BONUS!!! 免費下載NewDumps LEED-AP-BD-C考試題庫的完整版:https://drive.google.com/open?id=1W-AhowSc8BLMMvzBZn9uZkTiWl__vcV9
NewDumps的IT專家團隊利用他們的經驗和知識不斷的提升考試培訓材料的品質來滿足考生的需求,保證考生順利地通過第一次參加的USGBC LEED-AP-BD-C認證考試。通過購買NewDumps的產品你總是能夠更快得到更新更準確的考試相關資訊。並且NewDumps的產品的覆蓋面很廣,可以為很多參加IT認證考試的考生提供方便,而且準確率100%。它能給你100%的信心,讓你安心的參加考試。
| Certification Vendor: | USGBC |
|---|---|
| Exam Name: | LEED AP Building Design + Construction (LEED AP BD+C) |
| Exam Number: | LEED-AP-BD-C |
| Certificate Validity Period: | 2 years |
| Passing Score: | 170/200 |
| Exam Duration: | 120 minutes |
| Available Languages: | English |
| Exam Price: | $350 USD |
| Real Exam Qty: | 100 |
| Related Certifications: | LEED AP with Specialty LEED Green Associate |
| Exam Format: | Multiple Choice |
| Sample Questions: | USGBC LEED-AP-BD-C Sample Questions |
| Exam Way: | Computer-based exam available at Prometric test centers or through remote online proctoring. |
| Pre Condition: | Must be 18 years of age or older. Candidates must hold a current LEED Green Associate credential or take the combined LEED Green Associate and LEED AP BD+C exams. Prior LEED project experience is strongly recommended. |
| Official Syllabus URL: | https://www.usgbc.org/credentials/leed-ap |
LEED-AP-BD-C 認證是互聯網界具有極大聲望的網路技能認證,在全球,通過IBM認證考試的工程師,平均年薪在10萬元以上。通過 HP 認證考試的工程師,平均年薪在30萬元以上。獲得 USGBC 的 LEED-AP-BD-C 認證的工程師,平均年薪也不低於20萬人民幣。據說,這還只是基本工資,不包括獎金,紅利和其他非工資性補貼。難怪美國副總統戈爾曾把 USGBC LEED-AP-BD-C 認證恰當而幽默地稱為“獲得高技術,高薪水的頭等艙船票”。
| 主題 | 簡介 |
|---|---|
| 主題 1 |
|
| 主題 2 |
|
| 主題 3 |
|
| 主題 4 |
|
| 主題 5 |
|
| 主題 6 |
|
| 主題 7 |
|
問題 #108
Which of the following strategies will aid in reducing indoor water use?
答案:C
解題說明:
According to the LEED v4: Building Design + Construction Guide, one of the strategies to reduce indoor water use is to optimize the consumption of showerheads by selecting fixtures that have a flow rate lower than the baseline of 2.0 gallons per minute (gpm) at 80 psi, or a local equivalent for projects outside the U.S. This can help the project achieve the Water Efficiency Prerequisite, Indoor Water Use Reduction, and the Water Efficiency Credit, Indoor Water Use Reduction, by reducing the aggregate water consumption from plumbing fixtures and fittings by at least 20% from the baseline1.
The other choices are not strategies to reduce indoor water use, because:
* Designing drip irrigation for landscape is a strategy to reduce outdoor water use, not indoor water use1.
* Using high-efficiency HVAC systems is a strategy to reduce energy use, not water use, although it may have some indirect water savings by reducing the cooling tower water use2.
* Excluding janitor closets in the building is not a feasible or practical strategy, as janitor closets are necessary for cleaning and maintenance purposes, and may also be required by codes or standards3.
References: LEED v4: Building Design + Construction Guide, Water Efficiency Prerequisite, Indoor Water Use Reduction, Requirements1; LEED v4: Building Design + Construction Guide, Water Efficiency Credit, Indoor Water Use Reduction, Requirements1; LEED v4: Building Design + Construction Guide, Energy and Atmosphere Credit, Optimize Energy Performance, Requirements2; LEED v4: Building Design + Construction Guide, Indoor Environmental Quality Credit, Green Cleaning - High-Performance Cleaning Program, Requirements3
問題 #109
A project team is designing a new mixed-use development that aims to achieve LEED certification. To encourage electric-vehicle use, the team plans to install EV charging stations in the parking garage. The project site is in a region where 70% of electricity comes from renewable sources.
