M2復習テキスト & M2日本語受験教科書

International Code CouncilのM2認定試験に受かるためにがんばって勉強していれば、Jpexamはあなたにヘルプを与えます。Jpexam が提供したInternational Code CouncilのM2問題集は実践の検査に合格したもので、最も良い品質であなたがInternational Code CouncilのM2認定試験に合格することを保証します。

International Code Council M2 Exam Syllabus Topics:

SectionWeightObjectives
Duct Systems12%- Duct construction and materials
- Dampers and access doors
- Insulation and sealing
- Duct installation and supports
Exhaust & Ventilation Systems20%- Hazardous and special exhaust systems
- Ventilation rates and outdoor air requirements
- Commercial kitchen exhaust systems
- Makeup air systems
Fuel Supply Systems10%- Pressure regulation and overpressure protection
- Gas appliances and connections
- Piping testing and inspection
- Fuel gas piping materials and installation
Chimneys & Vents14%- Vent systems and connections
- Chimney construction and materials
- Clearances and termination requirements
- Factory-built chimneys and vents
Heating, Cooling & Water Heaters18%- Boilers and hydronic systems
- Heat pumps and cooling equipment
- Solar thermal systems
- HVAC equipment installation and clearance
- Water heaters and storage tanks
Combustion Air8%- Combustion air requirements
- Air supply and venting
- Confined spaces and equipment rooms
General Administration18%- Permits and inspections
- Manufacturer's instructions and listings
- Code authority and enforcement
- Plan review and documentation

>> M2復習テキスト <<

International Code Council M2日本語受験教科書 & M2模擬対策問題

Jpexamは長年にわたってずっとIT認定試験に関連するM2参考書を提供しています。これは受験生の皆さんに検証されたウェブサイトで、一番優秀な試験M2問題集を提供することができます。Jpexamは全面的に受験生の利益を保証します。皆さんからいろいろな好評をもらいました。しかも、Jpexamは当面の市場で皆さんが一番信頼できるサイトです。

International Code Council Commercial Mechanical Inspector 認定 M2 試験問題 (Q28-Q33):

質問 # 28
Exhibit:

CEF-5 is a ceiling exhaust fan manufactured by:

正解:A

解説:
This is also an exhibit-reading question. From the equipment schedule in the image, CEF-5 is listed as a Nutone unit, so Option D is correct. This falls under reading commercial mechanical drawings and equipment schedules related to exhaust/ventilation components.


質問 # 29
The exhibit shows a _____ in. diameter gas line between unit heaters 5 and 8.

正解:A

解説:
Based on the mechanical plan shown in the exhibit, the gas line between unit heaters 5 and 8 is labeled as 1 inch in diameter. Therefore, the correct answer is B.


質問 # 30
The minimum size for access openings for fire dampers shall be:

正解:A

解説:
The IMC requires access openings for fire dampers to be of a size that allows maintenance and resetting of the damper . The code does not set the answer as same-as-duct, half-diagonal, or a universal 12-inch by 12- inch opening. So Option C is correct.


質問 # 31
An equipment shutoff valve shall be in the same room and not more than how many feet away from the appliance?

正解:B

解説:
The IFGC requires the appliance shutoff valve to be located in the same room as the appliance and within
6 feet of the appliance . Therefore, the correct answer is A .


質問 # 32
The exhaust outlet for a clothes dryer is required to be equipped with:

正解:A

解説:
The IMC requires clothes dryer exhaust ducts to terminate outside the building and to be equipped with a backdraft damper at the terminal. The code also prohibits screens at dryer terminations because lint can accumulate and obstruct flow. That makes Option A correct and eliminates Option C . The other two choices describe controls not required by the dryer exhaust termination rule.


質問 # 33
......

Jpexamが提供した対応性の訓練問題をテストにして初めてInternational Code CouncilのM2認定試験に参加する受験者の最もよいな選択でございます。真実試験問題が似てるのを確保することができて一回合格するのは目標にしています。もし試験に失敗したら、弊社が全額で返金いたします。

M2日本語受験教科書: https://www.jpexam.com/M2_exam.html