| Section | Objectives |
|---|---|
| Indoor Environmental Quality | - Occupant health and comfort
|
| Integrative Strategies | - Integrative design process and early project analysis
|
| Water Efficiency | - Indoor and outdoor water use reduction
|
| Materials and Resources | - Sustainable material selection and waste reduction
|
| Regional Priority | - Geographically specific environmental priorities
|
| Energy and Atmosphere | - Energy performance optimization
|
| Innovation | - Innovative strategies and exemplary performance
|
| Location and Transportation | - Site selection and access
|
| Sustainable Sites | - Site impact mitigation
|
LEED-AP-BD-C学習教材の最高のブランドは、期待を超えるものだと信じています。彼らUSGBCは仕事をするだけでなく、より深くなり、私たちの生活の布になります。したがって、有名なブランドとしての当社は、LEED-AP-BD-C実践ガイドの提供に非常に成功しているにもかかわらず、現状に満足することはなく、常にLEED-AP-BD-C試験トレントの内容を常に更新していく所存です。 LEED-AP-BD-C試験に関する最新情報を保持します。 LEED-AP-BD-C試験問題を使用すると、LEED-AP-BD-C試験に合格して夢のような認定を取得できます。
質問 # 293
A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies, where would CO2 monitors need to be located?
正解:C
解説:
According to theLEED V5Reference Guide for Building Design and Construction, the Carbon Dioxide Monitoring strategy requires CO2 monitors to be located in each densely occupied space, which is defined as a space with a design occupant density of 25 people or more per 1,000 square feet (93 square meters).This strategy is intended to provide feedback on ventilation system performance and indoor air quality12Reference:1:LEED V5Reference Guide for Building Design and Construction, Indoor Environmental Quality Credit: Enhanced Indoor Air Quality Strategies, Option 2: Additional Enhanced IAQ Strategies, Strategy 3: Carbon Dioxide Monitoring, page 704.2:LEED V5Reference Guide for Building Design and Construction, Glossary, page 1019.
質問 # 294
What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?
正解:B
解説:
According to the LEED Reference Guide for Building Design and Construction1, the Integrative Process Prerequisite, Integrative Project Planning and Design, requires the project to assemble an integrated project team that includes at least four key project team members, in addition to the owner or owner's representative.
The key project team members are those who have the authority and responsibility to make design decisions and implement them during construction. The integrated project team should include professionals from different disciplines, such as architecture, engineering, landscape, interior design, construction, commissioning, operations, and maintenance. The integrated project team should collaborate throughout the project phases, from discovery to occupancy, to achieve the project goals and optimize the building performance.
質問 # 295
Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite,Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?
正解:A
解説:
Explanation
The Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance:
ASHRAE 50% Advanced Energy Design Guide allows projects to follow the recommendations of the ASHRAE 50% Advanced Energy Design Guides (AEDGs) for different building types and climate zones. The AEDGs provide design guidance for buildings that use 50% less energy than those built to the requirements of the ANSI/ASHRAE/IES Standard 90.1-2004 commercial code1. However, not all building types and sizes are covered by the AEDGs. According to the LEED Reference Guide for Building Design and Construction2, the following building types and sizes are eligible for this option:
* Small to Medium Office buildings up to 100,000 ft2 (9 290 m2)
* Medium to Large Retail buildings up to 100,000 ft2 (9 290 m2)
* K-12 School buildings up to 200,000 ft2 (18 580 m2)
* Warehouse and Distribution Center buildings up to 500,000 ft2 (46 450 m2) Therefore, among the given options, only the school project is eligible to pursue this option, as it falls within the size limit for the K-12 School AEDG3.
References:
* LEED Reference Guide for Building Design and Construction v4
* Minimum Energy Performance - ASHRAE 90.1 - 2010
* ASHRAE 50% Advanced Energy Design Guide for K-12 School Buildings
* Advanced Energy Design Guides | Department of Energy
質問 # 296
A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?
正解:D
解説:
Explanation
The renewable energy option is economically feasible if the present value of the utility cost savings over the lifetime of the system is greater than or equal to the present value of the higher initial cost of the system. This means that the system will pay for itself and generate net savings in the long run. The utility cost savings depend on the amount of energy produced by the solar thermal panel, the price of natural gas, and the inflation rate. The higher initial cost depends on the size, type, and installation of the solar thermal panel.
References:
* Solar Thermal: Complete Guide to the Pros, Cons and Costs
* Renewable Energy vs Natural Gas - How The Costs Stack Up
* Is Solar Cheaper Than Natural Gas? - PowerSouth Energy Cooperative
* LEED Reference Guide for Building Design and Construction v4
質問 # 297
A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?
正解:C
解説:
Explanation
The correct answer is C, the Cx agent for the project must conduct or oversee the Cx of the PV system.
According to the LEED v4 Reference Guide for Building Design and Construction, the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, requires that all energy-related systems, including renewable energy systems such as PV, be commissioned by an independent commissioning agent (CxA) or a qualified member of the project team who reports to the owner. The CxA or the qualified team member must perform or oversee all commissioning activities, including developing a commissioning plan, reviewing design documents and submittals, verifying installation and performance, and preparing a commissioning report12 References: 1: LEED v4 Reference Guide for Building Design and Construction, Energy and Atmosphere Prerequisite: Fundamental Commissioning and Verification, page 562. 2: LEED v4 Reference Guide for Building Design and Construction, Glossary, page 1020.
質問 # 298
......
PassTestのUSGBCのLEED-AP-BD-C試験トレーニング資料はあなたに時間とエネルギーを節約させます。あなたが何ヶ月でやる必要があることを我々はやってさしあげましたから。あなたがするべきことは、PassTestのUSGBCのLEED-AP-BD-C試験トレーニング資料に受かるのです。あなた自身のために、証明書をもらいます。PassTest はあなたに必要とした知識と経験を提供して、USGBCのLEED-AP-BD-C試験の目標を作ってあげました。PassTestを利用したら、試験に合格しないことは絶対ないです。
LEED-AP-BD-C試験時間: https://www.passtest.jp/USGBC/LEED-AP-BD-C-shiken.html
P.S. PassTestがGoogle Driveで共有している無料かつ新しいLEED-AP-BD-Cダンプ:https://drive.google.com/open?id=1MrSOrinOcbUUrIGjRTRcPHD9wjqwFeOJ