쟁속에서 살아남기 어렵습니다. CIPS인증 L4M7시험패스가 힘들다한들Itcertkr덤프만 있으면 어려운 시험도 쉬워질수 밖에 없습니다. CIPS인증 L4M7덤프에 있는 문제만 잘 이해하고 습득하신다면CIPS인증 L4M7시험을 패스하여 자격증을 취득해 자신의 경쟁율을 업그레이드하여 경쟁시대에서 안전감을 보유할수 있습니다.
L4M7시험대비 덤프공부자료: https://www.itcertkr.com/L4M7_exam.html
참고: Itcertkr에서 Google Drive로 공유하는 무료, 최신 L4M7 시험 문제집이 있습니다: https://drive.google.com/open?id=1JHt7QKTKAVfwmZQlWKqipU0MAJ8vkfC5