To align with LEED strategies for sustainable transportation, what consideration should the project team prioritize when installing the EV charging stations?
答案:B
解題說明:
The project should prioritize the proportion of total parking spaces equipped with qualifying EV charging infrastructure. LEED transportation requirements generally evaluate whether a sufficient percentage of parking capacity supports electric vehicles, ensuring that charging access is meaningful relative to project size. Real-time energy monitoring can improve operational management and provide useful consumption information, but it does not by itself establish adequate charger availability. Free parking may encourage EV use, but it is an operational incentive rather than the principal infrastructure criterion and may conflict with broader parking-demand-management goals. Because the regional electricity supply contains a high renewable share, vehicle electrification can provide substantial transportation-emissions benefits. Correctly sizing the number of charging stations therefore most directly supports accessible low-carbon transportation and LEED v5's transportation-decarbonization objectives.
問題 #110
Which site preparation and construction method contributes to earning the Materials and Resources Credit, Construction and Demolition Waste Management?
答案:C
解題說明:
The Materials and Resources Credit, Construction and Demolition Waste Management aims to reduce the amount of construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials. According to the LEED v4 Reference Guide for Building Design and Construction, one of the options to achieve this credit is to divert at least 50% of the total construction and demolition material from disposal and recycle or salvage at least three material streams1. Therefore, salvaging and recycling 50% of the existing materials (based on volume) generated during site demolition for three material streams would contribute to earning this credit. The other options are not related to this credit, but to other credits or prerequisites, such as Sustainable Sites Prerequisite: Construction Activity Pollution Prevention1, Materials and Resources Prerequisite: Storage and Collection of Recyclables1, and Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials1.
Reference:
* LEED v4 Reference Guide for Building Design and Construction, Materials and Resources Credit: Construction and Demolition Waste Management, page 5481
* LEED v4 Construction and Demolition Waste
問題 #111
Which of the following should be evaluated to assess a project's human-use and health impacts?
答案:A
解題說明:
Access to medical services is a direct determinant of community and occupant health and should therefore be evaluated in a human-impact assessment. The assessment examines how the project may affect people who use the building or live in the surrounding community, including vulnerable populations and groups that may experience unequal access to essential resources. Evaluating healthcare access can reveal whether occupants have reasonable proximity to clinics, hospitals, emergency services, preventive care, and other health-supporting facilities. Transportation access may also influence human outcomes, but the option is framed broadly and does not specifically measure health-service availability. Proximity to manufacturing plants is relevant only when linked to documented exposure, pollution, employment, or environmental-justice concerns. LEED v5 explicitly prioritizes health, resilience, equity, and community quality of life.
問題 #112
A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of
答案:D
解題說明:
According to the LEED v4 Reference Guide for Building Design and Construction, Option 1 of the Site Development - Protect or Restore Habitat credit requires restoring 25% of the site area (including the building footprint) with native or adapted vegetation1. To achieve exemplary performance, the project must double the credit requirements and restore 50% of the site area2. In this case, the site area is 100,000 ft2 (9 290 m2), so the project must restore 50,000 ft2 (4 645 m2) with vegetation. The project already has 35,000 ft2 (3 250 m2) of native vegetated open space, so it needs to add another 15,000 ft2 (1 395 m2) of vegetation. Since the on-grade surface is fully occupied by the building footprint and the asphalt parking, the only option is to incorporate a vegetated roof. Therefore, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of 15,000 ft2 (1 395 m2). Reference: SS Credit Site Development - Protect or Restore Habitat, LEED v4 Reference Guide for Building Design and Construction13
問題 #113
......
LEED-AP-BD-C測試題庫: https://www.newdumpspdf.com/LEED-AP-BD-C-exam-new-dumps.html
此外,這些NewDumps LEED-AP-BD-C考試題庫的部分內容現在是免費的:https://drive.google.com/open?id=1W-AhowSc8BLMMvzBZn9uZkTiWl__vcV9