| Certification Vendor: | Huawei |
|---|---|
| Exam Name: | HCSP-Field-Data Center Facility V1.0 |
| Exam Number: | H20-923_V1.0 |
| Available Languages: | Chinese, English |
| Exam Format: | Multiple-answer, True/False, Single-answer, Drag-and-drop |
| Certificate Validity Period: | 3 Years |
| Exam Price: | USD 300 |
| Real Exam Qty: | 60 |
| Exam Duration: | 90 minutes |
| Passing Score: | 600/1000 |
| Related Certifications: | Huawei Certified Solution Specialist (HCSP) |
| Sample Questions: | Huawei H20-923_V1.0 Sample Questions |
| Exam Way: | Pearson VUE |
| Pre Condition: | None |
| Official Syllabus URL: | https://e.huawei.com/en/talent/exam/#/cert/6000000000000000020 |
弊社のH20-923_V1.0質問トレントは、手頃な価格であるだけでなく、市場で他の教育プラットフォームであるH20-923_V1.0試験と比較して、ユーザーのインスタントアップグレードを容易にするための更新だけでなく、完全に練習をサポートすることもできます質問は、高品質のパフォーマンスを持っていると言うことができます。 H20-923_V1.0学習教材をダウンロードして学習することを後悔することは決してありません。また、最初の試行でH20-923_V1.0試験に合格します。
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
| トピック 7 |
|
| トピック 8 |
|
| トピック 9 |
|
| トピック 10 |
|
質問 # 21
Which of the following statements are true about the industry trend of the data center cooling systems?
正解:A、B、D
解説:
As data center power density increases (especially driven by AI and high-performance computing), the industry trend is to adopt liquid cooling in high-density scenarios because liquid has much higher heat transfer capability than air, enabling stable cooling where rack power is very high. This makes statement A true. The combination of Cloud + AI pushes operators to reduce PUE and total energy cost through more intelligent control, higher efficiency cooling architectures, and integrated energy management, so statement B is also true. For large data centers, another clear trend is increasing chilled-water supply/return temperatures (higher inlet and outlet temperatures). Warmer water improves chiller efficiency, expands the number of hours that free cooling can be used, and reduces compressor work, so D is true. However, evaporative cooling is not universally the "main solution" for large data centers because it is climate- and water-condition dependent and is typically deployed as one option among multiple architectures rather than the dominant default everywhere. Therefore, C is the incorrect statement.
質問 # 22
In a data center power distribution architecture, what is the primary function of a Static Transfer Switch (STS) for critical single-cord loads?
正解:C
解説:
Huawei data center power distribution design prioritizes continuity for critical loads. For single- cord IT equipment that cannot accept dual inputs, an STS provides a practical high-availability approach by connecting the load to two independent AC sources (often A and B feeds) and transferring the load to the healthier source when abnormalities occur. The key value is speed and coordination: the STS detects voltage/frequency deviations or source failure and performs a rapid transfer to minimize or eliminate interruption seen by the load. This supports O&M strategies where upstream systems (UPS, PDUs, distribution boards) are maintained or isolated without forcing downtime on single-cord devices. In routine operations, STS status, transfer logs, alarms, and source quality parameters are monitored to prevent nuisance transfers and to ensure correct upstream selectivity and grounding. Correct commissioning also ensures the two sources meet synchronization conditions and that bypass/maintenance procedures are standardized, improving safety and reducing operational risk.
質問 # 23
During wizard startup, when you enter the screen for selecting commissioning items for the first time, all items are selected by default. Which item is mandatory. You can deselect other commissioning items that are not mandatory.
正解:D
解説:
In Huawei precision cooling commissioning, the wizard groups functional commissioning items so technicians can validate key subsystems efficiently. Thecooling system commissioningis mandatory because it verifies the primary control and protection loop that directly determines whether the unit can safely provide cooling capacity. This includes confirming the refrigeration or chilled-water cooling path can start and stop correctly, sensors and control logic are valid, and protection conditions (such as abnormal pressures
/temperatures, flow conditions, or interlocks) behave as expected. Without completing cooling-system commissioning, the unit's core purpose-stable temperature control for IT loads-cannot be assured, and the controller cannot reliably judge normal versus fault states during operation.
Other items (indoor fans, condensate pump, humidifier) are important butscenario-dependent: some sites do not use humidification, some drainage designs do not require an internal condensate pump, and fan checks can be handled as part of broader functional tests or may vary by redundancy configuration. Therefore, the wizard allows non-mandatory items to be deselected, but the cooling system commissioning must remain selected to complete a valid baseline commissioning workflow.
質問 # 24
After the battery module is installed, the torque and insulation should be checked according to the specified requirements.
正解:B
解説:
This statement is true because post-installation verification is a mandatory acceptance step for battery systems in data centers. After a battery module is installed,torque verificationensures that all power terminals, interconnect bars, and grounding points meet the specified tightening requirements. If torque is too low, contact resistance increases, which can cause abnormal heating, voltage drop, nuisance alarms, and even connector damage during high current charge/discharge. If torque is too high, threads, lugs, or busbars can be damaged, creating hidden reliability risks.Insulation testingconfirms that the battery circuit has no unintended leakage paths to chassis or ground and that cable routing, connector seating, and protective covers are correct.
This is especially important for lithium battery cabinets where high DC voltage and large fault current capability demand strict electrical isolation. Performing torque and insulation checks after installation reduces early-life faults, improves safety, and ensures the cabinet can pass commissioning tests and enter stable service under UPS charge/discharge control.
質問 # 25
The NetEco service program backend can be accessed through the iBMC port.
正解:B
解説:
In Huawei data center facility management,NetEcois the management software platform (server/application) used to centrally monitor and manage sites, whileiBMCis the out-of-band hardware management interface used forserver remote maintenance(such as power control, hardware health, BIOS settings, and remote console) on the specific server where iBMC exists. TheiBMC port is not a service access interface for NetEco. NetEco's backend services are accessed through theserver operating system network interfaces (management/service network) and corresponding application ports after the server is properly networked and configured. Even if NetEco is deployed on a Huawei server that has iBMC, iBMC only provides a channel to manage the server hardware and does not expose NetEco application access as an official commissioning
/O&M path. Therefore, NetEco backend access should be planned via the site's management network (IP addressing, routing, security policy), not via iBMC.