Oracle 1Z0-1075-26 Exam Syllabus Topics:

SectionObjectives
Topic 1: Manufacturing Configuration and Setup- Setup of manufacturing parameters
- Plant and resource configuration
Topic 2: Work Definition and Work Execution- Work definitions and structures
- Work order execution and control
Topic 3: Manufacturing Cloud Fundamentals- Core Manufacturing concepts in Oracle Cloud
- Manufacturing execution overview
Topic 4: Shop Floor Management- Production tracking and reporting
- Work execution monitoring
Topic 5: Quality and Costing in Manufacturing- Quality inspection integration
- Manufacturing costing principles
Topic 6: Manufacturing Planning Integration- Material and resource planning
- Integration with supply chain planning

>> 1Z0-1075-26 PDF <<

高品質-ハイパスレートの1Z0-1075-26 PDF試験-試験の準備方法1Z0-1075-26無料問題

いまOracleの1Z0-1075-26認定試験に関連する優れた資料を探すのに苦悩しているのですか。もうこれ以上悩む必要がないですよ。ここにはあなたが最も欲しいものがありますから。受験生の皆さんの要望に答えるように、CertShikenは1Z0-1075-26認定試験を受験する人々のために特に効率のあがる勉強法を開発しました。受験生の皆さんはほとんど仕事しながら試験の準備をしているのですから、大変でしょう。試験に準備するときにはあまり多くの時間を無駄にすることを避けるように、CertShikenは短時間の勉強をするだけで試験に合格することができる1Z0-1075-26問題集が用意されています。この問題集には実際の試験に出る可能性のあるすべての問題が含まれています。従って、この問題集を真面目に学ぶ限り、1Z0-1075-26認定試験に合格するのは難しいことではありません。

Oracle Manufacturing Cloud 2026 Implementation Professional 認定 1Z0-1075-26 試験問題 (Q45-Q50):

質問 # 45
A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.
How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?

正解:A

解説:
When configuring machines that will be used in production operations and will incur costs associated with work orders, the correct setup for these machines involves:
Setting up the machines as a "Resource" in the cost element set ABC: This allows the machines to be directly associated with the work orders for which they are used, ensuring that their costs are appropriately tracked and charged to the work order. Resources include equipment, labor, and other direct costs involved in production.
Incorrect options:
"Overhead" (B, D): Overhead costs typically represent indirect costs, not the direct usage of machines in production.
Cost Element Set Common (A): Since the plant uses a separate cost element set (ABC), the machines must be assigned to this specific set, not the Common cost element set.


質問 # 46
A manufacturing plant works in two shifts of eight hours each. A Manufacturing user wants four units of a work center resource, R1, to be available during nonworking time, outside the regular shift on a particular day.
Which is the correct sequence of steps to create a resource exception on the Manage Work Center Resource Calendar page?

正解:A

解説:
In Oracle Manufacturing Cloud, to make a resource (R1) available outside the regular shift for a specific day, you need to create a resource exception. This allows you to override the default shift schedule and make additional units of the resource available.
Click outside the existing shift time ensures that the exception applies to non-working hours.
Select Create Resource Exception from the Actions menu to initiate the exception.
Populate the Start and Duration fields to define the non-working period during which the resource will be available.
Enter 4 units in the Availability Override column to ensure that 4 units of resource R1 are made available for use during the exception period.


質問 # 47
A manufacturing plant has two shifts of eight hours each for the work center WCI: day shift and night shift. You associate four units each of the resources R1, R2, R3, and R4 to WCI. The customer wants to assign ail units of R2 available for day and night shift.
What is the correct sequence of steps to achieve this?

正解:C

解説:
In Oracle Manufacturing Cloud, to assign all units of resource R2 across both day and night shifts for the work center WC1, follow these steps:
Associate R2 with WC1 - This step ensures that the resource R2 is linked to the work center.
Select the Available 24 Hours check box - By selecting this option, you indicate that the resource is available for both shifts across the full 24-hour period.
Enter 4 in the Day Shift and Night Shift columns - Inputting 4 units in both shifts ensures that all units of R2 are available for use during the entire day and night shifts.


質問 # 48
The pick release of a project work order creates movement requests with the project and the task from the work order.
Which statement is NOT true about this?

正解:A

解説:
When pick release creates movement requests for project-based work orders, there are several key points regarding expenditure information:
Statement D: The expenditure type and the expenditure organization from the work order are not referenced onto the shop floor movement requests - This statement is correct because the expenditure type and organization are not typically included in the shop floor movement requests. These requests focus more on the material movement aspects, while expenditure details are managed elsewhere in the system.
Incorrect Statements:
Statement A: The expenditure type, date, and organization are derived when interfacing with Costing, which ensures that project-related costs are tracked accurately.
Statement B: The expenditure type for the item is derived based on the default expenditure type in Inventory Management, which is true for how items are picked for a work order.
Statement C: Expenditure type and organization from the work order are referenced in costing, but not directly on movement requests.


質問 # 49
Which is NOT a required setup task for Manufacturing master data?

正解:E

解説:
In Oracle Manufacturing Cloud, setting up the Manufacturing master data involves a series of required tasks to enable production operations. The following are the key setups:
Manage Production Resources: This setup task is essential for defining resources such as labor, equipment, and tools that are used in the manufacturing process. Resources are vital to the production planning and scheduling functions.
Manage Plant Parameters: This task is required to define how the plant will operate in terms of material handling, scheduling, costing, and other key operational metrics. These parameters control important aspects of how manufacturing will function at the plant level.
Manage Work Centers: Work centers represent the physical or logical locations where manufacturing operations occur. They must be set up for scheduling and executing production activities.
Manage Work Areas: Work areas are required to group related work centers and define operational zones within a plant. This is important for organizing production and ensuring efficient material flow.
Manage Plant Profiles: This task is not required for setting up manufacturing master data. Plant profiles are typically used for broader plant-level settings but are not directly tied to the manufacturing execution setup.