あるAPIのAPI-SIEEテストトレントに関しては、JpshikenのAPI-SIEEガイドトレントが有効であるかどうかを示す最も強力な証拠となるのはパスレートのみであるため、パスレートが最高の広告になるというのが常識です。 有用かどうか。 すべてのお客様のフィードバックからの統計によると、API-SIEEテストトレントの指導の下で試験を準備したお客様の間でのAPI-SIEE試験問題のSource Inspector Electrical Equipment合格率は、 98%から100%に達しました。
| Certification Vendor: | API |
|---|---|
| Exam Name: | API SIEE - Source Inspector Electrical Equipment |
| Exam Number: | API-SIEE |
| Certificate Validity Period: | 3 years |
| Related Certifications: | API SIEE - Source Inspector Electrical Equipment |
| Available Languages: | English |
| Exam Price: | USD $380 member / USD $500 non-member |
| Exam Format: | Closed-book, Multiple-choice |
| Passing Score: | Set passing scaled score |
| Exam Duration: | 195 minutes |
| Real Exam Qty: | 110 questions, 100 scored |
| Sample Questions: | API API-SIEE Sample Questions |
| Exam Way: | In-person test center or remote proctored exam |
| Pre Condition: | Prequalification is required. Minimum electrical experience depends on education and background, ranging from 2 to 5 years. |
一つの試験だけでは多くの時間を無駄にする必要がありません。API-SIEE認定試験が大変難しいと感じて、多くの時間を取らなければならないとしたら、ツールとしてJpshikenのAPI-SIEE問題集を利用したほうがいいです。この問題集はあなたに時間を節約させることができますから。もっと重要なのは、この問題集はあなたが試験に合格することを保証できますから。この問題集よりもっと良いツールは何一つありません。試験の準備をするのにたくさんの時間を無駄にするより、そんな時間を利用してもっと有意義なことをしたほうがいいです。ですから、はやくJpshikenのサイトに行ってもっと多くの情報を読みましょう。この素晴らしきチャンスを逃したらきっと後悔しますよ。
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
| トピック 7 |
|
| トピック 8 |
|
| トピック 9 |
|
| トピック 10 |
|
質問 # 95
What tool is designed to measure mechanical oscillations?
正解:A
解説:
The correct answer isD. Vibration Meter. A vibration meter is specifically intended to measuremechanical oscillations, usually in terms of displacement, velocity, or acceleration. In source inspection of large electrical equipment, especiallyelectric motors over 500 HP, vibration measurement is important because excessive vibration can indicate problems such as rotor imbalance, shaft misalignment, bearing defects, looseness, soft foot, resonance, or installation errors. Since the API source inspection guide covers surveillance and verification activities for major rotating electrical equipment, understanding the purpose of vibration- measuring instruments is directly relevant to factory testing, condition verification, and acceptance evaluation.
The other options are not correct for this function. Atachometermeasures rotational speed, not mechanical oscillation. Aspectroscopeis used for optical spectrum analysis and is unrelated to machinery vibration.
Anoscilloscopedisplays electrical waveforms and can show signals from sensors, but it is not the primary instrument designed specifically to measure machine vibration in routine inspection practice. Therefore, the best answer isVibration Meter, because it directly measures the mechanical oscillatory behavior of equipment.
質問 # 96
What is the purpose of a clamp meter?
正解:D
解説:
The correct answer isC. Aclamp meteris used to measureelectrical current externallywithout disconnecting the conductor or opening the circuit. It works by clamping around a conductor and sensing the magnetic field created by current flow, then converting that into a current reading. In practical inspection and test work, the instrument'spurposeis current measurement, not merely magnetic-field observation. That is why option C is the best answer.
Option A describes theoperating principlein a partial sense, but not the actual inspection purpose of the device. Options B and D are unrelated to clamp meters and instead refer to hazardous-area temperature classification concepts. In API-aligned source inspection and quality surveillance, proper use of electrical measuring instruments is essential when verifying test results, factory checkout activities, and equipment conformity. The guide emphasizes inspection and surveillance of electrical equipment categories such aselectrical systems, along with verification of testing and measurement activities as part of source inspection practice. Therefore, a clamp meter is correctly usedto externally measure current flowing through a conductor, makingoption Cthe verified answer.
質問 # 97
Which of the following is primarily concerned with providing confidence that quality requirements will be fulfilled rather than detection and curing of problems?
正解:C
解説:
The correct answer isDbecausequality assuranceis the function that focuses on giving confidence that the required level of quality will be achieved through planned and systematic activities. It is preventive in nature.
Rather than waiting for defects to appear and then detecting or correcting them, quality assurance establishes the framework of procedures, controls, audits, document management, qualification practices, and surveillance methods that help ensure the work is done correctly from the start.
By contrast,quality controlis more directly associated withdetectionof defects and nonconformities through inspection, examination, and testing of the product or process output.Inspectionis one part of quality control, not the broader confidence-building system.Quality planningis the activity of defining what standards, resources, acceptance criteria, and methods will be used, but it is not itself the ongoing function primarily described in the question.
In API-aligned source inspection practice, the inspector works within a quality system that relies on both assurance and control. However, when the emphasis is onproviding confidence that quality requirements will be fulfilled, the correct term isquality assurance, makingoption Dthe best answer.
質問 # 98
During the course of manufacturing the supplier/vendor may propose design changes that could impact cost, schedule and/or quality. In such cases, the source inspector should:
正解:A
解説:
The correct answer isDbecause the API source inspection approach makes a clear distinction between the responsibilities of thesupplier, thesource inspector, and thepurchaser. The source inspector is not the design authority and does not have the authority to approve engineering changes that may affect cost, delivery, performance, code compliance, or quality. When a vendor proposes a change during manufacturing, the proper action is to ensure that the proposed deviation or revision isformally documented in writingand submitted to thepurchaser for review and disposition.
This preserves document control, traceability, and contractual accountability. It also ensures that any effect on drawings, datasheets, inspection plans, certifications, testing requirements, and final acceptance is evaluated by the party with approval authority. Option A is incomplete because it implies the change may already have been made. Options B and C are incorrect because the inspector does not perform or approve cost-benefit justification for design changes. The inspector's role is to identify, document, report, and verify compliance with approved requirements, not to authorize modifications independently.
質問 # 99
What would the equipment pictured below be used for?
正解:B
解説:
The correct answer isC. Calibration of precision measuring equipment. The pictured item is agauge block set, also calledJo blocksorslip gauges. These are precision-ground blocks manufactured to extremely accurate dimensions and are primarily used as a reference standard forchecking and calibrating measuring instrumentssuch as micrometers, calipers, dial indicators, height gauges, and other dimensional inspection tools. In manufacturing and fabrication processes, source inspectors must be confident that the instruments used by the supplier are properly calibrated and traceable, because reliable measurement is essential for verifying tolerances, fit-up, machining accuracy, and component acceptability.
OptionBis close, but gauge blocks are generally not the direct tool used to measure the equipment itself during routine production inspection. Instead, they serve as areference standardto confirm the accuracy of the measuring devices that will perform those inspections. OptionAis incorrect because shaft alignment is typically checked using dial indicators, laser alignment tools, or similar methods. OptionDis also incorrect because spacing verification would use other dimensional tools, not this reference block set.
質問 # 100
......